GENERAL NOTES REVISIONS
<br /> 1 CERTAIN EQUIPMENT REQUIREMENTS NOTED ON THESE DRAWINGS NO. DESCRIPTION DATE
<br /> ARE DERIVED FROM OWNER-FURNISHED COORDINATION DRAWINGS.
<br /> CONTRACTOR TO VERIFY ACTUAL OWNER-FURNISHED EQUIPMENT
<br /> OCONNECTION REQUIREMENTS AND SCOPE OF WORK. CONTRACTOR TO
<br /> (E)RTU-8 5 1 O (E>1 v2"CW PROVIDE INSTALLATION OF ALL OWNER SUPPLIED PLUMBING
<br /> (E)RTU-8 (E)RTU-7
<br /> (E)I"HW ROOF E 3/4"MPG O FIXTURES.
<br /> RE:PO.1 (E)3/4"MPG (E)RTU-7 (E)1"HW ( )
<br /> ROOF O ROOF O (E)1 1/4"CD (E)3/4"CD MOUNTED RE:PO.1 ROOF CD (DRE:PO.1 1 RE:PO.1 (E)RTU 6 2 CONTRACTOR TO FIELD VERIFY LOCATION OF EXISTING SANITARY,
<br /> O MOUNTED MOUNTED O RE:PO RE:PO 1 (74 MBH) I� _ (E)3/4"NG MOUNTED ROOF DOMESTIC, AND GAS LINES AND VERIFY AVAILABLE INVERT DEPTHS
<br /> (E)2"VTRf- - O f - 1 CD� � MOUNTED
<br /> (74 MBH) I
<br /> W 74 MBH PRIOR TO BEGINNING WORK.
<br /> -1 1 — — — — — — — — — — — — — — — — — — — — — — — — — — — —�� — — — — — — — — — — —I azI I� — — — — — — — — — — — — — — — — — — — — — — — — — —
<br /> C - - - - - - -- - - - - - - -70 - C C - - - - - - - - - - - - - - - - 0 - - - 3 CONTRACTOR TO VERIFY INVERTS OF MANHOLES AND DOCUMENT
<br /> -J _ I I I I t7 - J I H� ••
<br /> i Effi ^1 i �_ ? 1 1 i ( ) 1 z I — (E)3/4" � I �1'� w P PING TO EMOVE I)FILTERED WHETHER BACKCHECK VALVE IS REQUIRED.
<br /> N E RTU-6
<br /> B �--(E)I"CD o (E)1"C M w 3 _J I ROOF 6 (T�> 4 THE INTENTION OF THE CONTRACT DOCUMENTS IS TO INCLUDE ALL
<br /> I MOUNTED B _ — — - u? _ I � I I WATER DISPENSER _
<br /> U O 1 O 3/4"— w, O REASONABLY INFERABLE AASDBEING, OR FURNISHING, INSTALLATION
<br /> Q �, A (E)ROOF MOUNTED 1 (E)3" SS A 1 1 I I W 10 M
<br /> (E)3/4 N (E)1 1/4 _ I 1
<br /> (E)2"VTR I W w CD PIPING(TYP.) TO BELOW -v, ^ (E)3 SS } - (E)RTU-3 1 ���� (E)RO SYSTEM WITH AND TESTING, COMPLETE AND READY FOR SAFE OPERATION OF THE
<br /> -- _ E 3 VTR TO BELOW I I J O SYSTMS DESCRIBED HEREIN.
<br /> ❑ _ 1 v� W (E)1"HW _J_
<br /> O 1 it 1 'PO O RE:PO I I TO BELOW -, 1 11 1 r - MOUNTED ❑ 1 3 C I E BOOSTER PUMP
<br /> Z_ _ J
<br /> CD
<br /> RE:P0.1 L_ _J L _J I (E)1 1/4"NG 5 COORDINATE LOCATION OF VENTS THROUGH ROOF TO MAINTAIN 10'-0"
<br /> (E)2"V - _ I (E)2"V 13 I I 5 - I -(E)3/4"HWC— I DOWN THRU
<br /> 1 FROM BELOW 6 OR U 3 �-/ N O I I I ROOF 1 CLEARANCE FROM OUTSIDE AIR INTAKES. EACH VENT EXTENSION
<br /> RE.Po (E)RTU-2 (E)RTU-1 (E)WH-4 (E)RTU-2 THROUGH A ROOF SHALL BE AT LEAST 3" IN DIAMETER&TERMINATE
<br /> MOUNTED ❑ 1 O � 12 — — I— — (E)1 1/2"HW
<br /> I D� OOF— . ROOF (E)3 V (E)WH-5 I I ]ROOF L L NOT LESS THAN 12" ABOVE THE ROOF OR AS REQUIRED BY THE
<br /> OUNTED MOUNTED - FROM BELOW AMOUNTED
<br /> jj\/ \/ ��
<br /> RE:P0.1 O ADMINISTRATIVE AUTHORITY. ARCH.PROJECT NO.
<br /> RE:P I I (74 MBH) 1
<br /> 11 1 6 SITE UTILITIES: THE MECHANICAL DOCUMENTS INDICATE CONNECTON 2004
<br /> A —
<br /> - - - - - - - - - - - - - — — — T — — — — — — — — — — — — — — — — — — — — — — — — — — — — — T A A - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - A &LOCATION OFVARIOUS BUILDING SERVICES. COORDINATE WORK
<br /> (E)RTU-1 (E)WH-4 DRAWN
<br /> 4 - 2 ROOF 5 (E)WH-5 WITH THE SITE UTILITIES CONTRACTOR TO ENSURE PROPER INVERT
<br /> 6.2 6.4 7 7.3 8 9 10 6.2 6.4 7
<br /> C7.)3 8 9 MOUN' 11 10 ELEVATION, PIPE SLOPE, GRADIENT, PIPE SIZE AND SEPARATION JMC
<br /> (115 MBH) WITHIN TRENCH WORK. NOTIFY ARCHITECT/ENGINEER OF ANY CHECKED
<br /> DISCREPANCY BETWEEN DRAWINGS AND FIELD CONDITIONS. RWD
<br /> 7 CONTRACTORS SHALL IDENTIFY ALL SERVICEABLE ITEMS, (CLEANOUT SUBMITTAL DATES
<br /> COILS, ETC.) SO THAT THE CEILING SUBCONTRACTOR MAY KNOW
<br /> WHERE TO INSTALL ACCESS-TYPE PANELS SHOULD A LIFT-UP TYPE 06/11/20
<br /> CEILING NOT BE INSTALLED. THIS CONTRACTOR SHALL PROVIDE
<br /> ACCESS PANELS FOR HIS WORK UNLESS SPECIFICALLY NOTED ON THE
<br /> PLUMBING WASTE AND VENT DEMOLITION PLAN - MEZZANINE NORTH DOMESTIC WATER AND GAS DEMOLITION PLAN - MEZZANINE NORTH 8 ATT,PENEDRAWINGTRATIONS MADE THROUGH RATED ASSEMBLIES TO S. OTB DATE
<br /> 3/32" - F-0" 3/32" - F-0" ACCOMODATE WORK OF THIS SECTION, MUST BE SEALED TO MAINTAIN
<br /> THE RATING OF SUCH ASSEMBLY BY A U.L. RECOGNIZED SEALING
<br /> METHOD.
<br /> 9 SLOPE ALL SEWERS BELOW GRADE AS SHOWN ON THIS SET OF PLANS. x
<br /> ALL OTHER PIPING INSIDE BUILDING OR ABOVE GRADE SHALL BE ° o
<br /> SLOPED PER THE REQUIREMENTS OF THE PLUMBING CODE AND a z
<br /> AMENDMENTS ADOPTED BY THE LOCAL AHJ. COORDINATE PIPING °o H °o
<br /> Fx zx
<br /> 7 7 RTU-8 E 1 1/2"CW 3/4"RO �'° a �° CL
<br /> 3/4"NG (D 18 BELOW GRADE OUTSIDE BUILDING WITH SITE DRAWINGS. ti a ti y W
<br /> O O (E)1"HW 8 1 10 FLOOR SINKS BELOW REFRIGERATED CASE TO BE HALF-EXPOSED. o a a
<br /> RTU-8 11 RTU-7 11 O ROOF O E 3/4"MPG RTU-7 E 1"HW (E)3/4"MPG 3/4"RO a H o M _ 8
<br /> RE:P2 MOUNTED ( ) 8 1 ( ) 1 E 3/4 NG COORDINATE LOCATION WITH REFRIGERATION CONTRACTOR RE: R1. W _o
<br /> ROOF ES ROOF PS (E)1 1/4"CD (E)3/4"CD RE:P2 ROOF O ORE:p2 O1/2"RO P2 RTU-6 °x a � 6 o o " W � = a
<br /> 1 MOUNTED MOUNTED 4 RE:P1 RE:P1 (70 MBH) (E)3/4"NG = MOUNTED RE.P2 ROOF 8 11 INDIVIDUAL VERTICAL VENT SIZES ARE NOT SHOWN ON PLAN FOR °a A z I Z o
<br /> O
<br /> E 2 VTR O 1 1 70 MBH O O FIX SPECIFIED SCHEDULE. REFER TO PLUMBING FIX a a Q° - = d
<br /> ( ) O _ w ( ) MOUNTED TURES S C IN SC ULE UMB G TURF �'> o ¢ z o 3 co
<br /> E 3/4" A Z ) 3
<br /> —
<br /> - - — — - - - - - - - - - - — - - - - - - - - - -- — - - - - - - - - - - - - /�\\ - - - - - - - - - - - - - -( > — - - - - - - - - - - - - - - - - - - - - - - — (70 MBH) SCHEDULE FOR SIZES. z QaQox I y
<br /> 12 ALL INDIRECT WASTE PIPING FROM ALL DEPARTNT SINKS SHALL BE o Q H H v L
<br /> „ Q/ "' w 3 I 7 I (TYP.) —_ (E)3/4" w — x I SCHEDULE 40 PVC. w w o a o
<br /> O 1
<br /> (c
<br /> 41
<br /> B� (E)1 CD (E)1 C �- � Ol 13 PLUMBING CONTRACTOR SHALL HIRE A SURVEYOR TO PLOT POINTS A w z a
<br /> 171 RTU-6 11 -- !17
<br /> QA (E)ROOF MOUNTED I ROOF P5 3/4"NG j (E)RO SYSTEM WITH I1U 1 �� 1 (E)3/4"N (E)1 1/4" w �
<br /> (E)2"VTR I ❑ w w CD PIPING(TYP.) T BELOW rri A (E)3 SS I MOUNTED 1 1 (E)BOOSTER PUMP ACCURATELY LOCATE DRAINS AND SINKS AND TO CONFIRM FINISH
<br /> .� -� 1 vi w (E)3"VTR TO BELOW (E)1"HW RTU-3 9
<br /> O o RE:P1 ROOF 3/4"N (E)1 1/4"NG HEIGHTS OF THE TOP OF ALL SURFACES, RE: Al.1-6.
<br /> 1 RE:P1 I I TO BELOW i - 1 3 ��� 1
<br /> 1 L J O
<br /> — 7 RE:P2 3/4"NG L J M L MOUNTED DOWN THRU
<br /> (E)2"V _ I (E)2 V I 1 I 14 SEAL BETWEEN WALLS &PLUMBING FIXTURES PER REQUIREMENTS OF �
<br /> (70 MBH) 1 ROOF
<br /> TU-3 11 WH 8 E] I -(E)3/4°Hwc— O THE HEALTH DISTRICT AND PLUMBING CODE. M O
<br /> 1 FROM BELOW ( = NG W O
<br /> RE.Pl O oUNTED . RTU-1 1 1 5 I 1 RTU-2 e I 15 REFER TO THE PLUMBING FIXTURE SCHEDULE FOR CW&HW SIZES TO o
<br /> D RTU-2 11 OOF (E)3 V 0 17 I I 0 ROOF _ V C� 16 ' — — I— — (E)1 1/2"HW INDIVIDUAL FIXTURES. Q u7
<br /> ROOF PS MOUNTED - FROM BELOW 'MOUNTED' 2 RE:p2
<br /> ❑ MOUNTED FROM
<br /> M ° 19 I 1 (70 MBH) �� I O 16 PROVIDE FLEXIBLE CONNECTIONS AT ALL GAS FIRED APPLIANCES.
<br /> CO
<br /> 17 ROUTE PIPING OVER MAIN SALES AND OTHER AREAS WITHIN TRUSS O w
<br /> (� C°
<br /> A - - -� - - - - - - -� - - -� - - - - - - — — — — — — — — — — — — — — — �- - — — — — — — — — - - - r A A - - — — — — — —
<br /> - - - - - - - - - - - - - _ - - - - - - - - - RTU-1 8 wx wx EXPANSION A SPACE WHENEVER POSSIBLE. O 0 ❑ o
<br /> 4 19 17 4x 10 2 ROOF 5 4 TANK 18 CONTRACTOR SHALL BE RESPONSIBLE FOR SEISMIC RESTRAINT a m x o
<br /> 6.2 6.4 7 7.3 8 9 6.2 6.4 7 7.3 8 9 MOUNTED 10
<br /> (112 MBH) 14 8 ANCHORAGE AND BRACING REQUIREMENTS, RE: 53.4. H � Q
<br /> 19 RE: A1.4, A1.5, AND A1.7 FOR FLOOR SINK, FLOOR DRAIN AND TRENCH Vf w
<br /> DRAIN DIMENSIONS, RE: A1.1-6 FOR PLUMBING FIXTURE PREP SLAB. ' Z �
<br /> 20 COORDINATE PIPING WITH ALL TRADES PRIOR TO INSTALLATION TO W j
<br /> AVOID CONFLICTS. y �j
<br /> 21 THE POINT OF DISCONNECTION REMAINING IN A PIPING SYSTEM AFTER Z
<br /> PLUMBING ATEA D VENT PLA - MEZZANINE NORTH DOMESTIC WATER AND A PLA - MEZZANINE NORTH PIPING HAS BEEN REMOVED SHALL BE PERMANENTLY CAPPED AIR AND � �
<br /> U NG W S N N N W N G S NWATER TIGHT. Q W U) r
<br /> 3/32" = F-0" 3/32" = F-0" 22 CONTRACTOR SHALL RETAIN AND PROTECT ALL EXISTING FIXTURES, T M co
<br /> EQUIPMENT AND ALL ASSOCIATED PIPING NOT SPECIFICALLY SHOWN i
<br /> TO BE REMOVED OR RELOCATED ON THIS SET OF PLANS. JL
<br /> o
<br /> 23 SET ALL FLOOR DRAINS TO FLUSH WITH FLOOR FINISH AS FOLLOWS: N z
<br /> FINISH CONCRETE: TOP OF DRAIN=TOP OF FINISH CONCRETE O
<br /> RESINOUS FLOORING: Z
<br /> SET TOP OF DRAIN 1/4" ABOVE TOP OF CONCRETE AS SHOWN ON SHEET
<br /> Al. RE: SHEET A9 FOR FLOOR FINISH AND TRANSITION DETAIL.
<br /> 24 CONTRACTOR SHALL SAWCUT EXISTING CONCRETE SLAB FLOOR AS
<br /> GAS DOMESTIC WATER SEWER REQUIRED FOR INSTALLATION OF NEW WASTE AND VENT PIPING, RE: Q�pFESS
<br /> AO AND Al. �O��O H.
<br /> CALCULATIONS CALCULATIONS CALCULATIONS 25 REMOVE ALL EXPOSED UNUSED WASTE AND VENT PIPING.
<br /> � m
<br /> (2016 CPC) (2016 CPC) (2016 CPC) 26 CONTRACTOR TO FIELD VERIFY ALL FIXTURES ARE FULLY CONNECTED 5
<br /> TO EXISTING SANITARY SEWER AND EXISTING VENT THROUGH ROOF P: 12/31/21
<br /> DISTANCE TO MOST REMOTE OUTLET= 525 FT. FULL STORE SERVED BY ONE EXISTING WATER METER AND 2 1/2"DOMESTIC WATER MAIN REFERENCE FLOOR ELEV. 100'-0" AND INSTALLED ACCORDING TO LOCAL CODES AND PROJECT
<br /> SPECIFICATIONS. ���HAN��PQ�`P
<br /> EXISTING NATURAL GAS EQUIPMENT(PRIOR TO REMODEL) (FULL STORE WATER CALCUALTION F OF CA1
<br /> AS NOTED BELOW FOR INFORMATION ONLY) INVERT ELEVATION SEE PLANS KEYED NOTES
<br /> EQUIP. MBH 06/11/20
<br /> DOMESTC WATER BOOSTER PUMP INLET PRESSURE 38 PSI
<br /> (E)WH-1,WATER HEATER 199
<br /> TAL 1 RET PROTECT. SEE GENERAL NOTE 2 AND , THISSHEET.
<br /> (E)WH-2,WATER HEATER 199 DOMESTC WATER BOOSTER PUMP OUTLET PRESSURE 75 PSI EXISTING FIXTURES(PRIOR TO REMODEL) QUAN• DEVICE TF U. 2 RETAIN AND PROTECT ALL EXISTING FIXTURES, VALVES, TRAP
<br /> PRIMERS AND TRAP PRIMER ACCESS PANELS, REDUCED PRESSURE
<br /> (E)WH-3,WATER HEATER 199 $,1
<br /> STATIC PRESS.LOSS(ELEV) (16'-0"x.43) 7 PSI Floor Sinks 28 2.0 56 BACKFLOW PREVENTERS AND ALL ASSOCIATED DOMESTIC WATER
<br /> (E)WH-4,WATER HEATER 199 AFC-2 e AND GAS PIPING, THIS AREA, UNLESS OTHERWISE NOTED.
<br /> (E)WH-5,WATER HEATER 199 MIN.PRESS.LAST FIXTURE 30 PSI Floor Sinks(Combination Waste&Vent) 41 2.0 82 ROOF PS
<br /> Floor Drain 3 2.0 6 MOUNTED 3 RETAIN AND PROTECT EXISTING REVERSE OSMOSIS SYSTEM
<br /> (E)RTU-1,ROOF TOP UNIT 115 MAINTAINED BY PURE WATER TECHNOLOGIES. COORDINATE
<br /> (E)RTU-2,ROOF TOP UNIT 74 TOTAL PRESSURE AVAILABLE 38 PSI Trench Drain 3 5.0 15 AFC-1 3 I CONNECTIONS TO NEW FILTERED WATER DISPENSER AND COMBI OVEN 0
<br /> Mop Sink 3 3.0 9 ROOF PS I 11 WITH ROBERT ZITTING 801-509-8462 OR 800-361-7889.
<br /> (E)RTU-4,ROOF TOP UNIT 74 EXISTING DISTANCE TO LAST FIXTURE 550 FT
<br /> (E)RTU-5,ROOF TOP UNIT 74 Water Closet 8 4.0 32 MOUNTED I I I 4 RETAIN AND PROTECT ALL EXISTING FIXTURES, FLOOR DRAINS,
<br /> (E)RTU-6,ROOF TOP UNIT 74 EXISTING EQUIVALENT DISTANCE IN FEET 825 FT Urinal 2 2.0 4 1 I O
<br /> TRENCH DRAINS, FLOOR SINKS, CLEANOUTS, VENT THROUGH ROOFS
<br /> AND ALL ASSOCIATED WASTE AND VENT PIPING ABOVE AND BELOW
<br /> (E)RTU-7,ROOF TOP UNIT 74 Lavatory/Hand Sink 14 1.0 14
<br /> EXISTING GALLONS PER MINUTE 82 GPM I � GRADE, THIS AREA, UNLESS OTHERWISE NOTED. RE: GENERAL NOTE 6,
<br /> (E)RTU-8,ROOF TOP UNIT 74 Drinking Fountain 2 0.5 1 - - - - - - - - - THIS SHEET.
<br /> (E)RTU-9,ROOF TOP UNIT 500 ALLOW.PRESS.= 38.0 x 100' �•G�
<br /> 5 EXISTING MECHANICAL EQUIPMENT TO BE REPLACED, RE: MO AND M1.
<br /> 4.60 PSI TOTAL F.U.= 219 L
<br /> (E)RTU-10,ROOF TOP UNIT 500 LOSS/100FT 825 EQ.FT. CD�J CDS DISCONNECT FROM EXISTING NATURAL GAS PIPING AND CAP PIPING ON rT
<br /> (E)RTU-11,ROOF TOP UNIT 500 (THIS ABOVE LIST INCLUDES EXISTING FIXTURES FOR
<br /> ENTIRE STORE ROUTED TO SANITARY SEWER ROOF. RETAIN AND PROTECT EXISTING NATURAL GAS SHUT-OFF VALVE Iw
<br /> AND GAS PRESSURE REGULATOR FOR NEW ROOF TOP UNIT, 1
<br /> (E)RTU-12,ROOF TOP UNIT 40 EXISTING PLUMBING FIXTURES F.U. TOTAL F.U. TOTAL 20 20 RE: P3.
<br /> (E)UH-1,UNIT HEATER 175 QUA• FIXTURES REMOVED QUAN. 7 RE:P1 RE:P1 8 6 EXISTING MECHANICAL EQUIPMENT TO BE REPLACED, RE; MO AND M1.
<br /> (FULL STORE CALCULATION) DEVICE F.U. DEVICE F.U.
<br /> (R)UH-2,UNIT HEATER 100 CAP EXISTING CD PIPING ABOVE ROOF AND REMOVE EXISTING CD Q
<br /> (E)UH-3,UNIT HEATER
<br /> Lavatories 5 1.0 5 Floor Sinks 9 2.0 18
<br /> 200 Hand sinks 10 2.0 20 Floor Sinks(Combination Waste&Vent) 36 2.0 72 PIPING TO UNIT. RETAIN AND PROTECT EXISTING CD PIPE ON ROOF FOR
<br /> RECONNECTION TO NEW ROOF TOP UNIT, RE: P3. O
<br /> (E)UH-4,UNIT HEATER 30
<br /> (E)PAN WASHER (BAKERY) 48 Mop Sinks 4 3.0 12 TOTAL F.U.- 90 7 CONNECT FULL SIZE CD FROM NEW ROOFTOP UNIT TO EXISTING CD Q 0
<br /> (E)RACK OVEN(BAKERY) 290 1-Comp.Sinks 4 4.0 16 (CALCULATION INCLUDES ONLY FIXTURES REVISED BY REMODEL) PLUMBING WASTE AND VENT PLAN PIPING MOUNTED ON ROOF. MOUNT NEW CD PIPING ON ROOF. SLOPE
<br /> (E)EMERGENCY GENERATOR 1710 3-Comp.Sinks 6 6.0 36 F.U. TOTAL NORTH MIN 1/8"/FT. DOWNWARD AND INDIRECT TO EXISTING ROOF DRAIN. Q
<br /> FIXTURES ADDED QUA PARTIAL ROOF 8 CONNECT TO EQUIPMENT WITH NEW GAS SHUT-OFF VALVE UNION&
<br /> TOTAL CONNECTED LOAD 5,647 MBH Hose Bibbs 1 2.5 2.5 DEVICE F.U. Q
<br /> Hose Bibbs(Additional) 10 1.0 10 Floor Sinks 5 2.0 10 3/32" = F-0" DIRT LEG. NG SIZE AS NOTED, RE: P5-15 AND P5-17. 0
<br /> EXISTING MPG MAIN SIZE 2" 9 RECONNECT EXISTING NATURAL GAS (7" W.C.) TO EQUIPMENT WITH O
<br /> Water Closets 8 5.0 40 Floor Sinks(Combination Waste&Vent) 59 2.0 118 EXISTING GAS SHUT-OFF VALVE AT REGULATOR AND EXISTING GAS
<br /> Urinals 2 4.0 8 PRESSURE REGULATOR. INSTALL NEW GAS SHUT-OFF VALVE, UNION&
<br /> NATURAL GAS SUPPLY PRESSURE=5 PSI Drinking Fountains 2 0.5 1 TOTAL F.U.= 128 DIRT LEG AT UNIT. NG PIPE SIZE AS NOTED, RE: P5-15.
<br /> NATURAL GAS EQUIPMENT(AFTER TO REMODEL) (CALCULATION INCLUDES ONLY FIXTURES REVISED BY REMODEL)
<br /> 10 EXISTING MECHANICAL EQUIPMENT TO BE REPLACED, RE: M0,
<br /> EQUIP. MBH TOTAL EXISTING PLUMBING FIXTURE F.U.= 150.5 NET CHANGE TOTAL F.U.-+38 M1 AND P3.
<br /> TOTAL EXISTING PLUMBING FIXTURE REQUIRED GPM 82 GPM 11 REMOVE EXISTING WATER HEATERS AND EXPANSION TANK AND
<br /> RETAIN AND PROTECT ALL EXISTING VALVES AND CW, HW AND HWC
<br /> WH-1,WATER HEATER 199 NOTE: NO PLUMBING FIXTURES WILL BE ADDED OR REPLACED PIPING FOR RECONNECTION TO NEW WATER HEATERS. RETAIN AND
<br /> WH-2,WATER HEATER 199 DURING CONSTRUCTION OF THIS PROJECT. 8.1 PROTECT EXISTING DUCTWORK, FLUES AND FLUE THROUGH ROOF FOR
<br /> WH-3,WATER HEATER 199
<br /> AFC-2 3 RECONNECTION TO NEW WATER HEATERS.
<br /> WH-4,WATER HEATER 199 NEW REFRIGERATION EQUIPMENT(ADDED) QUAN. GPM TOTAL GREASE WASTE ROOF PS
<br /> GPM MOUNTED 12 REMOVE EXISTING HOT WATER RECIRCULATION PUMP AND RETAIN
<br /> WH-5,WATER HEATER 199 AND PROTECT ALL ASSOCIATED PIPING FOR RECONNECTION TO NEW
<br /> RTU-1,ROOF TOP UNIT 112 FLUID COOLER 2 14.7 29.4 CALCULATIONS AFC-I 3 I RECIRCULATION PUMP.
<br /> ROOF 5
<br /> RTU-2,ROOF TOP UNIT 70 (2016 CPC)
<br /> MOUNTED 1 I I I 13 REMOVE EXISTING INDIRECT WASTE PIPING FROM (E)WH-4 AND
<br /> TOTAL WINCO STORE REQUIRED GPM �y I I I (E)WH-5 TO EXISTING FLOOR SINK.
<br /> RTU-3,ROOF TOP UNIT 70 111.4 GPM F.U. TOTAL 1 I I I 14 INSTALL NEW WATER HEATER AND RECONNECT TO EXISTING CW, HW
<br /> RTU-4,ROOF TOP UNIT 70 (COMPLETED REMODEL)
<br /> EXISTING FIXTURES (PRIOR TO REMODEL) QUAN.
<br /> DEVICE F.U. I AND HWC PIPING. INSTALL WITH 32" DIA. x 2" DEEP , 24 GAUGE
<br /> RTU-5,ROOF TOP UNIT 70 I I 1 GALVANIZED DRAIN PAN AND NPS - 1" DRAIN OUTLET. 1" AIR GAP
<br /> Floor Sinks 1 2.0 2 - - -' _ - _ - - - - - - M ) REQUIRED FROM DRAIN OUTLET TO TOP LIP OF DRAIN PAN. IF OUTLET
<br /> RTU-6,ROOF TOP UNIT 70 �-/ � - Q
<br /> RTU-7,ROOF TOP UNIT 7o Floor Drain 10 2.0 20 — IS LESS THAN 1", ADD 2" THICK CONCRETE PAD UNDER WATER HEATER
<br /> Trench Drain 6 5.0 30 L TO MEET MIN. 1"AIR GAP.
<br /> RTU-8,ROOF TOP UNIT 70 20 20 15 PROVIDE AND INSTALL NEW AMTROL ST-25V EXPANSION TANK AND ,
<br /> RTU-9,ROOF TOP UNIT 400 Hand Sink 1 2.0 2 21
<br /> RECONNECT TO EXISTING PIPING.
<br /> RTU-10,ROOF TOP UNIT 400 1-Comp.Sinks 3 4.0 12 16 INSTALL NEW RECIRCULATION PUMP AND CONNECT TO EXISTING HWC
<br /> RTU-11,ROOF TOP UNIT 400 3-Comp.Sinks 7 4.0 28 7 8 PIPING
<br /> RTU-12,ROOF TOP UNIT 70 Mop Sink 1 3.0 3 17 ROUTE FULL SIZE COPPER DRAIN PAN DRAIN LINE AND T&P RELIEF
<br /> (E)UH-1,UNIT HEATER 175 Hub Drain 1 2.0 2 LINE SEPARATELY BEHIND WATER HEATER TO EXISTING FLOOR SINK
<br /> (R)UH-2,UNIT HEATER 100 AND INDIRECT WITH AIR GAP.
<br /> (E)UH-3,UNIT HEATER 200 TOTAL F.U.- 99
<br /> - 18 TWO SEPARATE 3/4" RO AT TRUSS SPACE. ROUTE ONE TO FILTERED
<br /> (E)UH-4,UNIT HEATER 30 THE PLUMBING CONTRACTOR SHALL (THIS ABOVE LIST INCLUDES EXISTING FIXTURES FOR ENTIRE STORE DOMESTIC WATER AND GAS PLAN WATER DISPENSER AND ONE TO COMBI OVEN. FINAL CONNECTION TO
<br /> (E)PAN WASHER (BAKERY) 48
<br /> ROUTED TO EXISTING GREASE INTERCEPTOR NORTH RO SYSTEM TO BE MADE BY PURE WATER TECH. SEE KEYED NOTE 3,
<br /> (E)RACK OVEN(BAKERY) 290 PROVIDE ALL NECESSARY PARTIAL ROOF THIS SHEET.
<br /> (E)EMERGENCY GENERATOR 1710 FIXTURES REMOVED-NONE 3/32" = 1'-0" 19 CONNEWATERT 8" DIA. FULLY HEATER CONNECTTO EXISTING FLUE THROUGH ROOFSULATED TYPE'B'EXHAUST FLUE .
<br /> EACH
<br /> CONDENSATE PIPING FOR ALL CASES F.U. TOTALSHEET TITLE
<br /> TOTAL CONNECTED LOAD 5,420 MBH FIXTURES ADDED QUAN• DEVICE F.U. 20 PIPING UP THROUGH ROOF. COORDINATE EXACT LOCATION WITH
<br /> TEMPORARILY RELOCATED AND USED REFR.IGERATIONAND MECHANICAL CONTRACTOR, RE: A7.1-4.
<br /> NATURAL GAS SUPPLY PRESSURE=5 PSI Floor Sinks 1 2.0 4 21 CONNECT 1 1/2" BPSCW TO MAKE-UP WATER CONNECTION FOR FLUID MECHANICAL
<br /> DURING TIME OF CONSTRUCTION. Floor Drain 2 5.0 10 COOLER PER MANUFACTERER'S REQUIREMENTS. PLATFORM
<br /> NET CHANGE -227 MBH
<br /> TOTAL F.U.= 14 PIPING PLAN
<br /> NET CHANGE TOTAL F.U.=+14 AND CAL,C S
<br /> aTOTAL F.U.AFTER REMODEL 113
<br /> 00
<br /> 0 NOTES: SHEET
<br /> ch 1. STORE SERVED BY ONE EXISTING 2,000 GALLON GREASE INTERCEPTOR
<br /> EXISTING GREASE INTERCEPTOR SHALL BE RETAINED AND PROTECED.
<br /> P3N
<br /> O
<br /> N
<br /> O�
<br />
|