My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
755
>
2300 - Underground Storage Tank Program
>
PR0508090
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2023 9:29:42 AM
Creation date
9/24/2020 9:29:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0508090
PE
2361
FACILITY_ID
FA0007938
FACILITY_NAME
CHEVRON #208117**
STREET_NUMBER
755
Direction
S
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
24202029
CURRENT_STATUS
01
SITE_LOCATION
755 S TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 2 <br /> 2 . SECONDARY PIPE TESTING <br /> Test Method Developed By : ❑ Piping Manufacturer ® Industry Standard ❑ Professional Engineer <br /> ❑ Other (Spec) <br /> Test Method Used : ® Pressure ❑ Vacuum ❑ Hydrostatic <br /> ❑ Other (Spec) <br /> Test Equipment Used : See attached testing procedures Equipment Resolution : <br /> Piping Run # 87 Piping Run # 91 Piping Run # Piping Run # <br /> Piping Material : Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith <br /> Piping Diameter: 3" 3 " <br /> Length of Piping Run : Approx 200 ' Approx 200 ' <br /> i <br /> Product Stored: 87 Gas 91 Gas <br /> Method and location of Test boot in Sump Test boot in Sump <br />= i in -run isolation : <br /> E Wait time between applying 30 minutes 30 minutes <br /> pressure/vacuum/water and <br /> startin test: <br /> Test Start Time : 9 : 50am 9 : 50am <br /> Initial Reading (RI) : 5 PSI 5 PSI <br /> TestMeaF <br /> : 10 : 50am 10 : 50am <br /> Fina (RF) : 5 PSI 5 PSI <br /> Test I hour 1 hour <br /> Chading (RF-RI) : 0 0 <br /> Passshold or 0 .00 0. 00 <br /> CritTes ® Pass ❑ Fail ® Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Comments — (include information on repairs made prior to testing, and recommended follow-up for•failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.