Laserfiche WebLink
PRESSURE SENSOR AND <br />ASSOCIATED EQUIPMENT ONLY <br />REQUIRED AT DISPENSER #5 <br />WITr <br />BRASS Bi <br />1/4"1 <br />FI' <br />STP POh <br />PRODUCT <br />IDUIT <br />VACUUM PIPING <br />1/4" BRASS BARB <br />FITTING BY GC <br />VACUUM ZONES 4,5 AND 6 <br />DD AT TANK #DPREMIUM UNLEADED <br />2 3/4"_i._O" <br />WITH 1-1 <br />BRASS BUSH <br />1/4" BRA <br />FITTIN <br />STP POWER <br />PRODUCT PIPIT <br />$T-LL' <br />NO ADDITIONAL SHUT OFF VALVES SHOULD BE <br />D BETWEEN THE MONITORED INTERSTITIAL SPACE <br />HE RESPECTIVE SENSORS, <br />WITH 1-1/2" X 1/4" <br />BRASS BUSHING AND <br />1/4" BRASS BARB <br />FITTING BY GC <br />STP POWER CONDUIT <br />PRODUCT PIPINGP <br />:UUM PIPING <br />GENERAL NOTES <br />1 ALL VACUUM TUBING MUST BE VEEDER ROOT <br />APPROVED VACUUM TUBING. <br />2 AN EXTERNAL SIPHON CHECK VALVE (VEEDER <br />ROOT #3188-241-5) MUST BE USED WHEN MAKING <br />A VACUUM SOURCE CONNECTION BETWEEN <br />SVCS SYSTEM SENSORS AND THE SIPHON PORT <br />CARTRIDGE FOR ALL TURBINES. <br />3 ALL PENETRATIONS THROUGH TANK SUMPS, <br />UDC SUMPS AND VENT SUMPS TO BE MADE BY A <br />QUALIFIED CONTRACTOR. <br />4 ALLCONTAINMENT SUMPS TO BE INSTALLED <br />PER THE MANUFACTURER'S INSTALLATION <br />INSTRUCTIONS. <br />5 ALL CONDUIT PENETRATIONS AND J -BOXES TO <br />BE INSTALLED ABOVE FUEL LINE PENETRATIONS. <br />6 CONTRACTOR SHALL POSITION LIQUID ONLY <br />SUMP SENSORS AT SUMP LOW POINT ON SIDE <br />CLOSEST TO PRODUCT PIPING. <br />VACUUM ZONES 7,8 AND 9 <br />AT TANK #3 DIESEL <br />3 3/4.,_1._0„ <br />JUM KIT <br />SENSOR CONDUIT <br />1 4 VACUUM PIPING <br />ONLYSENSOR <br />BI <br />1/4" BRASS BARB <br />FITTING BY GC <br />1/4" BRASS BAR6-_ <br />FITTING BY GC <br />VACUUM ZONES 1,2 AND 3 <br />DD AT TANK #DREGULAR UNLEADED) <br />SOR CONDUIT <br />IR <br />CONDUIT <br />IR <br />I Proto 11-05-18 1 <br />th <br />O <br />n <br />N <br />5N <br />Z (D <br />3rn j W <br />Z <br />Z � OU H � <br />W ¢ Z 0) 0 Z <br />W Of >Z� 'off O <br />W Jam° o z <br />r W UJ -y w 0 <br />~ Y I LU <br />a > <br />2 <br />O <br />N <br />M <br />35558 <br />G12.2 <br />FUELING - USA <br />WRAP RUBBER SHIM FROM KIT DISVENSER <br />1" BALL VALVE BY GC <br />AROUND SENSOR BEFORE <br />UNION AND 1" PIPE FITTINGS BY GC <br />INTO CLAMPNSING <br />POINTOPPER <br />TUBE <br />J -BOX AND CORD GRIPS BY GC <br />/4" VERTICALELEC <br />HORIZONTAL I <br />j <br />SEAL OFF BV GC <br />BALL VALVE <br />tCONDUIT <br />TO TLS CONSOLE <br />FLOW METER AND PRESSURE SENSOR <br />WIRING CAN SHARE THE SAME CONDUIT <br />TO CONSOLE (OBSERVE POLARITY) <br />STAINLESS STEEL FLEX CONNECTOR <br />^ <br />2" BLACK IRON PIPE <br />e <br />AND FITTI NGSBY GC <br />9 <br />UDC <br />FRP VAPOR RETURN LINE <br />PIPING AND FITTINGS <br />VEEDER ROOT <br />VACUUM TUBING <br />VENT BOX VACUUM <br />VAPOR FLOW <br />METER <br />SENSORDETAIL4 <br />DISAGRAM AT <br />DISPENSERS <br />5 <br />WITr <br />BRASS Bi <br />1/4"1 <br />FI' <br />STP POh <br />PRODUCT <br />IDUIT <br />VACUUM PIPING <br />1/4" BRASS BARB <br />FITTING BY GC <br />VACUUM ZONES 4,5 AND 6 <br />DD AT TANK #DPREMIUM UNLEADED <br />2 3/4"_i._O" <br />WITH 1-1 <br />BRASS BUSH <br />1/4" BRA <br />FITTIN <br />STP POWER <br />PRODUCT PIPIT <br />$T-LL' <br />NO ADDITIONAL SHUT OFF VALVES SHOULD BE <br />D BETWEEN THE MONITORED INTERSTITIAL SPACE <br />HE RESPECTIVE SENSORS, <br />WITH 1-1/2" X 1/4" <br />BRASS BUSHING AND <br />1/4" BRASS BARB <br />FITTING BY GC <br />STP POWER CONDUIT <br />PRODUCT PIPINGP <br />:UUM PIPING <br />GENERAL NOTES <br />1 ALL VACUUM TUBING MUST BE VEEDER ROOT <br />APPROVED VACUUM TUBING. <br />2 AN EXTERNAL SIPHON CHECK VALVE (VEEDER <br />ROOT #3188-241-5) MUST BE USED WHEN MAKING <br />A VACUUM SOURCE CONNECTION BETWEEN <br />SVCS SYSTEM SENSORS AND THE SIPHON PORT <br />CARTRIDGE FOR ALL TURBINES. <br />3 ALL PENETRATIONS THROUGH TANK SUMPS, <br />UDC SUMPS AND VENT SUMPS TO BE MADE BY A <br />QUALIFIED CONTRACTOR. <br />4 ALLCONTAINMENT SUMPS TO BE INSTALLED <br />PER THE MANUFACTURER'S INSTALLATION <br />INSTRUCTIONS. <br />5 ALL CONDUIT PENETRATIONS AND J -BOXES TO <br />BE INSTALLED ABOVE FUEL LINE PENETRATIONS. <br />6 CONTRACTOR SHALL POSITION LIQUID ONLY <br />SUMP SENSORS AT SUMP LOW POINT ON SIDE <br />CLOSEST TO PRODUCT PIPING. <br />VACUUM ZONES 7,8 AND 9 <br />AT TANK #3 DIESEL <br />3 3/4.,_1._0„ <br />JUM KIT <br />SENSOR CONDUIT <br />1 4 VACUUM PIPING <br />ONLYSENSOR <br />BI <br />1/4" BRASS BARB <br />FITTING BY GC <br />1/4" BRASS BAR6-_ <br />FITTING BY GC <br />VACUUM ZONES 1,2 AND 3 <br />DD AT TANK #DREGULAR UNLEADED) <br />SOR CONDUIT <br />IR <br />CONDUIT <br />IR <br />I Proto 11-05-18 1 <br />th <br />O <br />n <br />N <br />5N <br />Z (D <br />3rn j W <br />Z <br />Z � OU H � <br />W ¢ Z 0) 0 Z <br />W Of >Z� 'off O <br />W Jam° o z <br />r W UJ -y w 0 <br />~ Y I LU <br />a > <br />2 <br />O <br />N <br />M <br />35558 <br />G12.2 <br />FUELING - USA <br />