My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4943
>
2300 - Underground Storage Tank Program
>
PR0506488
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:14 PM
Creation date
9/22/2020 2:30:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0506488
PE
2361
FACILITY_ID
FA0007458
FACILITY_NAME
7-ELEVEN INC #32190
STREET_NUMBER
4943
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
CURRENT_STATUS
01
SITE_LOCATION
4943 S HWY 99
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix B <br /> 7950 Overfill Valve in Tank Shut off level Worksheet <br /> Important: This is meant to be supplemental worksheet and not a substitute to following the installation <br /> manual instructions. All length measurements are in inches. Please contact the Authority Having Jurisdlc- <br /> tion (AHJ) and review local, state, and national codes to determine the regulatory requirements governing <br /> shut-off capacity in your region, as well as take Into account other considerations such as extreme tank tilt. <br /> Take the following measurements with the valve in- <br /> stalled in the tank: <br /> Distance from the 71 SO inlet tube flange to the cast <br /> lug in the 71 SO body (see figures), upper tube length. <br /> Note. the Upper Tube Length must be at least 16" to <br /> Include the protective bend in the tube. <br /> (D) = <br /> Distance from the 71 SO Inlet tube flange to the top and <br /> bottom of lower tube, valve length. ( D) <br /> (W) Upper <br /> (0) — Tube <br /> Distance from the 71 SO inlet tube flange to the bottom <br /> of the tank. Note: If a tank bottom protector is present it <br /> may be necessary to add this thickness to dimension <br /> (OPW 6111 & 61 TP models add 0.6') (w) Valve <br /> Length, <br /> bottom of <br /> From the tank calibration chart provided by tank mane- cut <br /> facturer find the dipstick number (y) which corresponds <br /> to the 100% volume. (8) <br /> (Y) = To Tank <br /> 1 . To determine shutoff percentage: T nk <br /> Subtract upper tube length (D) from distance to tank (U) Valve Chart <br /> bottom (g) Length, 100% Vol- j <br /> (X) n ( B) (p) „ 2' top of cut ume Dip- <br /> stick <br /> Using the tank calibration chart provided by the tank <br /> manufacturer determine the tank capacity at the cal- <br /> culated (X) dimension and the 100% volume (Y) tank <br /> capacity. <br /> (X) tank capacity in gallons = <br /> (Y) tank capacity in gallons = ...--- - — -- - - <br /> SO% = (X) capacity ! (Y) capacity x100 = <br /> Note: The overfill valve must be installed per AM require- <br /> ments and all applicable local, state, and national codes. If <br /> the overfill valve is set above the allowable shut-off percent- <br /> age the overfill valve must be removed and replaced. For <br /> reference 40 CFR part 280 Subpart a Section 280.20 overfill <br /> valve2x should be set to o meximurn of 9594. <br /> 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.