My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
1829
>
2300 - Underground Storage Tank Program
>
PR0546066
>
INSTALL_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2022 2:27:27 PM
Creation date
10/12/2020 8:08:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2020
RECORD_ID
PR0546066
PE
2351
FACILITY_ID
FA0026050
FACILITY_NAME
7 ELEVEN STORE #41187
STREET_NUMBER
1829
Direction
N
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
CURRENT_STATUS
03
SITE_LOCATION
1829 N WILSON WAY
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
197
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 3 - Material and Construction 3 .06 Adhesives - Adhesives shall be manufacturer' s <br /> 3 . 01 2" -4" Primary & 3 '" -6 " Secondary Pipe - The pipe standard for the piping system specified , <br /> shall be manufactured by the filament winding process using <br /> an amine cured epoxy thermosetting resin to Impregnate 3 .07 Acceptable Products - RED THREAD IIA Piping <br /> strands of continuous glass filaments , which are wound System as manufactured by NOV Fiber Glass Systems or <br /> around a mandrel at a 543/4 " winding angle under controlled engineered approved equal , <br /> tension . The pipe shall be heat cured and the cure shall be <br /> confirmed using a Differential Scanning Calorimeter. <br /> SECTION 4 - Installation and Testing <br /> Pipe shall be supplied with T. A , B . (Threaded and Bonded) or <br /> plain ends , 4 . 01 Training and Certiflcaticn - All joints Installed or <br /> constructed In the field shall be assembled by employees <br /> Pipe shall have a minimum continuous cyclic pressure of the contractor who have been trained by the pipe <br /> rating of 125 psig at 150°F In accordance with ASTM D2992 , manufacturer, The pipe manufacturer or their authorized <br /> Procedure A or UL 971 pressure rating . representative , shall train the contractor ' s employees in the <br /> All pipe , both primary and secondary, shall be 100 % proper joining and assembling procedures required for the <br /> hydrotested at the factory before shipment at a minimum project , including hands-on participation by the contractor's <br /> pressure of 265 psig and shall be UL 971 -2004 Listed and employees , Each bonder shall fabricate one pipe-to- pipe <br /> Labeled , and one pipe- to -fitting joint that shall pass the minimum <br /> pressure test for the application as stated in Section 2 . 03 <br /> 3 . 02 ASTM D2310 Classifications (at 73 . 40F) without leaking , <br /> Primary Pipe Secondary Pipe Only bonders that have successfully completed the <br /> pressure test shall bond pipe and fittings , Each bonder shall <br /> 2 " - 3" RTRP- 1 1 AF 3" RTRP- 11 AF carry a current , manufacturer proof of training card . <br /> 4" RTRP- 1 1 AH 4 ); - &' RTRP- 11 AH <br /> ( Mechanical properties cell classifications shown are 4 . 02 Pipe installation - Pipe shall be Installed as specified <br /> minimums . ) and Indicated on the drawings , <br /> The piping system shall be installed In accordance with <br /> 3 . 03 Fittings - All fittings shall be manufactured using the manufacturer ' s current published installation procedures , <br /> the same type of material as the pipe . Fittings may be <br /> manufactured either by compression molding , filament <br /> winding , resin transfer molding or contact molding methods . 4 . 03 Testing - A hydrostatic pressure test shall be <br /> All fittings , adapter, and sump penetrations shall be UL971 - conducted on the completed piping system . The piping <br /> 2004 Listed . system shall be subjected to 10 pressurization cycles from 0 <br /> psig to 1 . 5 times the design operating pressure as stated in <br /> Primary fittings shall be adhesive bonded , matched Section 2 . 03 . c . After the 10 cycles , the pressure shall be held <br /> tapered bell and spigot and rated the same as the pipe , on the system for a minimum of 1 hour and the line inspected <br /> Secondary containment fittings shall be two -piece style for leaks . <br /> to allow for 100% Inspection of the primary joint pressure test Test pressures shall not exceed 1 . 5 times the maximum <br /> and be rated to a minimurn of 50 psig per UL 971 -2004 . rated pressure of the lowest rated element in the system . <br /> Should hydrostatic testing be Impractical , testing with <br /> low pressure air or Inert gas may be acceptable . Extreme All pipe joints shall be water tight . All joints that are found <br /> caution should be used when testing with air, Follow all to leak , by observation or during testing shall be replaced by <br /> safety precautions and testing recommendations of the pipe the contractor and retested , <br /> manufacturer. <br /> Should hydrostatic testing be Impractical , testing with <br /> 3 . 04 Connections - Connections to flex connectors or low pressure air or Inert gas may be acceptable . Extreme <br /> other piping materials shall be made by the use of NPT caution should be used when testing with air. Follow all <br /> (National Pipe Thread) threaded adapters or flanges bonded safety precautions and testing recommendations of the pipe <br /> to the FRP piping system . manufacturer, <br /> 3 . 05 Sump Penetrations - Sump penetrations shall be <br /> made by means of a permanently bonded FRP coupling . The <br /> coupling shall be capable of adjusting for the slope of the <br /> piping system entering or exiting the sump wall . <br />
The URL can be used to link to this page
Your browser does not support the video tag.