Laserfiche WebLink
SPCC Plan:Ralph Hayes&Son,Inc.,20177 S.McArthur Dr., Tracy, California(October 2020) if <br /> 10. TANK TRUCK LOAD INGIUNLOADING RACK (REF. 112.7(h) &112.8(d)) ............. 15 <br /> 11. ABOVEGROUND CONTAINER REPAIR, ALTERATION, RECONSTRUCTION OR <br /> CHANGE IN SERVICE (REF. 112.7(i)) ................................................................... 16 <br /> 12. CONFORMANCE WITH APPLICABLE STATE AND LOCAL REQUIREMENTS <br /> (REF. 112.70))......................................................................................................... 16 <br /> 13. QUALIFIED OIL FILLED OPERATIONAL EQUIPMENT (REF. 112.7(k))................ 16 <br /> 14. DISCHARGE PREVENTION - SPCC PROVISIONS FOR ONSHORE FACILITIES <br /> (EXCLUDING PRODUCTION FACILITIES) ........................................................... 16 <br /> 14.1 Facility Drainage (REF. 112.8 (b)).................................................................. 16 <br /> 14.2 Bulk Storage Containers (REF. 112.8 (c)) ..................................................... 16 <br /> 94.2.9 Construction (40 CFR 112.8(c)(1))........................................................................ 16 <br /> 94.2.2 Secondary Containment(40 CFR 112.8(c)(2))....................................................... 16 <br /> 14.2.3 Drainage of Diked Areas(40 CFR 112.8(c)(3))...................................................... 16 <br /> 14.2.4 Corrosion Protection (40 CFR 192.8(c)(4))............................................................. 17 <br /> 14.2.5 Partially Buried or Bunkered Storage Tanks(40 CFR 112.8(c)(5))........................ 17 <br /> 14.2.6 Inspections and Tests(40 CFR 112.8(c)(6))........................................................... 17 <br /> 14.2.7 Heating Coils(40 CFR 112.8(c)(7))........................................................................ 18 <br /> 14.2.8 Overfill Prevention Systems(40 CFR 112.8(c)(8))................................................. 18 <br /> 14.2.9 Effluent Treatment Facilities (40 CFR 112.8(c)(9))................................................. 19 <br /> 14.2.10 Visible Discharges (40 CFR 112.8(c)(10)) ......................................................... 99 <br /> 14.2.11 Mobile and Portable Containers (55-gallon drums)............................................ 19 <br /> 15, TRANSFER OPERATIONS, PUMPING, AND IN-PLANT PROCESSES <br /> (40 CFR 112.8(d)) ................................................................................................... 19 <br /> McGinley Project:RHS001 McGinley&Associates Inc. <br />