Laserfiche WebLink
�11111 11 HIM A <br /> 3 . 07 Acceptable Products - RED THREAD IIA Piping Secondary Containment Piping <br /> System as manufactured by NOV Fiber Glass Systems or <br /> engineered approved equal . SECTION 1 - Scope <br /> This section covers the use of fiberglass reinforced plastic <br /> SECTION 4 - Installation and Testing (FRP) pipe for fuel handling and fuel handling vent and vapor <br /> 4 . 01 Training and Certification - All Joints Installed or applications Including gasoline , unleaded gasoline , gasoline/ <br /> constructed in the field shall be assembled by employees alcohol mixtures , bio-diesel and diesel that require secondary <br /> of the contractor who have been trained by the pipe containment . <br /> manufacturer, The pipe manufacturer or their authorized <br /> representative shall train the contractor's employees in the SECTION 2 - General Conditions <br /> proper Joining and assembling procedures required for the <br /> protect , Including hands-on participation by the contractor's 2 .01 Coordination - Material furnished and work <br /> Each bonder shall fabricate one pipe-to -pipe performed under this section shall be coordinated with the <br /> employees . <br /> and one pip Each <br /> Joint that shall pass the minimum related work and equipment specified under other sections, <br /> pressure test for the application as stated in Section 2 , 03 i . e , Valves , Flexible Connectors , Equipment , <br /> without leaking . <br /> Only bonders that have successfully completed the 2 . 02 Governing Standards - Except as modified or <br /> pressure test shall bond pipe and fittings . Each bonder shall supplemented herein , all materials and construction methods <br /> carry a current manufacturer ' s proof of training card , shall comply with and be tested In accordance with the <br /> 4 . 02 Pipe Installation - Pipe shall be Installed as specified following standards and test methods : <br /> and Indicated on the drawings . <br /> The piping system shall be Installed In accordance with the Standards and Test Methods : <br /> manufacturer ' s current published installation procedures . UL971 Standard for Nonmetallic Underground Piping for Flam- <br /> 4 .03 Testing - A hydrostatic pressure test shall be 2004 mable Liquids <br /> conducted on the completed piping system . The piping <br /> system shall be subjected to 10 pressurization cycles from 0 ASTM Standard Classification for Machine-Made " Fiberglass" <br /> psig to 1 . 5 times the design operating pressure as stated in D2310 (Glass Fiber Reinforced Thermosetting Resin ) Pipe <br /> Section 2 , 03 , c . After the 10 cycles, the pressure shall be held ASTM Standard practice for obtaining Hydrostatic or Pressure <br /> on the system for a minimum of 1 hour and the line Inspected D2992 Design Basis for " Fiberglass" ( Glass Fiber Reinforced <br /> for leaks . I Thermosetting Resin ) Pipe and Fittings <br /> Test pressures shall not exceed 1 , 6 times the maximum <br /> rated pressure of the lowest rated element in the system . 2 . 03 Operating Conditions - In addition to the above <br /> All pipe Joints shall be water tight , All Joints that are found listed minimum design requirements , the system shall meet <br /> to leak, by observation or during testing , shall be replaced by the following minimum operating conditions : <br /> the contractor and retested . a . Operating Pressure <br /> Should hydrostatic testing be impractical , testing with b . Fluid Conveyed <br /> low pressure air or Inert gas may be acceptable , Extreme c , Test Pressure <br /> caution should be used when testing with air. Follow all <br /> safety precautions and testing recommendations of the pipe 2 . 04 Quality Assurance - Pipe manufacturer' s quality <br /> manufacturer, program shall be in compliance with ISO 9001 and/or API Q1 . <br /> 2 . 05 Delivery. Storage , and Handling - Pipe and fittings <br /> shall be protected from damage due to impact and point <br /> loading , Pipe shall be properly supported to avoid damage <br /> due to flexural strain . The contractor shall not allow dirt , <br /> debris or other extraneous materials to get Into pipe and <br /> fittings . All factory machined areas shall be protected from <br /> sunlight until Installed . <br /> 2 . 06 Acceptable Manufacturers - NOV Fiber Glass <br /> Systems , 501 -568-4010 , or approved equal . <br />