Laserfiche WebLink
Hazardous Material I less Plan December 12,2008 <br /> Papi Kenworth —French Camp Page ii of ii <br /> 2. Review of facility environmental documents: <br /> a) Existing Hazardous Materials Business Plan for the previous <br /> operator (Central California Kenworth); <br /> b) Spill Prevention, Control, and Countermeasure (SPCC) Plan;' <br /> c) Hazardous Waste Disposal receipts and manifests (where <br /> available); and <br /> d) Facility inspection records; <br /> 3. Site reconnaissance of the project site, observing: <br /> a) Site uses; <br /> b) Presence of hazardous substances and petroleum products, <br /> including tanks, drums, other containers, engineering controls, and <br /> methods of storage and use; <br /> 4. Interviews with the previous operator's representatives; <br /> 5. Review of San Joaquin County Environmental Health Department and <br /> Office of Emergency Services [SJCEHD and OES; the local Certified <br /> Unified Program Agency (CUPAs)] guidelines and restrictions; and <br /> 6. Compilation of all information into a report utilizing Unified Program <br /> Consolidated Forms for Hazardous Materials Facilities, narrative, and site <br /> maps. An electronically-formatted version may also be required by OES, <br /> pending notification of operator change. <br /> GENERAL QUALIFICATIONS <br /> Lawrence & Associates is a consulting firm providing services in groundwater <br /> hydrology, engineering geology, and civil engineering since 1976. Some of our <br /> engineering services include: <br /> • Environmental Site Assessments: Transaction Screens, Phase I, and <br /> Phase II <br /> • Leaking underground storage tank (UST) investigation and corrective <br /> action <br /> • Preparation of Spill Prevention, Control, and Countermeasure (SPCC) <br /> plans <br /> • Landfill monitoring, design, and closure <br /> • Soils investigation <br /> • Design of water-treatment and gas-control systems <br /> • Hazardous-waste investigations and remediation <br /> • Water resources and water rights <br /> • Municipal-well design <br /> • Groundwater and watershed-runoff modeling <br /> Spill Prevention,Control,and Countermeasure(SPCC)Plan prepared for Pape by Bergeson-Boese& <br /> Associates,dated June 29,2007. <br /> W:\Clients\Pape Group\007148-Pape Trucks\01 French Camp Kenworth\2008\2008 HMBP\Pape format(paper)\TABs.doc <br />