Laserfiche WebLink
REVISIONS <br /> NO. DESCRIPTION DATE <br /> PLUMBING LEGEND <br /> WATER HEATER SCHEDULE PLUMBING FIXTURE SCHEDULE ABBREV. DESCRIPTION ABBREV. DESCRIPTION <br /> BALANCING VALVE <br /> SHIPPING CW HW FIRST HOUR FIXTURE PIPING CONNECTIONS POINT OF NEW CONNECTION <br /> MODEL NOTES MANUFACTURER OWNER CONT. OWNER CONT. HOSE BIBB <br /> EQUIPMENT TYPE CAP. HEIGHT DIA. WEIGHT INLET OUTLET MBH RATING S'Z ELEC. MANUFACTURER NO. DESCRIPTION SIZE NOTES NO. (GAL) (IN) (IN) (INPUT) SIZE &CAT.NO. TRAP WASTE VENT CW HW ��' ��• INSTALL INSTALL IN-LINE pip EXISTING FLOOR CLEANOUT <br /> (LBS) NPTM NPTF (100°TEMP.RISE) <br /> REDUCED PRESSURE PIPE BREAK --/b �-- EXISTING WALL CLEANOUT <br /> WH-1 ATMOSPHERIC 100 75 28 603 1 1/2" 1 1/2" 199 193 (1)6" 120/ 1 A.O. SMITH BTR-197 BFP-3 BACKFLOW PREVENTER WATTS LF009-QT 3/4" - IN - �/4" - -- X -- X O <br /> 1 DIRECT � OVERFLOW DRAIN NEW FLOOR CLEANOUT <br /> REDUCED PRESSURE UNITED BACKFLOW IN- COMPOSITE PLASTIC REDUCED PRESSURE BACKFLOW PREVENTER C- - - -- -- NEW WALL CLEANOUT <br /> WH-2 ATMOSPHERIC 100 75 28 603 1 1/2" 1 1/2" 199 193 (1)6" 120/ 1 A.O.SMITH BTR-197 1 BFP-4 3/4" �/4" X X ROOF DRAIN <br /> BACKFLOW PREVENTER SOLUTIONS RP-501 DIRECT WITH COMPOSITE SHUT-OFF VALVES FOR REVERSE OSMOSIS SYSTEM <br /> BFP-5 REDUCED PRESSURE WATTS LF009-QT 2" - IN- _ 2.. _ __ X __ X O DP DIFFERENTIAL PRESSURE <br /> ���— GAS COCK <br /> WH-3 ATMOSPHERIC 100 75 28 603 1 1/2" 1 1/2" 199 193 (1)6" 120/ 1 A.O.SMITH BTR-197 1 BACKFLOW PREVENTER DIRECT SWITCH THERMOMETER <br /> REDUCED PRESSURE PRESSURE REDUCING VALVE <br /> BFP-6 BACKFLOW PREVENTER WATTS LF009-QT 2" - IN- - 2" - -- X -- X Ol ���— BUTTERFLY VALVE <br /> WH-4 ATMOSPHERIC 100 75 28 603 1 1/2" 1 1/2" 199 193 (1)6" 120/1 A.O.SMITH BTR-197 1 DIRECT <br /> TD-1 TRENCH DRAIN J.R.SMITH _ P 3„ 2„ _ _ __ X __ X O O GAS PRESSURE REGULATOR OS&Y VALVE <br /> WH-5 ATMOSPHERIC 100 75 28 603 1 1/2" 1 1/2" 199 193 (1)6" 120/1 A.O.SMITH BTR-197 1 SERIES 9895 PRESSURE GAUGE n> VERTICAL VALVE <br /> FS-1 FLOOR SINK SIOUX CHIEF NO P 2„ SEE - _ __ X __ X (D@ <br /> (REFRIGERATED CASES) MODEL 860-2PT26 EXCEPTIONS PLANS ��PS-8 AND PS-19 ���— BALL VALVE STRAINER ARCH.PROJECT NO. <br /> NOTES 1. PROVIDE COMPLETE WATER HEATER FOR ATMOSPHERIC OPERATION INCLUDING FACTORY INSTALLED DRAFT DIVERTER AND AUTOMATIC FLUE DAMPER,FACTORY INSTALLED ASME AND CSA CERTIFIED T&P RELIEF <br /> VALVE AND INTERMITTENT PILOT IGNITION. FS-3 FLOOR SINK SIOUX CHIEF NO p 3„ 2" - - -- X -- X 4O O RE:P5-19 REDUCER ,1\\ 2004 <br /> MODEL 860-3PT26 EXCEPTIONS <br /> BI-METAL DIAL THERMOMETER <br /> GATE VALVE DRAWN <br /> FS-4 FLOOR SINK COMMERCIAL 12"x12"x10" P 3„ 2„ - _ __ X -- X5 A RE:P5-19 JMC <br /> (ACID RESISTANT CAST IRON) ENAMELING 910-3 DEEP v GLOBE VALVE FS FLOW SWITCH <br /> FS-5 FLOOR SINK SIOUX CHIEF NO p 2" 2" - _ __ X __ X M <br /> MODEL 860-2PT26 EXCEPTIONS 7O OA RE:PS-19 2 WAY MOTORIZED VALVE ��� FLOW METER CHECKED <br /> GAS REGULATOR SCHEDULE - RwD <br /> -7 HOSE BIB SMITH-COOPER _ - - 3/4" - -- X -- X CALIFORNIA LEAD-FREE AB 1953 APPROVED 2 WAY CONTROL VALVE SAFETY RELIEF VALVE <br /> (WATER SOFTENER) 0190168E SUBMITTAL DATES <br /> s 2 WAY SOLENOID VALVE .. VALVE IN VERTICAL <br /> LINE SIZE <br /> 06/11/20 <br /> zap CHECK VALVE <br /> WS-1 WATER SOFTENER -- - DIRECT 2 -- X -- X 6 `� i <br /> _ - _ �� _ FLOOR SINK <br /> REGULATOR TOTAL (MAIN TO CONNECTED EQUIPMENT LINE SIZE TO <br /> LOAD REGULATOR) EQUIPMENT LOAD EQUPIMENT NOTES <br /> ,�[ 1� FLOOR DRAIN <br /> (MBH) (5 PSI MPG) (MBH) (7"W C) GENERAL NOTES <br /> SOLENOID VALVE <br /> j — <br /> A. ALL PLUMBING FIXTURES OR EQUIPMENT UTILIZING AN INDIRECT WASTE CONNECTION TO DRAIN INTO SANITARY SEWER SYSTEM SHALL HAVE AN AIR GAP AS REQUIRED BY THE PLUMBING CODE. ��� BALANCE VALVE WALL CLEANOUT OTB DATE <br /> B. LENGTHS SHOWN ON PLANS DO NOT RELEASE THE PLUMBER FROM THE RESPONSIBILITY OF COORDINATING THE TRENCH DRAIN LENGTHS WITH THE GENERAL CONTRACTOR. IF ANOTHER MANUFACTURER'S PLUG VALVE EXISTING VTR <br /> GR-1 400 3/4" RTU-9 400 1 1/4" A,B PRODUCT IS USED WITH DIFFERENT SECTION SIZES, THE LENGTHS SHOWN WILL NOT BE APPLICABLE. THE PLUMBER WILL NEED TO FIELD COORDINATE THE NUMBER OF SECTIONS AND THE TOTAL LENGTH <br /> REQUIRED FOR EACH DRAIN. TEMP/PRESS TEST PORT VALVE NEW VENT THROUGH ROOF <br /> C. PLUMBER TO PROVIDE AND INSTALL WATTS LF7R DUAL CHECK VALVES IN HOT AND COLD WATER SUPPLY LINES TO SINKS. INSTALL VALVES IN AN ACCESSIBLE LOCATION. PROVIDE ACCESS PANEL PIPE DOWN <br /> GR-2 400 3/4" RTU-10 400 1 1/4" A,B IF INSTALLED IN WALL OR ABOVE HARD CEILINGS. rl' GW GAUGE WELL x w <br /> ^ PIPE UP o z o <br /> GR-3 3/4" RTU-11 1 1/4" A g PLUMBING FIXTURE NOTES i--� DIRECTION OF FLOW 3 a o z H <br /> 400 400 <br /> UNION °oH�0oa <br /> PIPING SLOPE ARROW W v a W N - a o <br /> lO LEAD FREE,CAST COPPER SILICONE ALLOY BODY,QUARTER TURN,FULL PORT,RESILIENT SEATED LEAD FREE ALLOY BODY BALL VALVE SHUT-OFFS AND STRAINER. Vr TEMPERATURE SENSOR ti o u>'cn C7 W <br /> GENERAL NOTES O KEYNOTE CALLOUT CAP �° 4 a Q o o <br /> O PRECAST POLYESTER CONCRETE TRENCH DRAIN WITH INTEGRAL STAINLESS STEEL RAIL&9870-465-SSP SSHD HEAVY DUTY STAINLESS STEEL GRATE ASSEMBLY AND DOME STRAINER. " - <br /> A.VENT GAS REGULATOR TO ATMOSPHERE. w x z W .E a <br /> DRAIN SECTIONS COME IN 39.2 AND 19.6 LENGTHS. COORDINATE AND VERIFY NUMBER OF SECTIONS REQUIRED TO PROVIDE TRENCH DRAINS AS SHOWN ON ARCHITECTURAL SLAB PLAN. O RELIEF VALVE a A z I Zw ca <br /> o <br /> B.INSTALL GAS REGULATOR A MINIMUM 7-0 FROM EQUIPMENT CONNECTION. E� <br /> O SCHEDULE 40 GREY PVC FLOOR DRAIN WITH 9"ROUND TOP,SCHEDULE 40 GREY PVC HALF GRATE,WHITE PVC FLAT SECONDARY STRAINER AND 3"TRAP. DETAIL CALLOUT a w a a A o o - t N <br /> FLOOR SINK TO BE INSTALLED FLUSH WITH FINISHED SURFACE.CONTRACTOR TO CUT GRATE PER DETAIL P5-21 AND REINSTALL BOTH ARC AND GRATE IN FLOOR SINK. CONNECT WASTE PER DETAIL P5-8. �'> 5 a A ¢z o Z .Y 3 co <br /> X UNIT NAME TEMP/PRESS RELIEF VALVE z Q W Q o a y 3 0 <br /> 4O SCHEDULE 40 GREY PVC FLOOR DRAIN WITH 9"ROUND TOP,SCHEDULE 40 GREY PVC HALF GRATE,WHITE PVC FLAT SECONDARY STRAINER AND 3"TRAP. w z x° W _ ) <br /> FLOOR SINK TO BE INSTALLED FLUSH WITH FINISHED SURFACE.CONTRACTOR TO CUT GRATE PER DETAIL P5-21 AND REINSTALL BOTH ARC AND GRATE IN FLOOR SINK. UNIT NUMBER °Q v v O d a <br /> SO 10"DEEP,ENAMELED C.I.BODY WITH 912 HALF GRATE,DOME STRAINER AND 3"C.I.TRAP.FLOOR SINK TO BE INSTALLED FLUSH WITH FINISHED SURFACE. TS TEMPERATURE SENSOR w w o <br /> (VB) VACUUM BREAKER A �¢ 04 <br /> O SYSTEM SHALL PROVIDE AND MAINTAIN 4,400 GALLONS PER DAY HOT WATER AT 5 GRAINS PER GALLON OR LESS WATER HARDNESS. OM GAS METER PROVIDED BY BMS cn <br /> U o <br /> PUMP SCHEDULE 7O SCHEDULE 40 GREY PVC FLOOR DRAIN WITH 9"ROUND TOP,SCHEDULE 40 GREY PVC HALF GRATE,WHITE PVC FLAT SECONDARY STRAINER AND 2"TRAP. 1- - -1 NEW COLD WATER <br /> FLOOR SINK TO BE INSTALLED FLUSH WITH FINISHED SURFACE.CONTRACTOR TO CUT GRATE PER DETAIL P5-21 AND REINSTALL BOTH ARC AND GRATE IN FLOOR SINK. - EXISTING COLD WATER 14X SECTION REFERENCE NUMBER ♦/� N <br /> XX SECTION REFERENCE SHEET <br /> NEW VENT ABOVE GRADEIn <br /> MOTOR O <br /> EQUIPMENTHEAD IMPELLER EXISTING VENT ABOVE GRADE - - NEW HOT WATER E <br /> NO. GPM (FT.H2O) (INCHES) SIZE MANUFACTURER MODEL NOTES 2 C-) � <br /> (H p) RPM ELECTRIC l------- NEW WASTE BELOW GRADE EXISTING HOT WATER — r_� <br /> o w <br /> (� CO <br /> 3600 4700-VMS-32.01 ----- NEW CIRCULATING------ EXISTING WASTE BELOW GRADE HOT WATER —0 O <br /> DBP-1 111.4(EACH) 86(EACH) 3(EACH) 5(EACH) (EACH) 460V/3 PH. ARMSTRONG (2 EACH) 1,DOMESTIC WATER BOOSTER PUMP O U (� N <br /> EXISTING CIRCULATING a m <br /> --- -- -- -1 PLUMBING DEMOLITION HOT WATER X O <br /> DHWP-1 5 11 -- 117 W 2940 120V/1 PH. ARMSTRONG ASTRO 250SS FLG 2,DOMESTIC HOT WATER RE-CIRCULATION _ _ _ _ _ _ NEW TRAP PRIMER PIPING y �_7 Q <br /> BELOW FLOOR(SHEET P2&P3) _ W <br /> • LLJU <br /> DHWP-2 3 3 -- 33 W 2940 120V/1 PH. ARMSTRONG ASTRO 220SSU 3,DOMESTIC HOT WATER RE-CIRCULATION ABBREV. DESCRIPTIONZ LL <br /> NOTES <br /> wW <br /> O <br /> AD ACCESS DOOR INV INVERT 1 <br /> 1.ARMSTRONG 680OG DESIGN ENVELOPE DUPLEX BOOSTER PUMP PACKAGE,MODEL N150102S-5 HP,SKID MOUNTED,WITH TWO VERTICAL SPLIT-COUPLED MULTISTAGE PUMPS,CAST IRON E COATED CASINGS,STAINLESS STEEL FITTED, AFF ABOVE FINISHED FLOOR MAX MAXIMUM Z <br /> 2 1/2"DIA.FLANGED CONNECTIONS,STAINLESS STEEL HEADERS AS RIGHT INTAKE-LEFT DISCHARGE,STAINLESS STEEL SHAFTS AND IMPELLERS,UL TYPE 12 ENCLOSURE,MODBUS RTU. FLOW RATE 111.4 GPM(PER EACH PUMP), W QQ <br /> SYSTEM 86 FT.HD(PER EACH PUMP),38 PSIG INLET PRESSURE,75 PSIG OUTLET PRESSURE REQUIRED. 460 V/3 PH./60 HZ. PUMPS SIZED FOR 100%REDUNDANCY. PROVIDE COMPLETE BOOSTER PUMP PACKAGE WITH CONTROL PANEL, App'D APPROVED MC MECHANICAL CONTRACTOR L U) <br /> CONTROLS,VFD'S,VALVES,PIPING,ETC.FOR A COMPLETE SYSTEM. PROVIDE ONE ARMSTRONG PRE-CHARGED 52 GALLON VOLUME,NON-ASME RATED FX-200 EXPANSION TANK TO SERVE BOTH BUMPS. ARCH ARCHITECTURAL OR ARCHITECT MFR MANUFACTURER W <br /> BFF BELOW FINISHED FLOOR MIN MINIMUM d CD <br /> a)PUMPS SHALL COMPLY WITH ASHRAE 90.1 AND NSF-372. BMS BUILDING MANAGEMENT SYSTEM MPG MEDIUM PRESSURE NATURAL GAS 0 <br /> b)PUMPS SHALL BE PROVIDED WITH VARIABLE FREQUENCY DRIVE MOUNTED AND WIRED AT THE FACTORY. CA COMPRESSED AIR (N) NEW El " O N <br /> c)PUMPS SHALL BE PROVIDED WITH PREMIUM EFFICIENT MOTOR SUITABLE FOR VFD USE. 0 W <br /> CD CONDENSATE DRAIN LINE NG LOW PRESSURE NATURAL GAS N <br /> d)INTEGRATED CONTROLLER SHALL DISPLAY PUMP FLOWRATES AND HEAD AT CONTROL PANEL DISPLAY. CHWS CHILLED WATER SUPPLY LINE L <br /> e)COMMISSIONING AND BALANCING OF PUMPS SHALL BE ACCOMPLISHED WITH INTEGRATED CONTROL WITHOUT THROTTLING OF PUMPS. NIC NOT IN CONTRACT 0 <br /> fl THE CONTROL PANEL SHALL BE ABLE TO PROVIDE RUN STATUS AND ALARM/FAULT TO THE BMS. CHWR CHILLED WATER RETURN LINE OC ON CENTER _ <br /> CR CONDENSER WATER RETURN LINE OD OVERFLOW DRAIN LINE <br /> 2.CLOSED-COUPLED IN-LINE PUMP,VARIABLE 3 SPEED,REPLACEABLE CARTRIDGE WITH STAINLESS STEEL CASING,FLANGED CONNECTIONS,NON-METALLIC IMPELLER,CERAMIC SHAFT,SELF LUBRICATED,DIRECT DRIVE.CONTROL BY CS CONDENSER WATER SUPPLY LINE RD ROOF DRAIN LINE <br /> BMS SYSTEM.SET PUMP TO MIDDLE SPEED. <br /> CW DOMESTIC COLD WATER REQ'D REQUIRED <br /> 3.CLOSED-COUPLED IN-LINE PUMP,VARIABLE 3 SPEED,REPLACEABLE CARTRIDGE WITH STAINLESS STEEL CASING,UNION CONNECTIONS,NON-METALLIC IMPELLER,CERAMIC SHAFT,SELF LUBRICATED,DIRECT DRIVE.CONTROL BY CWV COMBINATION WASTE AND VENT RL REFRIGERANT LIQUID LINEDW DISPOSAL WASTE FESS <br /> RO REVERSE OSMOSIS WATER QR <br /> BMS SYSTEM.SET PUMP TO MIDDLE SPEED. (E) EXISTING H. <br /> M/ � <br /> RS REFRIGERANT SUCTION LINE Q�PQ.� <br /> NOTE: FLOW RATES INDICATED ON SCHEDULE ARE INDICATIVE ONLY OF PUMP CAPACITY. THEY DO NOT NECESSARILY INDICATE BALANCE FLOW RATES. SEE PLAN DETAILS FOR BALANCE FLOW RATES. ELEV ELEVATION SCW SOFT COLD WATER <br /> c� m <br /> EST ESTIMATED SM SHEET METAL 5 <br /> F FIRE SPRINKLER LINE SPEC SPECIFICATION OR SPECIFIED P: 12/31/21 <br /> FCO FLOOR CLEAN OUT SS SANITARY SEWER CHAPS' �Q <br /> FD FLOOR DRAIN THW TEMPERED HOT WATER O <br /> qTF OF N\\r- <br /> FS FLOOR SINK TYP TYPICAL <br /> GC GENERAL CONTRACTOR UNO UNLESS NOTED OTHERWISE 06/11/20 <br /> GW GREASE WASTE V VENT <br /> HD HUB DRAIN VB VACUUM BREAKER <br /> HW DOMESTIC HOT WATER VBF VENT BELOW FLOOR <br /> VTR VENT THROUGH ROOF <br /> HWC CIRCULATING HOT WATER WCO WALL CLEAN OUT <br /> O <br /> r I�11 <br /> r�ll <br /> O <br /> O <br /> O <br /> O <br /> O O <br /> SHEET TITLE <br /> PLUMBING <br /> SCHEDULES <br /> AND LEGEND <br /> a <br /> SHEET <br /> M <br /> P4 <br /> ri <br /> O <br /> N <br /> O <br /> N <br /> O� <br />