Laserfiche WebLink
SPCC Plan:Ralph Hayes&Son,Inc., 20177 S.McArthur Dr., Tracy,Califomia(October 2020) i <br /> TABLE OF CONTENTS <br /> 1. INTRODUCTION....................................................................................................... 1 <br /> 1.1 SPCC Rule Compliance................................................................................... 1 <br /> 1.2 Management Approval of SPCC Plan .............................................................. 3 <br /> 1.3 Professional Engineer Certification ..................................................................4 <br /> 1.4 Location of the SPPC Plan............................................................................... 5 <br /> 1.5 Plan Review (40 CFR 112.3 and 112.5)........................................................... 5 <br /> 1.5.1 Changes in Facility Configuration............................................................................. 5 <br /> 1.5.2 Scheduled Plan Reviews and Revisions-:.....*"*"***............­­..........................*"**'5 <br /> 1.5.3 Cross-Reference with SPCC P1an Provisions.......................................................... 6 <br /> 2. GENERAL FACILITY INFORMATION (REF. 112.7).................................................. 8 <br /> 2.1 Facility Location ............................................................................................... 8 <br /> 2.2 Facility Description ........................................................................................... 8 <br /> 2.3 Site Drainage Characteristics........................................................................... 8 <br /> 2.4 Conformance with Requirements and Compliance with all Applicable parts <br /> (Ref. 112.7(x)(1) and (a)(2)) ............................................................................ 9 <br /> 2.5 Facility Layout (Ref. 112.7 (a)(3))..................................................................... 9 <br /> 2.5.1 Product Types and Storage Capacity(Ref 112.7(a)(3)(i))....................................... 9 <br /> 2.6 Evaluation of Discharge Potential..................................................................... 9 <br /> 3. DISCHARGE PREVENTION-GENERAL SPCC PROVISIONS............................... 10 <br /> 3.1 Discharge Prevention Measures (Ref 112.7 (a)(3)(ii)..................................... 10 <br /> 3.2 Discharge and Drainage Controls (Ref 112.7 (a)(3(iii)) .................................. 10 <br /> 3.3 Countermeasures ((Ref 112.7 (a)(3)(iv)) ....................................................... 10 <br /> 3.4 Contaminated Material Disposal (Ref 112.7 (a)(3)(v)).................................... 11 <br /> 3.5 Emergency Contact List (Ref 112.7 (a)(3)(vi)) ............................................... 11 <br /> 3.6 Discharge Response...................................................................................... 12 <br /> 3.6.1 Procedures for Release Response (Ref 112.7(a)(5))............................................ 12 <br /> 3.6.2 Procedures for Release Reporting(Ref 112.7(a)(4))............................................. 12 <br /> 4. PREDICTION OF SPILL CHARACTERISTICS (REF. 112.7(b)).............................. 13 <br /> 5. CONTAINMENT AND DIVERSIONARY STRUCTURES (REF. 112.7 (c)) .............. 13 <br /> 5.1 Containment Systems.................................................................................... 14 <br /> 5.1.1 Bulk Containment Structure.................................................................................... 14 <br /> 5.1.2 Double-Walled Tanks.............................................................................................. 14 <br /> 5.1.3 Dispenser Containment(Active)............................................................................. 14 <br /> 5.2 Transfer Areas ............................................................................................... 14 <br /> 6. DETERMINATION OF PRACTICABILITY (REF. 112.7 (d)) .................................... 14 <br /> 7. INSPECTIONS/TESTS AND RECORDS (REF. 112.7 (e))...................................... 14 <br /> 8. PERSONNEL TRAINING (REF. 112.7 (f))............................................................... 15 <br /> 9. SECURITY (REF. 112.7 (g)).................................................................................... 15 <br /> 9.1 Facility Perimeter............................................................................................ 15 <br /> 9.2 Valves ............................................................................................................ 15 <br /> 9.3 Facility Lighting .............................................................................................. 15 <br /> McGinley Project:RHSOOI McGinley&Associates Inc. <br />