My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
20177
>
2800 - Aboveground Petroleum Storage Program
>
PR0545958
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2020 12:20:54 PM
Creation date
9/23/2020 9:49:56 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0545958
PE
2832
FACILITY_ID
FA0009323
FACILITY_NAME
RALPH HAYES & SON INC
STREET_NUMBER
20177
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95304
APN
21305013
CURRENT_STATUS
01
SITE_LOCATION
20177 S MACARTHUR DR
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SPCC Alan:Ralph Hayes&Son, Inc.,20977 S.McArthur Dr., Tracy,California(October 2020) 7 <br /> Table 3: SPCC Plan Crass-Reference <br /> SPCCt1) Cal�#'ornla Plan Sect�an Page Addendulm <br /> H&SCode <br /> 112.3(d) 1.3 Professional Engineer Certification 4 <br /> 1 12.3(e) 1.4 Location of SPCC Plan 5 <br /> 112.5 §25270.5(c) 1.5 Plan Review 5 Appendix D <br /> 112.7 §25270.6(a) 1.2 Management Approval 3 <br /> 112.7 1.5.3 Cross-Reference with SPCC Rule 6 Table 3 <br /> 112.7(a)(3) 2.General Facility Information 8 Figures 1-2 <br /> 112.7(a)(1)(2) 2.2 Conformance with Requirements and Compliance with all Applicable 9 <br /> Parts <br /> 112.7(a)(3) 23 Facility Layout 9 Figure 2 <br /> 1 12.7(a)(3)(iii) 2.4.1 Product Types and Storage Capacity 9 Table 4 <br /> 112.7(a)(3)(ii) 3.1 Discharge Prevention Measures 10 <br /> 112.7(a)(3)(iii) 3.2 Discharge and Drainage Controls t0 <br /> 112.7(a)(3)(iv) 3.3 Countermeasures 10 <br /> l 12.7(a)(3)(v) 3.4 Contaminated Material Disposal 1 I <br /> 112.7(a)(3)(vi) 3.5 Emergency Contac(List I I <br /> I12.7(a)(5) 3,6.1 Procedures for Release Response 12 1 Appendix E <br /> I12.7(a)(4) 3.6.2 Procedures for Release Reporting 12 Appendix E <br /> 112.7(b) §25270.8 4.Prediction of Spill Characteristics 13 Table 5 <br /> 112.7(c) 5.Containment and Diversionary Structures 13 <br /> 112.7(d) 6.Determination of Practicability 14 <br /> 112.7(c) 7.Inspections,Tests,and Records 15 <br /> 112.7(f) §25270.5(c) 8.Personnel,Training and Discharge Prevention Procedures 15 Appendix C <br /> 112.7(8) 9.Security 16 <br /> 112.7(h) 10.Tank Truck Loading/Unloading Rack 16 <br /> 1 12 7(i) 11.Aboveground Container Repair,Alteration,Reconstruction or Change l6 <br /> in Service <br /> 112.70) 12.Conformance with Applicable State and Local Requirements 16 <br /> 112.7(k) 13.Qualified Oil Filled Operational Equipment 16 <br /> 1 12.8(a) 14.Discharge Prevention-SPCC Provisions for Onshore Facilities 17 <br /> 112.8(b) 14.1 Facility Drainage 17 <br /> I12.8(c) 1 14.2 Bulk Storage Containers 17 <br /> 14.2.1 Constriction 17 <br /> 1 I2,8(c)(2) 14.2.2 Secondary Containment 17 Appendix F <br /> 112.8(c)(3) 14.2.3 Drainage of Diked Areas 17 <br /> 112.8(c)(4) 14.2.4 Corrosion Protection 17 <br /> 112,8(c)(5) 14.2.5 Partially Buried and Bunkered Storage Tanks 17 <br /> 112.8(c)(6) 14.2.6 Inspections and Tests 17 Table 6 <br /> Acndix B <br /> 1 12.8(c)(7) §25270.5(c) 14.2.7 licating Coils 18 <br /> 1 12.8(c)(8) 14.2,8 Overfill Prevention System 18 <br /> 112.8(c)(9) 14.2.9 Effluent Treatment Facilities 19 <br /> 112.8(c)(10) 14.2.10 Visible Discharges 19 <br /> 112.8(0)(11) 14.2.11 Mobile and Portable Containers 19 <br /> 112,8(d) 15.Transfer Operations,Pumping and In-Plant Processes t 9 Appendix G <br /> 1 12.20(e) Certification of Substantial Ham Determination Appendix A <br /> Only selected excerpts of relevant rule text arc provided.For a complete list of SPCC requirements,refer to the fill text of 40 CFR part 112. <br /> McGinley Project.RHS009 McGinley&Associates Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.