Laserfiche WebLink
SWRCB,January 2002 Page of <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑Sump Manufacturer VI Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure ❑Vacuum 0 Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used:I NCON Equipment Resolution:0.002" <br /> Sump#Diesel Sump#91 Sump#$7 Sump# <br /> Sump Diameter: 42.00" 42.00" 42.00" <br /> Sump Depth: 54.00" 54.00" 54.00" <br /> Sump Material: Fiberglass Fiberglass Fiberglass <br /> Height from Tank Top to Top of 12.50" 12.50" 12.50" <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 8.00" 8.00" 8.00" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Clean Clean Clean <br /> Portion of Sump Tested' 17.00" 17.00" 17.00" <br /> Does turbine shut down when ❑Yes ❑No VINA <br /> sump sensor detects liquid(both Ll Yes ❑No VINA Ll Yes [I No SNA Ll Yes Ll No ❑NA <br /> product and water)?* <br /> Turbine shutdown response time N/A N/A N/A 'N/A <br /> Is system programmed for fail-safe ❑Yes ❑No VINA <br /> ❑Yes -1No v_NA Ll Yes []No NA Ll Yes ❑No ❑NA <br /> shutdown? <br /> Was fail-safe verified to be El Yes ❑No VINA Ll Yes ❑No VINA Ll Yes []No VINA Ll Yes Ll No Ll NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting 30 minutes 30 minutes 30 minutes <br /> test: <br /> Test Start Time: <br /> Initial Reading(RI): <br /> Test End Time: imease S e i co C SU S <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in Reading(RF-RI): <br /> Pass/Fail Threshold or Criteria: 0.002" 0.002" 0.002" <br /> Test Result: 0 Pass [I Fail E Pass ❑Fail 0 Pass ❑Fail ❑ Pass ❑Fail <br /> Was sensor removed for testing? C Yes []No ❑NA V]Yes 11 No 11 NA EYes []No [INA ❑Yes 11 No ❑NA <br /> Was sensor properly replaced and DYes ❑No ❑NA DYes 11 No 11 NA W]Yes ❑No ❑NA V]Yes 11 No ❑NA <br /> verified functional after testing? <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> ' If the entire depth of the sump is not tested,specify how much was tested. If the answer to gny of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />