My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
1002
>
1600 - Food Program
>
PR0161567
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2022 2:09:47 PM
Creation date
9/23/2020 3:12:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0161567
PE
1617
FACILITY_ID
FA0000650
FACILITY_NAME
GAS & SHOP
STREET_NUMBER
1002
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102012
CURRENT_STATUS
01
SITE_LOCATION
1002 FRONTAGE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,o <br /> 000 <br /> Z4/ iz Z Z Z Z ZT ./ <br /> E-l� 0 <br /> .F <br /> 11 <br /> ooN <br /> a <br /> U <br /> W <br /> FS <br /> FS <br /> ' n ------------- <br /> iT <br /> C <br /> DINING KITCHEN UTILITY & E <br /> AREA AREA STORAGE <br /> AREA d <br /> ul-37-7-1 a) <br /> cn <br /> w O <br /> 1 /2" S.S W p_m <br /> ` ;---------�----- ~ a a <br /> 4"S.5 <br /> -fl FD <br /> 2"VTR <br /> -T <br /> 0 /2 2"S.S <br /> o <br /> --�- - - II II O Ol Lo <br /> • • • • L-,-J N Y <br /> w ` - Q <br /> 1 O` V <br /> w C C <br /> CONNECTED TO . "VTR a a <br /> PLUMBING PLAN EXISTING SEWER LINE <br /> U <br /> c <br /> 7 <br /> NOTES PLUMBING SCOPE OF THE WORK PLUMBING SYMBOL2 <br /> my <br /> w 8 <br /> 1. PROVIDE CLEANOUT AT 1 00' INTERVALS, 41. 1 °'m <br /> INSTALLATION NEW PREP SINK � VENT PIPE � GAS LINE CONNECTION ��,L <br /> OR FRANCTION THEREOF, CPC SECTION 707.4 2. INSTALLATION OF NEW 3 COMPARTMENT SINK FCO FLOOR CLEANOUT LAV LAVATORY z �$L co <br /> 2. PROVIDE CLEANOUTS FOR ALL BRANCHES 3. INSTALLATION OF NEW HAND SINK CO CLEANOUT o °'o o <br /> 5 AND LONGER, CPC SECTION 707.4 4. INSTALLATION OF NEW FLOOR DRAIN WC WATER CLOSET U)" <br /> 3. PROVIDE CLEANOUTS FOR URINALS, CPC 5. INSTALLATION OF NEW MOP SINK m FLOW CONTROL <br /> UR SECTION 707.4 6. INSTALLATION OF NEW FLOOR SINK O DIRECT WASTE CONNECTION URINAL Date: <br /> �� <br /> 4. PROVIDE APPROVED AUTOMATIC TRAP _ cr 0 GREASE TRAP 5/220 INDIRECT WASTE CONNECTION <br /> PRIMING DEVICES FOR THE FLOOR DRAINS, NOTESPIPE DOWN <br /> CPC SECTION 1007.0 ® FLOOR SINK C Fs <br /> VENT, CPC SECTION 901.0 ;le-. <br /> 5. ALL FIXTURES SHALL BE PROVIDE WITH A WHERE THE FIXTURES ARE LOCATED MORE THAN FLOOR DRAIN �— PIPE UP <br /> 6. THE MINIMUM SLOPE FOR DRAIN SHALL BE 60' FROM THE WATER HEATER. A RECIRCULATION 00 HOT & COLD WATER STUB OUT PIPE DROP <br /> 1/4 " PER 12" PUMP MUST BE INSTALLED IN ORDER TO ENSURE Sheet No: <br /> THAT THE HOT WATER REACHES THE FIXTURE AT e COLD WATER STUB OUT ----- PIPE DROP <br /> THE TEMPERATURE OF 120 DEGREES. HO HOT WATER STUB OUT PIPE DROP A6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.