My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4943
>
2300 - Underground Storage Tank Program
>
PR0506488
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:14 PM
Creation date
9/22/2020 2:30:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0506488
PE
2361
FACILITY_ID
FA0007458
FACILITY_NAME
7-ELEVEN INC #32190
STREET_NUMBER
4943
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
CURRENT_STATUS
01
SITE_LOCATION
4943 S HWY 99
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TESTABLE PROCEDURE ONLY, FOR STANDARD MOD- STEP 3T: DETERMINE CABLE LENGTH <br /> ELS, PROCEED TO NEXT PAGE. Run cable along upper tube and over the top plate on <br /> the float bracket as shown . With the float in the down <br /> STEP 'IT: INSTALL SOCKET ADAPTOR ASSY position (as shown in Figure 37 ) align loop In cable with <br /> Put cable thru threads in Inlet tube and out thru cable rivet and top hole in float bracket. Use the rivet as a <br /> port on side of inlet tube. Thread the socket adaptor template to size the loop in the cable and pull cable <br /> assembly finger tight into the inlet tube. Note: theca- tight and crimp ferrule with crimping toot / pliers onto <br /> ble port on the inlet tube must be in line with the float cable at this location . Trim excess cable with wire cut- <br /> as shown previously in Figure 8A . ter / scissors . For reference, from the seam where the <br /> upper tube and valve body meet to the end of the cable <br /> Socket after trimming will require approximately 3.5" of cable. <br /> adaptor <br /> assembly <br /> Cable over float bracket <br /> r <br /> Cable Seam <br /> port <br /> Figure3T <br /> i <br /> STEP 4T: ATTACH CABLE TO FLOAT BRACKET <br /> Figure 1T Ensure cable is over the float bracket. Using the sup <br /> plied rivet align loop In cable with top hole in float <br /> STEP 2Tt PASS CABLE THRU FERRULE bracket and pass rivet thru cable loop and float bracket <br /> Pass cable thru ferrule. Loop cable and then pass cable hole. Using rivet tool for 1 /8" dia mandrel attach rivet <br /> back thru ferrule. Keep ferrule loose until cable length and cable to the float bracket. See. last page for list of <br /> is determined in the next step. Note. if cable end frays replacement cable parts. <br /> It may be necessary to trim the cable again to pass thru <br /> ferrule. Attach rivet to top hole <br /> 1 /8" mandrel 1f� � <br /> rivet �._..L�. <br /> ON <br /> Ferrule <br /> Flgure 4'T „� <br /> Trim �- STEP 5T: ENSURE PROPER CABLE OPERATION <br /> cable , ,, •-� <br /> Unthread the socket adaptor assembly from the inlet <br /> after tube and ensure float and poppet move freely when <br /> step 3T Loop r� socket adaptor assembly Is pulled on. It should only <br /> require 3" to 4" of movement in order to actuate the <br /> F1gure2T float and poppet. Thread socket adaptor assembly fin- <br /> ger tight into inlet tube after testing. <br /> 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.