My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
316
>
2200 - Hazardous Waste Program
>
PR0513605
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2020 11:02:04 AM
Creation date
9/29/2020 9:39:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0513605
PE
2220
FACILITY_ID
FA0007669
FACILITY_NAME
LODI CHROME
STREET_NUMBER
316
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
LODI
Zip
95240
APN
04123011
CURRENT_STATUS
02
SITE_LOCATION
316 N MAIN ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
506
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
July 17th 2007 PSC submitted samples of tanks rinsate water <br />and floor block & wet deck solids to <br />McCampbell Analytical. Pending results on <br />CAM 17 Metals, RCI and total cyanides. <br />July 20th 2007 PSC delivered one (1) 275 -gallon liquid tote for <br />decon water storage. All rafter and ceiling joists <br />have been pressure washed. The floors and <br />walls in the office area and buffing room have <br />been pressure washed. The plating area has <br />been pressure washed (3) times to date. The <br />concrete containment berm has been removed <br />and staged on a pallet for future disposal. All <br />rinsate has been collected and is staged in the <br />275 -gallon liquid tote for analysis and future <br />disposal. <br />July 25" 2007 Contacted PSC for an additional liquid tote. <br />After all the palletized debris has been removed <br />for disposal the entire area will be pressure <br />washed again. Upon inspection by PSC a final <br />rinsate sample will be collected to verify the <br />decon efforts. <br />
The URL can be used to link to this page
Your browser does not support the video tag.