Laserfiche WebLink
i • <br /> • Receiving area also paved, loads checked. <br /> • Sufficient area between windrows and around composting pad for access and fire <br /> safety. <br /> GRADING/STORMWATER <br /> • Existing grades essentially being utilized. <br /> Keep existing drainage patterns <br /> Only an acre or two affected. <br /> • Storm water control through swales and holding pond for increased flow <br /> Worked with public works, flood conservation, and planning to develop <br /> acceptable plan. <br /> Contacted RWQCB about project, and received waste discharge exemption. <br /> Filing NOI and preparing SWPPP and monitoring plan. <br /> HEALTH & SAFETY <br /> • Supervision on-site at all times. <br /> • Emergency contact list posted at all times. <br /> • Personnel at facility will be trained i <br /> - Load check procedures <br /> - Spill response <br /> - First Aid <br /> - Safe equipment operations and maintenance procedures <br /> - Safety eq. available (fire extinguishers, first aid kits, eye and ear protection, <br /> hard hards, and back-up alarms on equipment). <br /> - Fire Response <br /> - Federal, state and local regulations. <br /> • Security measures will consist of: <br /> - perimeter fence and gate <br /> - lighting towards center of plant <br /> - warning signs for trespassers. <br /> - Emergency contact lists. <br />