Laserfiche WebLink
SPCC Plan:Ralph Hayes&Son,Inc.,20977 S.McArthur Dr., Tracy,California(October 2020) 2 <br /> Section 1.3 of this Plan. <br /> • Amend the SPCC Plan within six (6) months whenever there is a change in facility <br /> design, construction, operation, or maintenance that materially affects the facility's <br /> spill potential. The revised Plan must be recertified by a Professional Engineer(PE). <br /> • Review the Plan on an annual basis. Update the Plan to reflect any "administrative <br /> changes" that are applicable, such as personnel changes or revisions to contact <br /> infon-nation, such as phone numbers. <br /> McGinley Project:RHS009 McGinley&Associates Inc. <br />