My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
316
>
2200 - Hazardous Waste Program
>
PR0513605
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2020 11:02:04 AM
Creation date
9/29/2020 9:39:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0513605
PE
2220
FACILITY_ID
FA0007669
FACILITY_NAME
LODI CHROME
STREET_NUMBER
316
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
LODI
Zip
95240
APN
04123011
CURRENT_STATUS
02
SITE_LOCATION
316 N MAIN ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
506
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8. Summary of total operation and maintenance costs. <br />H. Submittal Summary <br />The following list provides a summary of when and how key documents should <br />be submitted to the Department. The Department may adjust this list to meet <br />site-specific circumstances. <br />The submittal schedule for the documents listed below should be included in an <br />enforcement order, permit or otherwise specified by the Department. <br />o CMI Workplan <br />2. The submittal schedule for the documents listed below must be specified in the <br />CMI Workplan. The groupings reflect which documents should be submitted <br />together. <br />o Draft Plans and Specifications <br />o Draft Operation and Maintenance Plan <br />o Draft Construction Workplan <br />o Final Plans and Specifications <br />o Final Operation and Maintenance Plan <br />o Final Construction Workplan <br />3. The submittal schedule for the document listed below must be specified in the <br />Final Construction Workplan. <br />o Construction Completion Report <br />4. The submittal schedule for the document listed below is based on when the <br />Owner/Operator or Respondent believes the completion criteria have been <br />satisfied. <br />o Corrective Measure Completion Report <br />5. The submittal schedule for Progress Reports and a Health and Safety Plan shall <br />be specified in the order or permit. <br />
The URL can be used to link to this page
Your browser does not support the video tag.