My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
20177
>
2800 - Aboveground Petroleum Storage Program
>
PR0545958
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2020 12:20:54 PM
Creation date
9/23/2020 9:49:56 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0545958
PE
2832
FACILITY_ID
FA0009323
FACILITY_NAME
RALPH HAYES & SON INC
STREET_NUMBER
20177
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95304
APN
21305013
CURRENT_STATUS
01
SITE_LOCATION
20177 S MACARTHUR DR
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SPCC Plan:Ralph Hayes&Son,Inc.,20977 S.McArthur Dr., Tracy, Callfornle(October 2020) 3 <br /> 1.2 Management Approval of SPCC Plan <br /> RHS is committed to the prevention of discharges of oil to .navigable waters and the <br /> envirotunent, and maintains the highest standards for spill prevention control and <br /> countermeasures through regular review,updating,and implementation of this Spill Prevention <br /> Control and Countermeasure Plan for its facility. <br /> I certify under penalty of law that this document and all attachments were prepared under my <br /> direction or supervision in accordance with a system designed to assure that qualified personnel <br /> properly gathered and evaluated the information submitted. Based on my inquiry of the person <br /> or persons who manage the system, or those persons directly responsible for gathering the <br /> information, the information submitted is, to the best of my knowledge and belief, true, <br /> accurate, and complete. I am aware that there are significant penalties for submitting false <br /> information, including the possibility of fine and imprisonment for knowing violations. <br /> As the manager responsible for the operation of this facility, I certify that the following SPCC <br /> Plan has my approval, that the resources necessary to carry out this plan have been and will <br /> continue to be made available, and that I have the authority to make this certification. <br /> Name,Title: IAYZa,Z �irlFa / , �= 7` <br /> Signature: �- <br /> Date: 69 <br /> McGinley Project.,RHS009 McGinley&Associates Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.