My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
316
>
2200 - Hazardous Waste Program
>
PR0513605
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2020 11:02:04 AM
Creation date
9/29/2020 9:39:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0513605
PE
2220
FACILITY_ID
FA0007669
FACILITY_NAME
LODI CHROME
STREET_NUMBER
316
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
LODI
Zip
95240
APN
04123011
CURRENT_STATUS
02
SITE_LOCATION
316 N MAIN ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
506
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. Summary of significant activities that occurred during construction. Include a <br />discussion of problems encountered and how they were addressed; <br />6. Summary of any inspection findings (include copies of key inspection documents <br />in appendices); <br />7. As built drawings; and <br />8. A schedule indicating when any treatment systems will begin full scale <br />operations. <br />G. Corrective Measure Completion Report <br />The Owner/Operator or Respondent shall prepare a Corrective Measure <br />Completion Report when the Owner/Operator or Respondent believes that the <br />corrective measure completion criteria have been satisfied. The purpose of the <br />Corrective Measure Completion Report is to fully document how the corrective <br />measure completion criteria have been satisfied and to justify why the corrective <br />measure and/or monitoring may cease. The Corrective Measure Completion <br />Report shall, at a minimum, include the following elements: <br />Purpose; <br />2. Synopsis of the corrective measure; <br />3. Corrective Measure Completion Criteria <br />Describe the process and criteria for determining when corrective measures, <br />maintenance and monitoring may cease. Corrective measure completion criteria <br />were given in the final Operation and Maintenance (O&M) Plan; <br />4. Demonstration that the completion criteria have been met. Include results of <br />testing and/or monitoring, indicating how operation of the corrective measure <br />compares to the completion criteria; <br />5. Summary of work accomplishments (e.g., performance levels achieved, total <br />hours of treatment operation, total treated and/or excavated volumes, nature and <br />volume of wastes generated, etc.); <br />6. Summary of significant activities that occurred during operations. Include a <br />discussion of problems encountered and how they were addressed; <br />7. Summary of inspection findings (include copies of key inspection documents in <br />appendices); and <br />
The URL can be used to link to this page
Your browser does not support the video tag.