Laserfiche WebLink
When you are doing a project please take enough time to do it right the first time.We do <br /> not have time to try it the second time.Especially in the winter. <br /> Some of the changes that will be made are: <br /> 1. We will not turn windrows any less than two days before a rain/storm. <br /> 2. Windrows will be cleaned up as soon as the turn is done preferably as we are <br /> turning. <br /> 3. Any grading that needs to be done will be done as soon as possible. <br /> 4. All drain area's will be kept open and trash or compost material will be kept out of <br /> the area. <br /> 5. Windrow's will not turned any sooner than two days after a rain/storm. <br /> 6. Truck traffic in the compost area will monitored and direction given as needed to <br /> keep the area as straight as possible. This has been a challenge in the past but can <br /> be ddne.Remember this site is yours not the truck driver,if you have a problem let <br /> myself or Mark Lance know as soon as you can. This will insure that damage is <br /> ' kept to minimum. <br /> 7. When piles are put on the top tipping area they are to be at this location until the <br /> ground is stable enough for loaders to work and the product put in windrows as <br /> soon as possible. <br /> 8. I welcome any suggestions that you guys might have to make this work better. Both <br /> of you are doing a good job. Keep up the high standard of wort:that you are,and <br /> this will be a snap to accomplish. <br /> 2 <br />