Laserfiche WebLink
REVISIONS <br /> 1 2 3 4 4.2 5 6 7 8 8.1 10 11 No. DESCRIPTION DATE <br /> GENERAL NOTES <br /> I I I I I I I I I I I <br /> 1. THE INTENTION OF THE CONTRACT DOCUMENTS IS TO INCLUDE ALL <br /> I I I I I I I I I I I <br /> LABOR AND MATERIALS, AND EQUIPMENT NECESSARY, OR <br /> REASONABLY INFERABLE AS BEING NECESSARY FOR FURNISHING, <br /> (E)EF-13O (E)MOTORIZEDO INSTALLATION AND TESTING, COMPLETE AND READY FOR SAFE <br /> DAMPER 0 0 OPERATION OF THE SYSTEMS DESCRIBED HEREIN. <br /> I I I I I I I I I I I <br /> ° <br /> ON ROOF) ° 2. ALL PENETRATIONS MADE THROUGH RATED ASSEMBLIES TO <br /> O DAMPERRIZED _\4' <br /> 2 E EF-13 O <br /> ACCOMMODATE WORK OF THIS SECTION MUST BE SEALED TO <br /> MAINTAIN THE RATING OF SUCH ASSEMBLY BY A U.L. RECOGNIZED <br /> _ 2 (E)EH� 2 SEALING METHOD. <br /> ° ❑ owe-ea-o <br /> 3. ALL DUCT DIMENSIONS SHOWN ON THE PLANS ARE NET FREE AREA. <br /> 0 0 <br /> T INCREASE DUCT SIZE WHEN DUCT LINER IS USED. <br /> N <br /> (��H-4 2 I I <br /> M.9 ) 4. ALL DUCTS SHALL BE SUPPORTED BY THE LATEST SMACNA AND <br /> ASCE RECOMMENDATIONS FOR SEISMIC SUPPORT. SUPPORTS SHALL <br /> O ° BE INSTALLED AT SEAMS OR AS CLOSE AS TO SEAMS AS POSSIBLE. <br /> (E)ROOF OP 5. THE BOTTOM HEIGHT OF ALL EXPOSED DUCTWORK AND RELATED ARCH.PROJECT NO. <br /> 0 0 0 CDCONDENSING—\ E)EH-1O DIFFUSERS SHALL BE DETERMINED BY EXISTING CONDITIONS AND 2004 <br /> ° II COORDINATED WITH ARCHITECT/OWNER. DRAWN <br /> (E)UH-3 O (E)UH- O — <br /> I ° I o I p I S� I 1 6. ALL EXPOSED DUCTWORK SHALL BE RIGID. (NO FLEX). SS <br /> ° (E)H �4 2 CHECKED <br /> TG (R)UH-1 12 I7. ALL EXISTING EQUIPMENT/DUCTWORK SHALL BE EXISTING TO RD <br /> (DE) <br /> 4O E EF 14 8 <br /> O REMAIN AND RETAINED AND PROTECTED UNLESS OTHERWISE <br /> (:D(E)UH-4_" <br /> 12 �R)UH-1 (ON R�OF) NOTED. CONTRACTOR TO REMOVE EQUIPMENT DUCTWORK AS SUBNIITTAI DATES <br /> INDICATED ON PLANS IN IT'S ENTIRETY. THIS WORK INCLUDES ALL <br /> ( U-12O <br /> 2 E M HANGERS AND HARDWARE. 06/11/20 <br /> ROOF)– – – – – – – – – 0 ° <br /> r <br /> ° <br /> L J 2 2 (E)EH-3 0 <br /> 2 <br /> KEYED NOTES OTB DATE <br /> 1. EXISTING MECHANICAL EQUIPMENT TO BE REMOVED AND REPLACED <br /> ° (E)EH-2 2 WITH NEW IN KIND. TAKE CARE IN REMOVING IN ORDER TO REUSE <br /> 2 2 ALL EXISTING DUCTWORK, PIPING, CONTROLS, AND CURB AS <br /> 5 (E)RTU-1 = G:)�E) <br /> TG -3 REQUIRED FOR NEW EQUIPMENT. COORDINATE WITH ALL TRADES o <br /> ° PRIOR TO AND DURING DEMOLITION PHASE AS REQUIRED. z° <br /> aC4 U U <br /> 2. EXISTING EQUIPMENT TO REMAIN. RETAIN AND PROTECT. v a w a z o <br /> wWw .. �, 0 <br /> m0 �wmyd C7 o a <br /> (E)RT _5 E3. EXISTING FIRE SUPRESSION SYSTEM TO BE DEMOLISHED AND a Q A o o .N <br /> _I ( N O F77 1 — — — — — — — — — — — — =_= PROPERLY DISPOSED. � � �z z W .E <br /> .g 'L <br /> — Uwa W� Ca zo Z O c m <br /> 1 ❑ O 4. DISCONNECT UNDERCASE PLENUM. TAKE CARE 1N REMOVING a A S N c� � 06 <br /> O — 2 (E)UH-2 C d z m a w <br /> 1 7 DUCTWORK TO RETAIN &PROTECT FOR FUTURE CONNECTION TO W z Q°o ° W " 3 N <br /> ��II — NEW CASES, RE: M1. �oW �a��c� v o <br /> = O L� a o ° 5 (E)RTU- ® — °I 7 _ Qvwv� Oc, <br /> o / E -2 2 _ 7 —— __ / � 5. CONTRACTOR TO KEEP EXISTING T-STAT IN SERVICE UNTIL BMS IS W o o <br /> 1 — \/ IlT ll[II IlAII1 i@IfT[AIII11f11 I I 1 FULLY IN SERVICE. THEN REMOVE AND REPLACE EXISTING T-STAT, w a x 8 o <br /> 1 1 )EF-10 Slmttllmtl I IL - - - L - - - - - L - - 1 - - - 1 - - - - - - - - RE: BMS1. 0 0 <br /> - -- _ - _ - _ --- - - - -_ - _ - - - - - _ _ - - - - - - - - _ - - _ - - - - - - - - - - - - � - -- - - - - - - - -1 - - � � - - � U �U <br /> - - - - - - <br /> °I� II ( NROOF 1 T - - - T - - I Iq — - - - - - - - T - - - <br /> 1 1 — — — — — — — — — — — — — J = 4 =� r� -� 4 — =rte \ 4 — =r����_ �II 6. EXISTING SMOKE DETECTOR(S) TO BE REMOVED AND REPLACED, RE: <br /> 1 <br /> (E)H-3 L 0 - <br /> 7. DUCTWORK AND DIFFUSER TO BE CAREFULLY REMOVED AND Q <br /> 1 II PROPERLY DISPOSED. PREPARE DUCTWORK FOR CONNECTION TO <br /> NEW DUCT, RE: M I. <br /> ° Do <br /> _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ — _ _ _ _ 8. EXISITING FAN TO BE RELOCATED AND EXSITING CURB TO BE c� o <br /> DEMOLISHED. CAREFULLY DISCONNECT EXISTING EXHAUST O N <br /> l < II 0 <br /> — — — — — — — — — — — — — DUCTWORK AND PREPARE FOR NEW CONNECTION, RE: M1. ♦ ♦ x o <br /> 9. EXISTING RTU AND ROOF CURB TO BE REMOVED AND REPLACED y w <br /> 4 < WITH NEW IN KIND. TAKE CARE IN REMOVING IN ORDER TO REUSE ul <br /> �_ II ALL EXISTING DUCTWORK, PIPING, AND CONTROLS AS REQUIRED FOR a w W <br /> IT, 1 (� NEW EQUIPMENT. COORDINATE WITH ALL TRADES PRIOR TO AND y <br /> / ` N _— — — -- — _ — =— - - - - DURING DEMOLITION PHASE. Q <br /> `' III 1= — — _ — _ — ---—_— —�_— <br />