Laserfiche WebLink
SWRCB,January 2002 Page of <br /> 7. UNDER-DISPENSER CONTAINMENT (UDC) TESTING <br /> Test Method Developed By: ❑UDC Manufacturer E Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure ❑Vacuum E Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: Equipment Resolution:0.002° <br /> UDC#1/2 UDC#3/4 UDC#5/6 UDC#7/8 <br /> UDC Manufacturer: unknown unknown unknown unknown <br /> UDC Material: Fiberglass Fiberglass Fiberglass Fiberglass <br /> UDC Depth: 32.00" 32.00" 32.00" 32.00" <br /> Height from UDC Bottom to Top 8.00" 8.00" 8.00" 8.00" <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to 4.00" 4.00" 4.00" 4.00" <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to Clean Clean Clean Clean <br /> testing: <br /> Portion of UDC Tested' 14.00" 14.00" 14.00" 14.00" <br /> Does turbine shut down when ❑Yes ❑No E NA <br /> UDC sensor detects liquid(both []Yes []No ENA []Yes ❑No V]NA []Yes 11 No P1 NA <br /> product and water)?* <br /> Turbine shutdown response time N/A N/A N/A 'N A <br /> Is system programmed for fail- ❑Yes ❑No E NA []Yes ❑No ENA []Yes ❑No ENA ❑Yes ❑No E NA <br /> safe shutdown?" <br /> Was fail-safe verified to be ❑Yes Ll No ENA Ll Yes ❑No ONA []Yes ❑No k]NA Ll Yes Ll No ENA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and 30 minutes 30 minutes 30 minutes 30 minutes <br /> starting test <br /> Test Start Time: <br /> Initial Reading(Ri): <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in Reading(RF-RI): <br /> Pass/Fail Threshold or Criteria: 0.002" 0.002" 0.002" 0.002" <br /> Test Result: E Pass ❑Fail E Pass ❑Fail E Pass ❑Fail E Pass ❑Fail <br /> Was sensor removed for testing? EYes Ll No 11 NA EYes Ll No Ll NA V]Yes 11 No Ll NA k]Yes Ll No ❑NA <br /> Was sensor properly replaced and EYes ❑No ❑NA EYes 11 No 11 NA EYes ❑No [INA DYes ❑No [INA <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> ' If the entire depth of the UDC is not tested,specify how much was tested. If the answer to aM of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />