Laserfiche WebLink
• 0 <br /> • Key to maintaining effective compost and generation of odors are monitoring; <br /> Temperature daily (43-71 °C or 110-160 °F) <br /> Moisture content between 45 and 55% <br /> • Material aerated by turning piles regularly <br /> FINISHED PRODUCT <br /> • 3-4 months to produce stabilized mat'l. Moisture 40-50%. <br /> • Scotts will take sample end products to meet State performance stds. <br /> EXISTING UTILITIES <br /> • Have existing well on parcel (2 on property) for process water and fire protection. <br /> • Bottled water for potable uses. <br /> • Sanitary facilities currently available. <br /> • Wells and leachfields shown on plans. <br /> • Existing administrative offices will be used. <br /> • Currently outdoor lighting around office area and warehouse. Security deterrent. <br /> • Existing scale used until quantities necessitate additional scale. <br /> • Using same access onto property. <br /> SITE IMPROVEMENTS <br /> TRAFFIC FLOW AND RECEIVING AREA <br /> • After entering property, separate access road for composting operations. <br /> Paved to receiving area to minimize dust. <br /> Efficient on-site traffic flow <br /> • For max. capacity, estimate 65 trucks per week (12/day). Inititally 3-4 trucks daily. <br /> Can combine trucks with bagging plant. <br />