Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> SPILL CONTAINER TESTING REPORT FORM (Page 1 of 1 ) <br /> Type of Action ❑ Installation Test ❑ Repair Test ❑ 12 Month Test <br /> I . FACILITY INFORMATION <br /> CERS ID Date of Spill Container Test <br /> 10182313 02/ 13/ 19 <br /> Business Name (Same as Facility Name or DBA-Doing Business As.) <br /> Chevron 208117 <br /> Business Site Address City ZIP Code <br /> 755 S . Tracy Blvd Tracy 95376 <br /> II . UNDERGROUND STORAGE TANK SERVICE TECHNICIAN INFORMATION <br /> Name of UST Service Technician Performing the Test (Print as shown on the ICC Certification.) Phone # <br /> Nick Harvey (714) 826 - 0352 Ext, <br /> Contractor/Tank Tester License # ICC Certification # ICC Certification Expiration Date <br /> 300345 A B C61 /D40 HAZ 5115738 01 / 11 /2021 <br /> Spill Container Testing Training and Certifications (List applicable certifications.) <br /> III . SPILL CONTAINER TESTING INFORMATION <br /> Test Method Used : <br /> ❑ Manufacturer Guidelines : (Specify) <br /> E Industry Code or Engineering Standard : (Specify) PEI RP1200 <br /> ❑ Engineered Method : (Specify) <br /> # of Attached Pages <br /> j Attach the testing procedures and all documentation required to determine the results. <br /> Tank ID : (By tank number, stored product, etc.) 87 91 <br /> Spill Container Manufacturer: Philtlte Philtite <br /> E Non-Metallic E Non-Metallic ❑ Non-Metallic ❑ Non-Metallic <br /> Method of Cathodic Protection El isolation ElIsolation E] Isolation ElIsolation <br /> El Other El Other <br /> El Other El Other <br /> (Specify in section V) (Specify in section V.) (Specify in section V.) (Specify in section V.) <br /> Inside Diameter of Spill Container: (Inches) <br /> 12 " 12 " <br /> Depth of Spill Container: (Inches) 12- 1 /2 " 12- 1 /2 " <br /> Does the spill container have a 5 gallon capacity? ® Yes ❑ No 1 Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No <br /> 6' E Drain Valve E Drain Valve ❑ Drain Valve ❑ Drain Valve <br /> is <br /> Method to Keep Spill Container Empty ElOnsite Pump ElOnsite Pump ElOnsite Pump ElOnsite Pump <br /> I <br /> I <br /> El Other El Other El Other El Other <br /> (Specify in section V.) (Specify in section V) (Specify in section V) (Specify in section V) <br /> IV. SUMMARY OF TESTING RESULTS <br /> Spill Container Test Results ® Pass ❑ Fail E Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> V. COMMENTS <br /> All items marked "Fail" above must be explained in this section. Any additional comments may also be provided here. <br /> VI . CERTIFICATION BY UST SERVICE TECHNICIAN CONDUCTING THIS TESTING <br /> I hereby certify that the spill containers were tested in accordance with California Code of Regulations, title 23, division 3, chapter 16, section <br /> 2637. 1 and all the information contained herein is accurate. <br /> UST Service Technician Signature <br /> If the facility has more components than this form accommodates, additional copies of this page may be attached. <br /> CERS = California Environmental Reporting System, ID = Identification, UST = Underground storage tank, ICC = International Code Council <br />