Laserfiche WebLink
1 2 3 4 .2 5 6 7 8 8.1 9 10 11 <br /> 14 <br /> 0 0 0 <br /> r /- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - <br /> - - - - - ° ° E ° - \ r / GENERAL NOTES REVISIONS <br /> (E) 13 r°7 �/ NO. DESCRIPTION DATE <br /> ENERATOR <br /> (E) PANEL LP-_ <br /> 0 O O �❑ 1 (E� 1. COORDINATE DEMOLITION WORK WITH PHASING PLAN. <br /> EF JANITOR °� 2. THE INTENT OF THIS PLAN IS TO SHOW AN OVER-ALL SCOPE OF <br /> 14 12 ROOM THE DEMOLITION WORK REQUIRED FOR THE PROJECT. THE <br /> N ° ° (E) P L LCR3 � F 1 CONTRACTOR SHALL BE RESPONSIBLE FOR THE COMPLETE <br /> ❑ II 128 REMOVAL OF UNUSED ELECTRICAL EQUIPMENT WHERE <br /> M.9 (E) PRACTICAL. <br /> (E) P LH E <br /> ELECTRICAL 3. ADDITIONAL WORK MAY BE REQUIRED TO KEEP ALL <br /> ROOM (E) PAL HA REAREANG °J DEPARTMENTS OPERATIONAL DURING CONSTRUCTION. <br /> CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ALL <br /> 16 0 0 0 129 (E) P L LA 126 r° TEMPORARY/CONSTRUCTION LIGHTING AND POWER DURING <br /> � I <br /> (E) P EL LD THE REMODEL AS NECESSARY FOR CONTINUED OPERATION OF <br /> UH < (E)MSB a �I a 11 Im <br /> o (E) PANEL HB= ALL STORE FUNCTIONS. <br /> 1 4. ALL DEVICES SHOWN AND ALL ASSOCIATED CONDUIT AND <br /> BULK o ' o L l CONDUCTORS ARE TO BE DISCONNECTED AND REMOVED <br /> OOD (E) o (E) UNLESS OTHERWISE NOTED. <br /> 14 PRODUCE RECEIVING L <br /> (E) 5. WHERE THE REMOVAL OF ANY FIXTURE, DEVICE OR <br /> RECEIVING (E)MEAT OFFICE 32 EMPL YEE EQUIPMENT RESULTS IN DEMOLITION OF AREAS TO REMAIN, <br /> 142 (E) XIT CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING OR <br /> ❑ BOX COR IDOL 16 UH ROO REPLACING ANY FLOORS, CEILINGS OR WALLS AS NECESSARY <br /> ° TO MATCH EXISTING SURROUNDINGS OR TO ACCOMMODATE <br /> ® 133 23 ° � 123 o ARCH.PROJECT NO. <br /> - - - - - - - - _ _ - - - - - - - - NEW FINISHES. 2004 <br /> 1`❑❑ �-� ❑ � 16 6. REFER TO ARCHITECTURAL PLANS AND SPECIFICATIONS FOR <br /> 25 r L REQUIRED FLOOR, CEILING OR WALL DEMOLITION. DRAwN <br /> 13 T 25 m m 25 25 1 I 25 25 25 25 25 25 25 25 DISCONNECT AND REMOVE ALL FIXTURES, DEVICES, JF/DL <br /> 12 25 I � � E UIPMENT ETC. AND ALL ASSOCIATED WIlZING AND CONDUIT <br /> (E) REMOTE GOO_ � � � � � � � � U CHECKED <br /> (E) I I 16 25 AS NECESSARY. <br /> E MEAT o PRE-CUT 10 GROCERY 7. A SITE VISIT PRIOR TO BID IS MANDATORY TO DETERMINE BC <br /> T (E) <br /> 1 - MEAT = J I I (N)JUICE (E) DAIRY <br /> m F R � r � = I LER COOLER FREEZER (E) REMOTE B 10 EXISTING CONDITIONS. CONTRACTOR MAY REUSE EXISTING suBMiTTAi.DATES <br /> 1 25 41 ° ROOM _ 1 120 WIRING AND/OR CONDUIT SYSTEMS PROVIDED: <br /> 1 r -1 I I 140 25 = (E) MEA L J ll (E) 122 ° ° ° 121 (E) REMOTE C 0 A. ALL ITEMS REUSED ARE IN CONFORMANCE WITH GIVEN 06/11/20 <br /> 25 25 - REP/W P � SPECIFICATIONS. <br /> I GROCERY <br /> m (E) I 11 ROOM TRANSFER - B. ALL CONDUIT, BOXES, ETC. ARE PROPERLY SUPPORTED <br /> a m 134 25 - -- <br /> '��' 125 I � AND SATISFACTORY TO THE APPLICABLE AUTHORITIES OTB DATE <br /> 1 I 25 DELI I I 14 m m o 4 AND OWNER REPRESENTATIVE. <br /> T - <br /> - 8. CONSIDERABLE EFFORT HAS BEEN MADE TO PROVIDE ALL <br /> _LF2-7 _ -_ - - ` 15 5 25 25 I I I - ° NECESSARY INFORMATION TO REFLECT CURRENT CONDITIONS <br /> 1 27 2 t�� - -I � ' ❑I ❑ ❑ ❑ G <br /> LF2-7 I 1 c I I UH 25 I I 1 11 5 7 AND REQUIREMENTS WITHIN THE SCOPE OF THIS PROJECT. <br /> n 11 i i�� i i I I 7 m 16 I 7 7 CONTRACTOR SHALL BE RESPONSIBLE TO FIELD-VERIFY ALL <br /> -' O ELI ( DELI O 2 I I I x <br /> m LF2-7 24 28 d o L- 1 5 11 TYP OF 9 INFORMATION. CONTRACTOR SHALL ALSO HAVE THE L)o <br /> IT 7 (E) PANEL HD P OLE i I I I TYP OF 10 TYP OF 9 LATITUDE TO ADJUST CIRCUIT ASSIGNMENTS WITHIN AND z <br /> LF2-74 E PANEL LC 27 F 6 ® m (E) PANEL LB I I I I <br /> 1 BETWEEN ALL PANELS AS REQUIRED FOR A COMPLETELY o a o ti o <br /> �,) C-,rr 14 or I I � -� � n w d <br /> 25 (E) PANEL LF SEC 1 i i�� f -i �•� �y 10 \ / 1mIIITMIITMI 1M1TI TII J L-J - -_� --_-- -__-_-- _ -_ __----_-- -----_L_ _-_ __-- II o H o <br /> - - k--- ---- 1 OPERATIONAL AND FINISHED PROJECT. PHASE BALANCING TO w H a w a <br /> K - - - - (E)7PAN£LLFF-SEC�'- O - L - L ''.* - - - - - - - - - - - - - _ L _ _ __�- _ - _ _ _ �_ - _ = _ _ = _ - _ = -;Ir , o <br /> -� t - _ = K WITHIN+/- 10°Io IS DESIRED, BUT PHASE BALANCING TO WITHIN o w�" ¢ W <br /> '7 I T a <br /> II I 7 L 11 11 -__�___________=I=______�____ ______=====1=====______=I===== ___________ _= I I I z a Pte. vA"i q Z Z ( m <br /> E 2 "� r ( ') / \ 11 7 _ I III I I +l- 20°Io IS MANDATORY. o g w o w a A <br /> PRODUCE 1 �1 �� - x I I 9. CONTRACTOR SHALL PROVIDE UPDATED TYPED PANEL w a z I w <br /> m I 1 4 TYP OF 10 xca <br /> COOLER / 29 1 25 5 5 ;;I I I SCHEDULES IN ALL EXISTING ELECTRICAL PANELS TO REMAIN, W. 2 4 A z z o <br /> L-- 11 I ww w wqO� _ o, � N <br /> 144 30 11 1 7 TYP OF 11 III I I I REFLECTING FINAL SCOPE AND AVAILABLE SPARES AND 8 u o I � a c6 <br /> 5 5 H1 I II rn�W w ° W <br /> 25 1 II I > cGA O Z Y 3 N <br /> UNUSED SPACES z g q o x . 3 0 <br /> 5 5 �='J��^ �^ 5 � � - - _ TYP"OF13 = - _�_ - _�_ - - - - �___ - __�_ - - �___ - __�_ - - - - � - �___ - �-�_ I�L-J I KEYED NOTES �WWo� �� � U a <br /> �__ - ______ _______ _____________ _______ -�__________- _______ -___________---�____- _____- _ -� II c8 Z A O <br /> / 3 <br /> ° ° 3 <br /> P ° ° �� ' 'r / � '�/ � / / / / � � - � - _ - �-_---�-_---�-_---= -�== - = - __ -�_ - _�-- __ -��--�---�-� 2 INCLUDING ANY ASSOCIATED TRANSFORMERS. DISCONNECT AND � �� � °�O '�° <br /> l � J 11 REMOVE CONDUIT BACK TO SOURCE PER PHASING PLAN, <br /> /''� t /''� f 3 / I / /// / ' TYP OF 13 ii 1 I I SPECIFICATION 236395B. N <br /> •�/ /// / /// / /// /// 5 ii li I 1 o <br /> 2. EXISTING RECEPTACLE TO BE DEMOLISHED. CONTRACTOR TO <br /> (E) ° /// /// / / / /// / - - II <br /> '�^ 3 3 3 - - - - H 1 5 DISCONNECT AND REMOVE EXISTING CONDUIT AND CONDUCTORS o - <br /> PRODUCE ❑ ❑ �, ❑ '^ f 3 p� / �i = <br /> DRY �h^ _ss - - - = -l : _ : � - - - = - _ �- = = �_ - - - - - - - - - -= ll1 1 r-I <br /> 1 = - -I - _ = _-- I I BACK TO SOURCE 2 o Ise <br /> ROOM �- 25 ❑ 25 25 :r% �% ^ ` - --- - _ - - - - - - - _ - -_ - - _ - - _ - - - - - _ - � I <br /> _ 3. EXISTING TOE KICK RECEPTACLE TO BE DEMOLISHED. � � <br /> W -�v _ _ _ r � - r -- �I I I CONTRACTOR TO PROTECT AND RETAIN EXISTING CONDUIT AND Q � w <br /> I ' <br /> 145 I / 1: 1 1 I I CONDUCTORS FOR USE WITH TOE KICK RECEPTACLES ON NEW U) 0 <br /> o <br /> L �� 2 ji 11 1 1 I I CASES. 0 U = a o <br /> - 5 II 1 11 7 < O X O <br /> I I I I 1 II 1 4. EXISTING COOLER DOOR TO BE REPLACED. DISCONNECT EXISTING <br /> H Q <br /> 1 ^r ^ - - - - - - - - J - 1 I I I DOOR HEATER AND LIGHT CIIZCUITS, AND RETAIN AND PROTECT � W_ El - <br /> Fj - <br /> [� ; � <br /> L8CONDUIT AND CONDUCTORS FOR USE WITH NEW DOORS. __ _ _ [ _ _ _ _ _ _ F _ _ [ 5. EXISTING REFRIGERATION EQUIPMENT TO BE REPLACED. �° I�^Isk�^ I- 1 ii n a <br /> 11 I I H 11 CONTRACTOR TO DISCONNECT AND REMOVE CONDUIT AND <br /> i I CONDUCTORS BACK TO SOURCE. EXISTING UNDERGROUND w <br /> r------- ii I CONDUIT TO BE CAPPED AND ABANDONED IN PLACE, AND FILLED Z W ❑ ,� Q <br /> i 1 ^ 'r- - I - - i i i I WITH NON-SHRINK GROUT. L <br /> ❑ I I F� ^ - - - - - - -�- I r 11 6. EXISTING FILTERED WATER DISPENSER TO BE RELOCATED. W r <br /> III m' ° - - fi - - - - - - - - I I -1 I 2 1 -I t -° CONTRACTOR TO DISCONNECT AND REMOVE EXISTING CONDUIT T a ❑ co <br /> EE o 0 0 0 11 0 o I I i o <br /> 1 00 0 o 1 AND CONDUCTORS BACK TO SOURCE. o N <br /> T 14 15 I 7. EXISTING LIGHT FIXTURE TO BE RELOCATED. CONTRACTOR TO o w <br /> II I I 2 i 9 O 1 I PROTECT AND RETAIN EXISTING CONDUIT AND CONDUCTORS FOR N L <br /> 1 _ H- i - - _ _ _ - _ I--- I - - _ -° USE WITH LIGHT FIXTURE IN NEW LOCATION. CONTRACTOR O <br /> o <br /> 1 11i o0 0 0-J o 0 0 0 ^c�i^ c - - - - - - - - - - - - _ 1 I I I SHALL CLEAN AND REFURBISH FIXTURES) TOA"LIKE NEW' Z o <br /> 0 00 0 0 0 0 ^S�^ - - 2 - - - - - - - - - - - - - - - I -� 2 J I- 1 CONDITION AND INSTALL NEW LAMPS. <br /> I I I I I I <br /> 1 0 0 0 0 0 0 0 ° i I 8. EXISTING CCTV CAMERA TO BE RELOCATED. CONTRACTOR TO <br /> 11I o 0o 0 o I o 0 0 0 (E)MAIN - A- <br /> ii <br /> 1 G PROTECT AND RETAIN EXISTING CCTV WIRING FOR USE IN NEW PpFESS/p <br /> SALES n n n n n n n n ----- ICAMERA LOCATION.II II II I <br /> ILLIAM BURTO <br /> 1 � � T 15 14 100 II I - I -I - I - I I � � � <br /> 1 1 i 11 0 0 0 0 0 7 - 7 - 7 7 7 - 7 7 7 7 - - 7 , ^ 7 �, 1 I 9. EXISTING DEVICES IN THE PIZZA AREA TO BE DISCONNECTED CRAB <br /> II o ° I a a O ° o ° 1 1 - ^ ^ ^ c DURING RE-SKIN. CONTRACTOR TO PROTECT AND RETAIN E L6 <br /> 1 1 II o o I o 0 0 0 0 0 0 2 - - - - - - - 2 - -T EXISTING CONDUIT AND CONDUCTORS. UPON COMPLETION OF <br /> 11 III I I - --- --- RE-SKIN, CONTRACTOR TO RECONNECT ALL DEVICES IN EXISTING s F P <br /> 1 i TYP OF 13 - ______________________ ________________________________________ __________________ --________' LOCATIONS. CONNECT ALL DEVICES TO EXISTING CONDUIT AND T9T�FCTR\p OQ�� <br /> II ,r CONDUCTORS. CONTRACTOR IS RESPONSIBLE FOR ENSURE ALL OF CA��F <br /> o0 0 o - ----- --- �__ �� SYSTEMS ARE COMPLETE AND OPERATION AT THE COMPLETION OF <br /> - - _ _ - - - - - _ _ - <br /> 1 T11 ------� 0 0 0 0 o TYP OF 13 - - _1 -I - -I -I -I ^ <br /> III _ I I I I I I I I I I I I 2 I 10. EXISTING REFRIGERATION PROTOCOL TO BE REUSED, INCLUDING <br /> T - - _J - - _J - - _ � � -_ -_ -j - - _j - -_ � -_ -_ � -_ I-_ � -_ _ � _ _ � _ = I ANY ASSOCIATED TRANSFORMERS. RETAIN AND PROTECT <br /> 14 15 - ��r -1 CONDUIT AND CONDUCTORS. PROTOCOL WILL BE REWORKED INTO <br /> O 10 I � I II II I I I I I I I I I ' <br /> I -H 7 - � _ _ J _ _ _ _ � _ _ � _ _ � _ _ � _ _ � _ _ � _ _ _ L _ L ^s1 �� MINI RACK PER PHASING PLAN, SPECIFICATION 236395B. <br /> 1 I �---r 1 <br /> III TYP OF 13 ' 1 11. EXISTING AIR COOLED CONDENSER TO BE DEMOLISHED. <br /> DISCONNECT AND REMOVE CONDUIT AND CONDUCTORS BACK TO <br /> II 7 <br /> SOURCE PER PHASING PLAN, SPECIFICATION 236395B. <br /> TYP OF 13 <br /> III 12. RELOCATE ROWS OF LIGHTS AS NEEDED TO NOT OBSTRUCT NEW Q <br /> I I I <br /> _ _ _______ _ _ _____� - - - - - - SELFCHECK STAND UNISTRUT. <br /> _ - - _ - - - - - - _ - -_ <br /> IF v <br /> ------- 7 '� 'I� 6 , I 13. CONTRACTOR SHALL DISCONNECT ELECTRICAL CONNECTION FOR • <br /> 1 ° ° TYP OF 1 _ _ - - - - - - r r - - - - - - r r �Ir r _1 - - EXISTING MECHANICAL EQUIPMENT AND REMOVE CONDUIT AND O <br /> L _ L _ L _ L �� _ L _ L _ L �� d �� - L I CONDUCTORS BACK TO SOURCE. PROTECT AND RETAIN EXISTING <br /> III --!__ _---_-- -____-- -____-- -____-- CONVENIENCE RECEPTACLE CONDUIT AND CONDUCTOR FOR W <br /> 1 111 5 TYP OF 13 RECONNECTION ON NEW EQUIPMENT. <br /> ❑ ❑ 14. EXISTING MECHANICAL EQUIPMENT TO BE REMOVED. <br /> ❑ �� <br /> II � CONTRACTOR TO RETAIN AND PROTECT CONDUCTORS FOR Q <br /> II TYP OF 13 CONNECTION TO NEW UNIT. <br /> II 15. PROTECT AND RETAIN EXISTING CONVENIENCE RECEPTACLE ~ <br /> CONDUIT AND CONDUCTORS FOR RECONNECTION ON NEW MM <br /> 1I 19 ® EQUIPMENT. <br /> II 16. EXISTING MECHANICAL EQUIPMENT TO REMAIN, RETAIN AND Q <br /> PROTECT DURING CONSTRUCTION. <br /> I II - r � 17 1 .. <br /> II Fz <br /> 1 I I 17 ITM° 17. EXISTING SELF CHECKSTAND TO BE REPLACED IN NEW LOCATION. O <br /> 1 I _E 3- 4 11 a CONTRACTOR TO DISCONNECT EXISTING POWER POLE, DATA O <br /> I I 11 I 1 CABLING, CONDUIT AND CONDUCTORS. PROTECT AND RETAIN 0 <br /> m 17 1 ii 16 EF E 14 EXISTING POWER POLE, POLE BASE, POLE MOUNTED RECEPTACLES O <br /> 1 II ' 6 - 3 AND ALL CONDUIT, CONDUCTORS AND DATA CABLING FOR USE O ►� <br /> II " �� (E) ❑ (( WITH NEW SELF CHECKSTAND. <br /> 1 Ili' 17 r Iii BAKERY 18. EXISTING SELF CHECKSTAND ATTENDANT STATION TO BE 0 <br /> 1 II 5 17 ° 1I 119 E REPLACED IN NEW LOCATION. CONTRACTOR TO DISCONNECT O <br /> II „ H I - 2 14 EXISTING POWER POLE, DATA CABLING, CONDUIT AND �--� <br /> -J ❑ - - - - - - - - - - T T TZI I_ - - ^ ^ ^ - 15 T I (� CONDUCTORS. PROTECT AND RETAIN EXISTING POWER POLE, >� <br /> 1�--'i I I - I I I ^ ^ I ^ ' I^ I ^ ^ I I I (L4) 4 I � POLE BASE, POLE MOUNTED RECEPTACLES AND ALL CONDUIT, <br /> - - - - - - - ' ` ' ` ' ` ' ` ' ` ' ` I I n CONDUCTORS AND DATA CABLING FOR USE WITH NEW SELF <br /> Lii1 <br /> r-1i <br /> 18 n° 11 JANITOR'S T <br /> 12 12 8 14 15 (E) ICE (E) Tj <br /> HOCA UNIT 'J' CHECKSTAND ATTENDANT STATION. <br /> CLOSET (E) PIZZA VE DOR T TAIRS HOCA UNIT 'J' 11 19. EXISTING CHECKSTAND TO BE DEMOLISHED. DISCONNECT AND <br /> TYP OF 3 TYP OF 3 103 105 _ _ 1 9 14 15 112 REMOVE ALL EXISTING DEVICES AND ALL RELATED WIRING AND <br /> 1 Ir 7 O T 11 r ABOVE GROUND CONDUIT. REMOVAL OF WIRING AND CONDUIT <br /> 14 <br /> I I I __-- 16 EF 6 L z E SHALL BE BACK TO SOURCE. EXISTING CHECKSTAND CORE HOLES <br /> _ _ _ _ _ - _ _ _ _ - 21 - - - - I - - - 4- - - - - - - - - - C TO BE FILLED WITH NON-SHRINK GROUT. <br /> HOCA UNIT N' I� (HOCA UNIT 'M' I 1 I iT^ ^,I46�, n E) PANEL LH SEC 1 <br /> / I II ^ ^ O PANEL LJ- ___ �� I (E) PANEL LH SEC2 <br /> - - - - - - - - - - 1 1 21. EXISTING ATM TO BE RELOCATED. CONTRACTOR TO TERMINATED <br /> B - - - - - - - - ❑ - - - - - 11 - 11 m ° HOCA UNIT L' ' 1 27 27 EXISTING ATM CONDUCTORS ON NEW DUPLEX RECEPTACLE TO BE <br /> / - - EF I MOUNTED IN EXISTING JBOX. <br /> / / �� L (E) EXI 14 1 11 -- 23. PIZZA SUSPENDED CEILING IS TO BE REPLACED. PROTECT AND <br /> �� T 1 RETAIN EXISTING WIRING CONDUIT BOXES COMMUNICATION <br /> - o 0 0 / / (E) 102 0 I 1 EF ' <br /> o 0 0 (E) CART J ____J i i 1 <br /> Z <br /> �� CABLING, PAGING DEVICES AND RELATED MATERIAL DURING <br /> STORAGE ENTRY (E) 9 11 I I I � �- CEILING WORK. <br /> 1 146 101 ❑ R I 16 16 EFV� 24. EXISTING WATER HEATER AND RECIRCULATION PUMPS TO BE <br /> - - - - � � �r o Ll 23 T 7 25 25 25 REPLACED IN PLACE. CONTRACTOR TO PROTECT AND RETAIN <br /> EF T 1 z v r IF 17-7 <br /> EXISTING CONDUIT AND CONDUCTORS FOR USE WITH NEW <br /> - <br /> - L - - � - - ` °F-71-77-7-777 7 L115 ❑ 14 3 - - I I I I D C EQUIPMENT. <br /> 13 - - - - , <br /> - - - I� L) I 16 15 E (E) E A 25. EXISTING CASE/COIL TO REMAIN. REMOVE EXISTING LINE AND <br /> T ( ) E BOO ( ) E MEN E ) LOW VOLTAGE CONDUCTORS BACK TO SOURCE AND RETAIN <br /> (E) PIZ ) CU TOMER CUSTOMER O MEN'S ( ) O BA Ry EXISTING RACEWAY TO STRUCTURE THAT IS ABLE TO BE REVISED <br /> PREP, GROCERY SERVICE SERVICE KE PIN RESTROOM RESTRO BAKEY COOLER FOR NEW CABLING. <br /> 106 TRANSFER 110 STORAGE 113 114 115 FREEZER 118 <br /> 1 2 3 (E) REMOTE B 4 5 5.6 6 6.2 6.4 7 7.3 108 8 111 9 10 117 11 26. EXISTING PRODUCE MISTER TO BE REPLACED. CONTRACTOR TO <br /> 7 (E) REMOTE C <br /> (E) REMOTE D PROTECT AND RETAIN EXISTING CONDUIT AND CONDUCTORS FOR <br /> EXTENSION TO NEW PRODUCE MISTER IN NEW LOCATION. <br /> (E) REMOTE A ELECTRICAL DEMOLITION PLAN NDR?I� 27. DISCONNECT AND REMOVE EXISTING LIGHT FIXTURE(S). REMOVE <br /> ® F F ALL ASSOCIATED WIRING AND CONDUIT TO NEXT UPSTREAM <br /> (E) XFMR R1 3/32" = 1'-0" <br /> (E) PROTOCOL A DEVICE. <br /> 10 7 8 9 10 28. EXISTING CHICKEN FRYER TO BE RELOCATED. CONTRACTOR TO <br /> (E PROTOCOL E PROTECT AND RETAIN EXISTING CONDUIT AND CONDUCTORS FOR <br /> ❑ - C I I ❑ I I C EXTENSION TO NEW LOCATION. PROTECT AND RETAIN EXISTING <br /> 10 I I I I I ❑ I I I SHEET TITLE <br /> (E) REMOTE A 10 -� I RECEPTACLE FOR USE IN NEW LOCATION. <br /> 10 (E) PANEL LCR2 (E) PANEL HSL O� 29. EXISTING COMBI OVEN TO BE RELOCATED. CONTRACTOR TO <br /> 10 u ° (E) PANEL LCR1 (E) PANEL HC PROTECT AND RETAIN EXISTING CONDUIT AND CONDUCTORS FOR <br /> (E) RPI. (E) PROTOCOL F (E) REMOTE D 10 _ (E) PANEL LEM I�,I ❑ EXTENSION TO NEW LOCATION. PROTECT AND RETAIN EXISTING ELECTRICAL <br /> ❑ ( ° ) _ LTJ DISCONNECT FOR USE IN NEW LOCATION. <br /> ® I � ° DEMOLITION <br /> - - � K �____J i i (E) PANEL LG1 30. EXISTING HOT CASE TO BE RELOCATED. CONTRACTOR TO <br /> (E) REAR IDF J -(EIN)1PANEL - Fool DISCONNECT AND REMOVE EXISTING CONDUIT AND CONDUCTOR PLAN <br /> 7 (E)IPANEL MD1 :)L [ D BACK TO SOURCE. RETAIN EXISTING CIRCUIT FOR USE WITH <br /> ❑ RELOCATED HOT CASE. <br /> LG 1-7 <br /> a I II 1 24 31. EXISTING DELI HOOD TO BE REPLACED. CONTRACTOR TO <br /> , rl �� LG1-7 DISCONNECT AND REMOVE CONDUIT AND CONDUCTORS. SHEET <br /> M REFRIGERATION COMPRESSOR NORTH A A 32. EXISTING MECHANICAL EQUIPMENT TO BE RELOCATED. <br /> CONTRACTOR TO PROTECT AND RETAIN EXISTING CONDUIT AND <br /> NPLATFORM DEMOLITION PLAN 7 8 9 10 CONDUCTORS FOR EXTENSION TO NEW LOCATION. <br /> 0 <br /> 3/32" = 1'-0" MEZZANINE DEMOLITION PLAN No <br /> 3/32" = F-0" <br />