My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
3105
>
2200 - Hazardous Waste Program
>
PR0505946
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2020 2:12:15 PM
Creation date
9/24/2020 1:14:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1900 - Hazardous Materials Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0505946
PE
2227
FACILITY_ID
FA0003680
FACILITY_NAME
CALIFORNIA TANK LINES INC
STREET_NUMBER
3105
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17512028
CURRENT_STATUS
01
SITE_LOCATION
3105 S EL DORADO ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
California Tank Lines, Stockton, CA 95206 <br /> Waste Oil Tank Assessment Report <br /> Comments: <br /> Not applicable, not a new tank system. <br /> Indoor Installation; the tank systems or components are indoor not in contact with soil or water- <br /> a)(4) ) <br /> ater_a 4 --Not Applicable if this is an above ground tank system. <br /> Lmments: NIA <br /> and <br /> (a)(5)—Design considerations to ensure that: <br /> A.) Tank foundations will maintain the load of a full. tank <br /> S) Tank systems will be anchored to prevent floatation or dislodgement where the tank <br /> system is placed in a saturated zone, or is located within a seismic fault zone <br /> C Tank systems will withstand the effects of frost heave <br /> Comments: N/A <br /> The AST at this facility meets all of these criteria listed in the section (a)(5). <br /> The tank was custom built and fabricated by the supplier (NJ McCrutchen, Sacramento, CA. The <br /> primary tank is contained within the secondary tank. The secondary outer tank is anchored to the <br /> ground. <br /> Title 22 CCR, 66265.192(6)(16)-- Independent, qualified professional engineer's inspection for the <br /> presence of the following after installation: <br /> 1) Weld breaks; <br /> 2) Punctures; <br /> 3) Cracks; <br /> 4) Corrosion; <br /> 5) Other structural damage or inadequate construction or installation. <br /> Comments: <br /> The professional Engineer has confirmed that the integrity of the AST at this facility has not been <br /> compromised by any of the above-mentioned conditions. <br /> Title 22 CCR, 66265.192(d)--All new tanks and ancillary equipment shall he tested for tightness <br /> prior to being laced in use. <br /> Comments: <br /> Not applicable; not a new tank_ <br /> Page 3 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.