My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4943
>
2300 - Underground Storage Tank Program
>
PR0506488
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:14 PM
Creation date
9/22/2020 2:30:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0506488
PE
2361
FACILITY_ID
FA0007458
FACILITY_NAME
7-ELEVEN INC #32190
STREET_NUMBER
4943
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
CURRENT_STATUS
01
SITE_LOCATION
4943 S HWY 99
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix A <br /> 71 SO Overfill Valve Upper Tube Calculation Worksheet <br /> Important This is meant to be supplemental worksheet and not a substitute to following the installation <br /> manual instructions. All length measurements are In Inches. Please contact the Authority Having Jurisdic- <br /> tion (AHJ) and review local, state, and national codes to determine the regulatory requirements governing <br /> shut-off capacity in your region, as well as take into account other considerations such as extreme tank tilt. <br /> Desired tank capacity for shut-off; SO%i <br /> Dipstick Number on Tank Chart that corresponds to 100% volume (Y) (y) <br /> Dipstick Number on Tank Chart that corresponds to SO% (X) � <br /> _ . _ ) <br /> Upper Tube Reference Number Z=Y-X (Z) <br /> Upper Tube Depth Inside Tank C = Z-2 <br /> Distance from top sealing surface for 71 SO Lip' to inside the (C) <br /> top of Storage Tania A <br /> For gn-Testable 77 SO models only <br /> In all cases for nonAestable 71 SO models, the top of the valve body must protrude at least 61/2" into the tank to <br /> provide a minimal clearance for proper operation.3 Additionally the total Upper Tube Length must beat least 16" <br /> of length to include the protective bend in the tube. <br /> Is C less than 61/z" Yes / No <br /> I <br /> If NO, Upper Tube Length (b)= C + A <br /> If YID, Upper Tube Length (D)= 6 'h "+ A <br /> Upper Tube Length = <br /> For Tes abig 73 SO models only <br /> In all cases for Testable 71 SO models, the top of the valve body must protrude at least 6W into the tank to provide <br /> a minimal clearance for proper operation.3 Additionally the total Upper Tube Length must be at least 141/2u of <br /> length to include the protective bend In the tube. <br /> Is C less than 5" Yes / No <br /> If NO, Upper Tube Length (D)= C + A 1 '/z " <br /> IfYE.% Upper Tube Length (D) 6 'h" + A 1 '/z " <br /> Upper Tube Length = <br /> ' Sealing surface may be the top of the Face Seal Adaptor, the built to sealing ledge inside some spill containers, or on non-vapor <br /> tight applications the top of the pipe nipple <br /> a Some Underground Storage tanks utilize a manway system at the top. Make sure to use the top of the storage tank formeasure- <br /> ment and not to top of the manway. Consultyour underground tank manufacturer for height of the manway <br /> a This measurement is taken from the seam where the upper tube is attached to the valve body to the Inside ofthe tank top. <br /> 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.