Laserfiche WebLink
A-6-13"P001 AN DUAL INSPECDON <br /> %,zeneraill inspection Informatio-__ <br /> (36 months from inspection <br /> I tnsrertion Cate: 1/24/2019 Retain Until Cate: 1!24/2022 date) <br /> Prior Inspection Date: '!9/2015 Inspector Name: Philip Thiel <br /> jTarms tnspactr-.d(ID#'s):Used Oil WASTE Oil- <br /> inspection <br /> ILinspect on Guidance: <br /> For equipment not included in this standard, follow the manufacturer recommended inspection/testing schedules and <br /> pr oce ores. <br /> v The periodic AST inspection is intended for monitoring the external AST condition and its containment structure.This visual <br /> i,,^,spiaction does not require a Certified inspector. It shall be performed by an owner's inspector who is familiar with the site <br /> and can identify changes and developing problems. <br /> P Remove prosnotly upon discovery standing water or liquid in the primary tank, secondary containment area, interstice, or <br /> SPM cortainer. Before discharge to the environment, inspect the liquid for regulated products or other contaminants and <br /> dssposed of it properly, <br /> in order to r-amply with EPA SPCC (Spill Prevention, Control and Countermeasure) rules, a facility must regularly test liquid <br /> level sensing•devices to ensure proper operation (40 CFP, 112.8(c)(8)(v)). <br /> .,von-oanforrninq items important to tank or containment interarily require evaluation by an engineer experienced in AS- <br /> design,a Cerufled inspector, or a tank manufacturer who will determine the corrective action. Note the non-conformance and <br /> c:o,esponding corrective action in the comment section" <br /> Retain the compieted checklists for 06 months. <br /> Complete this checklist on an annual basis supplemental to the owner monthly-performed inspection checklists. <br /> Note: if a change has occurred to the tank system or containment that may affect the SPCC plan,the condition <br /> Shoui'd be earaduated against the rurrent plan requirement by a Professional Engineer knowledgeable in SPCC <br /> development and implementation. <br /> i stern Task <br /> Status <br /> 1.0 Tank Containment _ <br /> 5_1 Containment structure Is structure free of: rw Yes r No F N/A <br /> �m Holes or cracks in containment wall or floor ; w Yes r No r N/A <br /> ® Washout r Yes r No N/A <br /> �e Liner degradation I <br /> ie Corrosion y Wo Yes r No NIA <br /> I- Leakage Yes r No N/A <br /> 6 Paint failure , T70 Yes r No N/A <br /> m Tank settling Tv Yes r No N/A <br /> Comments: <br /> 2 'Tank Foundation and Supports <br /> 1 2.1 t=oundatior No observed settlement or foundation washout? I Yes r No <br /> f'- ---� <br /> 2.2 Concrete pad or ring wall No visible cracking or spalling? f+a Yes r No r N/A <br /> 2,3 suppo is No visible corrosion, paint failure, etc.? Yes r No NIA <br /> 2.4 Afater drainage Water dramage away from tank? J—Yes No Tv N/A <br /> ' Tank grounding Strap secured and in good conditions � f"Yes r No 17 NIA <br /> If intrinsically ground please note in comments. <br /> Comments: <br /> Ca'r`=06 <br /> _ — - <br /> SEPTEMBER 2G16 <br />