Laserfiche WebLink
• A surfaced and curbed facility containment area. <br /> ■ A mobile or skid-mounted high pressure water or <br /> steam cleaning wash rack system <br /> • A rinsate recirculation storage tank <br /> • Provision for disposal of rinsate and rinsate solids <br /> Final design features of,and operational procedures for <br /> the rinsate facility must be approved by the Local <br /> Enforcement Agency prior to initiation of biosolids <br /> disposal. <br /> Steps to Compliance: <br /> A. The project applicant shall submit proposed plans and operational <br /> procedures for the rinsate facility to the EHSD for approval. <br /> B. Upon EHSD approval, the project applicant shall provide the specified <br /> facility and equipment. <br /> C. Rinsate wastewater sampling, analysis and reporting shall be in <br /> accordance with the Project's revised Waste Discharge Requirements, <br /> and associated sampling and reporting program. Copies of submittals <br /> shall also be provided to the Planning Department and EHSD. <br /> Inspections and monitoring will be conducted by the EHSD and <br /> RWQCB as-appropriate. <br /> Justification: The Project has the potential to impact hydrology and water quality during Project operations. Changes in or alterations have been <br /> incorporated into the Project that substantially lessen the potentially significant effects as identified in the Final EIR, so that environmental effects <br /> after such mitigation are reduced to a less than significant Ievel. <br /> Trans.'orfafion ►4i 'ci'T'raffr'c�--• ..,�� � ��:-�, _�:;�'. ,��:�. �•��n � :� <br /> #25 MM 4.8-1. To improve Holloway Road, the applicant Prior to commencement of L Kern County Roads <br /> 4.8_1 will be responsible for a proportionate share of the operations permitted by Department <br /> costs to improve the full-width of the road to Highway planning approvals. <br /> 46 based on the increase in truck traffic volumes <br /> generated by this Project. Costs are $96,460.00 (based <br /> on 1,378 tons of material) as calculated by the Kern <br /> 23 <br /> Final Board of Supervisors 3115116 <br />