Laserfiche WebLink
OPW Installation, Operation, and Maintenance Manual, Page 77 Executive Order VR-102-0 <br /> tnt <br /> ORTANT: Before installing the valve,allow seal- CAUTION: No obstruction in the tank can be within 13" <br /> to cure for 24 hours. from the center of the riser pipe or the valve may not <br /> operate properly. <br /> STEP 16:ALIGN VALVE <br /> STEP 13: REMOVE ELASTIC BAND Install the OPW Jack Screw Kit and a 4"nipple to lock <br /> Remove the elastic band securing the float to the valve the valve in place. Refer to the Installation Instructions <br /> body. The Float will move into an outward position. supplied with the Jack Screw Kit. Install the Rotatable <br /> STEP 14: INSERT DROP TUBE Product Adaptor(Refer to Installation Instructions sup- <br /> Make sure the 0-Ring gasket is under plied with the Rotatable Product Adaptor.) Make sure <br /> the flange of the inlet tube. Hold the that the valve does not rotate while tightening the <br /> floatdown against the valve body and r adaptor by observing the position of the deflector. The <br /> slowly insert the drop tube overfill valve valve must remain aligned along the length of the tank <br /> into the riser pipe. Do not force valve as in Step 15. Repeat this step as necessary to assure <br /> into the riser pipe. lfany obstruction or proper valve alignment. <br /> foreign matterinlerfereswith smooth <br /> '.'�:o•Fecovery F I <br /> insertion of the valve,the riser pipe must se, <br /> becleared. <br /> WARNING Failure to follow the assem- <br /> bly and installation instructions or use = i <br /> of excessive force to insert the OPW <br /> 61SO will VOID THE WARRANTY! <br /> Difficulty in removing the existing till <br /> tube(if there isone)meanstheremay �' <br /> F kir.•.,,,� <br /> be an obstruction in the riser pipe. Look rigure 14 T"t <br /> for burrs,deformations,excess tank lin- <br /> �t7_rt•*+t•iS <br /> ing material or other projections that may interfere with ----­-------- <br /> easy <br /> _________ __easy insertion of the OPW 61 SO.The 61 SO is designed <br /> for insertion into schedule 40 pipe. If schedule 80 pipe -- <br /> has been used for the riser,the 61 SO cannot be in- �—~' `"'^=r,J. ''T'r' <br /> stalled. If seamed pipe has been used,the internal weld <br /> bead may interfere with the OPW 61 SO and prevent Figure 16 <br /> installation. If the OPW 61 SO won't slip in easily DON'T <br /> FORCE IT! Damage to the valve may result if excess <br /> force is used. Examine the riser pipe carefully:deter- <br /> mine the nature of the obstruction; take appropriate <br /> steps to remove it. <br /> STEP 15:CHECK INSTALLATION <br /> t,fa:r <br /> Insert the drop tube all the way into <br /> the tank until the flange and gasket --� <br /> seat onto the top of the Face Seal <br /> Adaptor. The float will swing out <br /> into the operating position as it — <br /> n <br /> passes into the tank. Make sure ;G.a Yyryr ,r <br /> that the float is aligned along the <br /> length of the tank. The length of <br /> the tank can easily be determined c•:c <br /> by locating other manholes or <br /> pump boxes that are installed Figura 16A <br /> around other tank fittings. Look Figure 1'5- <br /> into the drop tube and align the deflector <br /> with the length of the tank. <br />