Laserfiche WebLink
OPW Installation, Operation,and Maintenance Manual. Page 76 Executive Order VR-102-0 <br /> STEP 7: DRILL HOLES ously apply sealant to the first 6 male threads on the <br /> With the inlet tube in place,carefully drill (3) 1/8"diam- valve body as shown in figure 10. Make sure coverage <br /> eter pilot holes through the drop tube and inlet tube at is completely around the threads,and work the sealant <br /> three locations at 120 degree intervals around the tube, down into the thread profile. Quickly thread the lower <br /> 1 inch below the flange. Using the pilot holes, drill (3) tube onto the valve body. Tighten the tube securely by <br /> 5116"dia.holes through the tubes. Remove the burrs hand or with a strap wrench_ Remove excess sealant <br /> from the drilling operation from the inside of the drop and smooth sealant bead with water moistened mixing <br /> tube assembly with a fine half round file. i <br /> IMPORTANT: Allow sealant(epoxy)to cure for 24 <br /> IMPORTANT:A 5116"drill bit must be used. Do not hours before installing into tank. <br /> substitute any other size drill bit. <br /> rp I Sextant con,rWe'i <br /> around rrst 5 uvexds <br /> Figure 10 <br /> t <br /> 1 NOTE: Before installing the valve in the tank,a pres- <br /> sure test can be performed on the valve to check for <br /> vapor tightness. Seal off both ends of the tube with <br /> Figure 7 inflatable plumber's plugs.Apply a maximum 10"W.C. <br /> STEP 8: ASSEMBLE AND SEAL CLINCH STUDS (113 PSI) air pressure. If pressure does not hold and a <br /> leak can be located with soap solution, do not install <br /> Loosely assemble the the valve. Send the valve back to OPW for warranty <br /> three(3)clinch studs,lock evaluation. Caution: Do not over-pressure. Excess pres- <br /> washers,and nuts insure can damage the valve. <br /> holes. Do not tighten at " Apply Sealant STEP 11: CUT LOWER TUBE AT 45 ANGLE <br /> this time. Mix up a small -- ;, Measuring from the underside of the inlet tube flange, <br /> amount of sealant. Gen �/ ? <br /> r mark the overall length of the drop tube a distance of <br /> erously apply sealant un- <br /> t3 <br /> (B)minus <br /> derneath each clinch stud "or as per local codes or requirements. De- <br /> ', termine dimension(B)from the measurements taken in <br /> head,each nut,and on `� <br /> Step 1,Figure 1 (Top of the Face Seal Adaptor below the <br /> the outside of the tube r <br /> around the holes. :_ _ drain valve outlet in the spill container to the bot-tom <br /> of the tank). Saw off the excess tube at a 45-degree <br /> angle, and file off any sharp burrs(Refer to Figure 16). <br /> Optional: Install the OPW Tank Bottom Protector an the <br /> Figure 8 lower tube (Refer to Installation instructions supplied <br /> with the Tank Bottom Protector). <br /> STEP9:TIGHTEN SELF-CLINCHING STUDS STEP 12: PREPARE FILL RISER FOR VALVE INSER- <br /> Tighten clinch studs securely with a'/2"wrench. Use TION <br /> only the self-clinching studs that are supplied with the IMPORTANT: Inspect the riser pipe for any foreign ma- <br /> unit. Seating torque is 11.5 ft-lbs min. to 13.5 ft-lbs terial. Over spray from tank relining or any internal <br /> max. Do not over tighten. Note: Failure to properly burrs inside of pipe must be removed prior to installa- <br /> apply and cure the sealant may result in a failure of a tion. Failure to have an unobstructed riser pipe may <br /> pressure decay leak test- prevent proper installation or operation of the valve. <br /> STEP 10: LOWER TUBE ASSEMBLY Thoroughly clean top of riser pipe. <br /> If a vise is used,clamp on the valve body casting only to <br /> avoid damage to the float. Mix the remaining sealant <br /> until the color is uniform. Using the mixing stick, gener- <br /> a <br /> I <br />