My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2526
>
2200 - Hazardous Waste Program
>
PR0514248
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2020 5:20:11 PM
Creation date
9/22/2020 4:37:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0514248
PE
2294
FACILITY_ID
FA0010245
FACILITY_NAME
DTE STOCKTON LLC
STREET_NUMBER
2526
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14503009
CURRENT_STATUS
01
SITE_LOCATION
2526 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
355
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Steps to Compliance: <br /> A. The project applicant shall submit a Report of Waste Discharge to the <br /> RWQCB for subsequent issuance of Waste Discharge Requirements <br /> (WDR) and provide evidence to EHSD of such submittal. <br /> B. The project applicant shall submit copies of the'WDR to the Kern <br /> County Planning Department to demonstrate that all the applicable <br /> waste landfill siting, geologic, and construction standards have been <br /> met. <br /> C. Leachate collection and recovery system project plans shall be <br /> submitted to the RWQCB and EHSD for approval. Evidence of the <br /> RWQCB's and EHSD's approval shall be provided to the Planning <br /> Department. <br /> D. Leachate management would be conducted in compliance with all <br /> regulatory requirements. Copies of all required sampling, analysis and <br /> reuse/disposal of leachate shall be provided to the Planning Department <br /> and EHSD. <br /> E. The project applicant shall perform quarterly sampling and analysis of <br /> the groundwater monitoring well network, the results of which will be <br /> included in the annual report submitted to the RWQCB, the Kern <br /> County Planning Department, and the EHSD. Inspections and <br /> monitoring will be conducted by the RWQCB and the EHSD. <br /> #24 MM 4.6-2. Prior to commencement of Environmental Health <br /> 4.6-1 biosolids disposal operations Services Department <br /> The Project must incorporate the following design and permitted by planning Regional Water Quality <br /> operational features to mitigate the potential for approvals, and during Control Board <br /> groundwater degradation from truck and equipment subsequent biosolids disposal <br /> rinse-out: operations. <br /> Biosolids delivery trucks and Project equipment leaving <br /> the biosolids deposition area must be rinsed prior to <br /> reaching a public road. <br /> Rinse facility design shall include: <br /> 22 <br /> Final Board of Supervisors 3/15/16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.