My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2526
>
2200 - Hazardous Waste Program
>
PR0514248
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2020 5:20:11 PM
Creation date
9/22/2020 4:37:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0514248
PE
2294
FACILITY_ID
FA0010245
FACILITY_NAME
DTE STOCKTON LLC
STREET_NUMBER
2526
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14503009
CURRENT_STATUS
01
SITE_LOCATION
2526 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
355
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency for approval prior to acceptance of waste. planning approvals, and <br /> during subse uent operations. <br /> Steps to Compliance: <br /> A. This measure will be included as a condition of approval in the CUP. <br /> Inspections and monitoring would be conducted by the EHSD. <br /> #16 MM 4.5-5. The Project shall provide a worker Prior to commencement of Environmental Health <br /> 4.5-3 changing facility (see Section 3.3.2). This facility will biosolids disposal operations Services Department <br /> provide an area where all workers will be required to permitted by planning <br /> remove used Personal Protective Equipment (PPE) approvals, and during <br /> prior to leaving the biosolids landfill area, and where subsequent biosolids disposal <br /> people entering the facility will have to change into operations. <br /> their PPE stored at the worker changing facility. The <br /> provision of the worker changing facility is to provide <br /> hygienic conditions to protect the safety of the workers <br /> while preventing the use of work clothes and boots <br /> outside of the biosolids work environment. The <br /> changing facility will include portable toilet and <br /> washing facilities, and a boot rinsing area for the <br /> workers. <br /> Steps to Compliance: <br /> A. The project applicant will provide proposed plans for the mobile worker <br /> changing facility to the EHSD for approval. <br /> B. Upon receipt of EHSD approval, the proposed facility shall be provided <br /> and maintained. <br /> #17 MM 4.5-6. Prior to commencement of Division of Oil, Gas and <br /> 4.5-4 operations permitted by Geothermal Resources <br /> a) To prevent and avoid any future impacts to the planning approvals, and (DOGGR) <br /> integrity of the well casing and soil column, the during subsequent operations. <br /> established 50-foot diameter existing soil <br /> column buffer around the plugged and <br /> abandoned oil well will be marked and <br /> 16 <br /> Final Board of Supervisors 3/15/16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.