Laserfiche WebLink
URS <br /> Ms. Robert McClellon <br /> October 4,2004 <br /> Page 2 <br /> REVISED SCOPE OF WORK <br /> URS proposes to install the second set of two probes in the following manner. One boring will be <br /> installed 125 feet east of probe VW-4 along the northern boundary of the site and the second boring will <br /> be installed 125 feet west of probe VW-4. <br /> SCHEDULE <br /> We have tentatively scheduled our drilling contractor to install the probes on October 11,2004(Monday). <br /> If you should have any questions concerning this addendum to the work plan,please give me a call at <br /> (916)679-2081. <br /> Very truly yours, <br /> URS <br /> A? <br /> amine <br /> Civil Engineer <br /> cc: Judy McCampbell (RadioShack) <br />