My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
ACKERMAN
>
1725
>
2300 - Underground Storage Tank Program
>
PR0231309
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2020 4:29:03 PM
Creation date
10/8/2020 7:37:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231309
PE
2361
FACILITY_ID
FA0003756
FACILITY_NAME
KISHIDA, GEORGE INC
STREET_NUMBER
1725
STREET_NAME
ACKERMAN
STREET_TYPE
DR
City
LODI
Zip
95240
APN
06219001
CURRENT_STATUS
01
SITE_LOCATION
1725 ACKERMAN DR
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. SECONDARY PII'E TESTING <br /> Company Name: B.Z. Service Station Maintenance <br /> Company Address: 1041 Triangle Ct.,West Sacramento,CA 95605 <br /> Credentials: ® CSLB Licensed Contractor ❑ SWRCB Licensed Tank Tester <br /> License Type: ICC License Number: 433159 <br /> Test Equipment Used: PRESSURE GAUGE Equipment Resolution: 0.5 PSI <br /> Piping Run#DSL-1 Piping Run#DSL-2 Piping Run# Piping Run# <br /> Piping Material: FBG FBG <br /> Piping Manufacturer: UNK UNK <br /> Piping Diameter: 3" 3" <br /> Length of Piping Run: 20' 20' <br /> Product Stored: DSL DSL <br /> Method and location of BOOT BOOT <br /> pipin -run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 5 MIN 5 MIN <br /> starting test: <br /> Test Start Time: 10:30 10:30 <br /> Initial Reading(Rj): 5 PSI 5 PSI PSI PSI <br /> Test End Time: 11:30 11:30 <br /> Final Reading(RF): 5 PSI 5 PSI PSI PSI <br /> Test Duration: 1 HR I HR 1 HR 1 HR <br /> Change in Reading(RF-Ri): 0 0 <br /> Pass/Fail Threshold or 0 0 0 0 <br /> Criteria: <br /> Test Result: ®Pass ❑ Fail N Pass ❑ Fail ❑ Pass ❑ Fail J. ❑ Pass ❑Fail <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> Secondary Containment Test Results 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.