Laserfiche WebLink
5. Summary of significant activities that occurred during construction. Include a <br />discussion of problems encountered and how they were addressed; <br />6. Summary of any inspection findings (include copies of key inspection documents <br />in appendices); <br />7. As built drawings; and <br />8. A schedule indicating when any treatment systems will begin full scale <br />operations. <br />G. Corrective Measure Completion Report <br />The Owner/Operator or Respondent shall prepare a Corrective Measure <br />Completion Report when the Owner/Operator or Respondent believes that the <br />corrective measure completion criteria have been satisfied. The purpose of the <br />Corrective Measure Completion Report is to fully document how the corrective <br />measure completion criteria have been satisfied and to justify why the corrective <br />measure and/or monitoring may cease. The Corrective Measure Completion <br />Report shall, at a minimum, include the following elements: <br />Purpose; <br />2. Synopsis of the corrective measure; <br />3. Corrective Measure Completion Criteria <br />Describe the process and criteria for determining when corrective measures, <br />maintenance and monitoring may cease. Corrective measure completion criteria <br />were given in the final Operation and Maintenance (O&M) Plan; <br />4. Demonstration that the completion criteria have been met. Include results of <br />testing and/or monitoring, indicating how operation of the corrective measure <br />compares to the completion criteria; <br />5. Summary of work accomplishments (e.g., performance levels achieved, total <br />hours of treatment operation, total treated and/or excavated volumes, nature and <br />volume of wastes generated, etc.); <br />6. Summary of significant activities that occurred during operations. Include a <br />discussion of problems encountered and how they were addressed; <br />7. Summary of inspection findings (include copies of key inspection documents in <br />appendices); and <br />