Laserfiche WebLink
July 17th 2007 PSC submitted samples of tanks rinsate water <br />and floor block & wet deck solids to <br />McCampbell Analytical. Pending results on <br />CAM 17 Metals, RCI and total cyanides. <br />July 20th 2007 PSC delivered one (1) 275 -gallon liquid tote for <br />decon water storage. All rafter and ceiling joists <br />have been pressure washed. The floors and <br />walls in the office area and buffing room have <br />been pressure washed. The plating area has <br />been pressure washed (3) times to date. The <br />concrete containment berm has been removed <br />and staged on a pallet for future disposal. All <br />rinsate has been collected and is staged in the <br />275 -gallon liquid tote for analysis and future <br />disposal. <br />July 25" 2007 Contacted PSC for an additional liquid tote. <br />After all the palletized debris has been removed <br />for disposal the entire area will be pressure <br />washed again. Upon inspection by PSC a final <br />rinsate sample will be collected to verify the <br />decon efforts. <br />