Laserfiche WebLink
REVISIONS <br /> NO. DESCRIPTION DATE <br /> MECHANICAL PIPING LEGEND <br /> SD STORM DRAIN ADIABATIC FLUID COOLER SCHEDULE <br /> HS HEAT-PUMP WATER SUPPLY LINE �i� PRESSURE REDUCING VALVE <br /> HR HEAT-PUMP WATER RETURN LINE BALL VALVE <br /> CWS COOLING TOWER SUPPLY LINE REDUCER <br /> CWR COOLING TOWER RETURN LINE GATE VALVE FLOW CAPACITY ELECTRIC EWT/LWT AMBIENT EFFICIENCY <br /> cs CONDENSER WATER SUPPLY LINE , , UNIT GPM (MBH) FAN HP FAN CFM MCA/MOCP POWER FLUID F DESIGN WB F GPM/Hl' WEIGHT MANUFACTURER MODEL NOTES <br /> GLOBE VALVE (GPM) �l`''-'-'111 ( ) ( ) ( ) <br /> CR CONDENSER WATER RETURN LINE <br /> 2 WAY CONTROL VALVE <br /> CD CONDENSATE DRAIN LINE WATER/20% GFD 1 2 3 4 5 OWNER FURNISHED CONTRACTOR <br /> CC- <br /> -----GW— GREASE WASTE 3 WAY CONTROL VALVE AFC-I 305 1494 53.3 268,916 67.5/70.0 460/60/3 99.7/89.7 80.7 5.72 20,719 GUNTNER ' <br /> SS SANITARY SEWER <br /> COOLING CONTROL VALVE PROP. GLYCOL 090.1A2x9/6AE-E240L/02P.M INSTALLED <br /> — — —v— — — VENT ��� CHECK VALVE AFC-2 305 1494 53.3 268M6 67.5/70.0 460/60/3 WATER/20% 99.7/89.7 80.7 5.72 20,719 GUNTNER GFD 1, 2, 3, 4, 5 OWNER FURNISHED CONTRACTOR ARCH.PROJECT NO. <br /> RD ROOF DRAIN LINE SOLENOID VALVE PROP. GLYCOL 090.1A2x9/6AE-E240L/02P.M INSTALLED 2004 <br /> OD OVERFLOW DRAIN LINE �� MOTORIZED VALVE <br /> DRAWN <br /> CW DOMESTIC COLD WATER 0 BALANCE VALVE <br /> SS <br /> HW DOMESTIC HOT WATER NOTES: <br /> GAS COCK <br /> Hwc DOMESTIC HOT WATER RECIRc 1. PROVIDE UNIT WITH VFD CONTROLLED FAN AND CONTROL PANEL PER SPECIFICATIONS. CHECKED <br /> MEDIUM PRESSURE NATURAL GAS �� � BUTTERFLY VALVE RD <br /> OS&Y VALVE 2. FURNISH UNIT WITH GMM CONTROLLER, 4-20ma OUTPUT AND MODBUS COMPATIBILITY. <br /> NG LOW PRESSURE NATURE GAS 3. FURNISH UNIT WITH STRUCTURAL STEEL SUPPORT AND VIBRATION ISOLATION PER SPECIFICATIONS. SUBMITTAL DATES <br /> F FIRE SPRINKLER LINE STRAINER <br /> CA COMPRESSED AIR �� SAFETY RELIEF VALVE 4. PROVIDE WITH FACTORY INSTALLED DISCONNECT. 06/11/20 <br /> MA MEDICAL AIR VALVE IN VERTICAL 5. PROVIDE WITH FACTORY MESH AIR FILTERS. <br /> MV MEDICAL VACUUM <br /> � FLOOR SINK <br /> CIRCUIT SETTER <br /> FLOOR DRAIN TBD TE <br /> HOSE BIBB GRADE CLEANOUT <br /> IN-LINE PUMP <br /> FLOOR CLEANOUT <br /> PUMP WITH VFD /�D/10­1- WALL CLEANOUT <br /> VENT THROUGH ROOF PUMP SKID COMPONENTS (PS- 1 'x o <br /> z <br /> �j f <br /> PIPE BREAK PIPE DOWN o R,' ¢0 o z <br /> o OVERFLOW DRAIN PIPE UP p w o w o a <br /> VOLTS/PH MCA MOCP VOLTS/PH MCAP MOCP a z <br /> UNION zx � z Z .� <br /> o ROOF DRAINTOTAL ELECTRICAL LOAD N <br /> GAS PRESSURE REGULATOR <br /> I CAP 460/3/60 55 70 120/1/60 16 20 w z z w E <br /> XX-X FIXTURE CALLOUT BACKFLOW PREVENTOR `' A N C7 E a C6 <br /> DOUBLE CHECK v w a��7 ra z a Z_ o <br /> [� S� gP7i© I Z 0 3 N <br /> wAC��7] Q14 O8� 11l = 3 O <br /> w°W F�' a O Rei O N C <br /> X.X DETAIL CALLOUT REDUCED PRESSURE PUMP SCHEDULE Q 'n o D <br /> # �� BACKFLOW PREVENTOR <br /> EQUIPMENT CALLOUT <br /> # POINT OF CONNECTION w o <br /> QUICK DISCONNECT <br /> FM <br /> HIGH CAPACITY AIR VENT Q FLOW RATE INLET SIZE DISCH IMPELLER ° <br /> EQUIPMENT FLUID ELECTRICAL <br /> FLOW METERNO SERVICE STYLE/CONST TYPE No <br /> RPM (GPS HEAD (FT) (INCH) SIZE DIA(INCH) WEIGHT MANUFACTURER MODEL NOTES <br /> O <br /> WATER METER THERMAL WELL (INCH) HP VOLTS/PH N <br /> HYDRONIC BASE MOUNTED I 1 OWNER FURNISHED <br /> P-1 SYSTEM END SUCTION GLYCOL 3550 305 150 3 2.5 6.375 20 460/3/60 466 BELL AND GOSSETT E-1510 2.5AC CONTRACTOR INSTALLED O <br /> n PRESSURE SENSOR <br /> T PT PRESSURE TRANsnucERHYDRONIC BASE MOUNTED 1 OWNER FURNISHED Q n <br /> P <br /> PRESSURE GAGE P-2 SYSTEM END SUCTION GLYCOL 3550 305 150 3 2.5 6.375 20 460/3/60 466 BELL AND GOSSETT E-1510 2.5AC CONTRACTOR INSTALLED <br /> c* <br /> T P-3 HYDRONIC BASE MOUNTED GLYCOL 3550 305 150 3 2.5 6.375 20 460/3/60 466 BELL AND GOSSETT E-1510 2.SAC 1, OWNER FURNISHED O LL CC <br /> ❑ TEMPERATURE SENSOR SYSTEM END SUCTION CONTRACTOR INSTALLED0 (J� N <br /> NOTES: = a m <br /> x o <br /> 1. PROVDE WITH ISP4000 INTERGRATED PUMP CONTROLLER. V~] w Q <br /> ABBREVIATIONS & DESCRIPTIONS <br /> � � <br /> AB.C. ABOVE CEILING KES KITCHEN EQUIPMENT SUPPLIER � Z N <br /> AFF ABOVE FINISHED FLOOR LPG LIQUIFIED PETROLEUM GAS W cn <br /> AV ACID VENT LWCO LOW WATER CUTOFFAW ACID WASTE MAX. <br /> LLI <br /> BFF BELOW FINISHED FLOOR MIN. MINIM MAXIMUM � W Q � � <br /> BG BELOW GRADE NG NATURAL GAS DIRT & AIR SEPARATOR SCHEDULE - CL <br /> CA COMPRESSED AIR (N) NEW a W <br /> CD CONDENSATE DRAIN N.O. NORMALLY OPEN(VALVE) <br /> _ a <br /> 0 <br /> .LN.H. CAST IRON N Lc <br /> HUB N.C. NORMALLY CLOSED(VALVE) O <br /> co CLEANOUT OH OVERHEAD CONNECTIONS <br /> CFF CAP FOR FUTURE POC POINT OF CONNECTION EQUIPMENT MAX WORKING TEMP MAX WORKINGWET N <br /> CKV CHECKVALVE (R) PIPE RISE NO LOCATION FLUID GPM PRESSURE WEIGHT MANUFACTURER MODEL NOTES N w <br /> CW COLD WATER RIO ROUGH-IN ONLY IN OUT ( F) (PSIG) Q � <br /> O <br /> CX CONNECT TO EXISTING SHT. SHEET <br /> (D) PIPE DROP SCW SOFT COLD WATER 1 OWNER FURNISHED <br /> DN PIPE DROP TO NEXT LEVEL SOC SHUT OFF COCK(GAS) DAS-1 HYDRONIC SYSTEM GLYCOL 260 8" 8" 250 150 525 WESSELS WVA6-HV6 CONTRACTOR INSTALLED <br /> DTL. DETAIL sov SHUT OFF VALVE <br /> (E) EXISTING TPL TRAP PRIMER LINE NOTES: <br /> F FIRE SERVICE UG UNDERGROUND <br /> FCO FLOOR CLEANOUT UP PIPE RISE TO NEXT LEVEL 1, PROVIDE WITH SKIM VALVE, AUTOMATIC AIR VENT, AND BLOW DOWN VALVE. FE S1 <br /> FND FOUNDATION DRAIN us UNDER SLAB �4p H. MIz <br /> GCO GRADE CLEANOUT UTR UP THRU ROOF <br /> HR HYDRONIC RETURN V VENT <br /> HS HYDRONIC SUPPLY VA VALVE 5 <br /> HW HOT WATER VTR VENT THRU ROOF EXPAN S ION TANK SCHEDULE P: 12/31/21 <br /> HWC HOT WATER CIRCULATION W WASTE <br /> IDW INDIRECT WASTE WCO WALL CLEANOUT `r�q�F�HAN\pP���P <br /> I.E. INVERT ELEVATION F pF cA�\FO <br /> IRR IRRIGATION <br /> EQUIPMENT TANK VOL ACCEPT VOL CHARGE PRESSURE STATIC HEIGHT WEIGHT 06/11/20 <br /> NO. SERVICE FLUID MANUFACTURER MODEL NOTES <br /> (GAL) (GAL) (PSI) (FT) (LBS) <br /> ET-1 HYDRONIC SYSTEM GLYCOL 132 48 14.8 24 335 WESSELS NLA500 OWNER FURNISHED CONTRACTOR <br /> INSTALLED <br /> NOTES: <br /> 1 <br /> O <br /> GLYCOL FEEDER SCHEDULE p <br /> � w ~ <br /> EQUIPOMENT SERVICE FLUID COLD FILL PRESSURE TANK CAPACITY MAX WORKING ELECTRICAL WEIGHT MANUFACTURER MODEL NOTES <br /> (PSI) (GAL) PRESSURE (PSI) (LBS) <br /> OWNER FURNISHED CONTRACTOR <br /> GF-1 HYDRONIC SYSTEM GLYCOL 4 90 53 125 120/1/60 95 WESSELS GMP15050 INSTALLED <br /> NOTES: Q� <br /> 1 <br /> 0 <br /> � � 0 <br /> O <br /> COOLING CONTROL VALVE SCHEDULE o <br /> EQUIPMENT SERVICE FLUID TYPE LINE SIZE GPM CVMANUFACTURER MODEL NOTES <br /> NO. DP (PSI) <br /> CCV-1 LUID COOLER BYPASS GLYCOL 3-WAY-BYPASS 8" 620 PORT FUL2 BELIMO F7100U+PKRXUP-MFT-T-200 - <br /> NOTES: <br /> 1 <br /> SHEET TITLE <br /> MECHANICAL <br /> PIPING <br /> SCHEDULES <br /> M <br /> M <br /> M SHEET <br /> MP30 <br /> 0 <br /> N <br /> O <br /> N <br /> O <br />