My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013755
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAZELTON
>
1810
>
2600 - Land Use Program
>
PA-2000052
>
SU0013755
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2020 1:55:52 PM
Creation date
11/23/2020 1:54:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013755
PE
2685
FACILITY_NAME
PA-2000052
STREET_NUMBER
1810
Direction
E
STREET_NAME
HAZELTON
STREET_TYPE
AVE
City
STOCKTON
Zip
95205-
APN
15518002
ENTERED_DATE
11/12/2020 12:00:00 AM
SITE_LOCATION
1810 E Hazelton AVE
RECEIVED_DATE
11/12/2020 12:00:00 AM
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sshih
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
requirements in this Chapter. No public hearingis s required. A fee, as specified by resolution of <br /> the Board of Supervisors, shall be required. All of the following minimum requirements shall be <br /> met when filing an application for an ADU Permit: <br /> (a) Existing Residence. There shall be no more than one (1) existing single-family dwelling <br /> on the property. <br /> (b) Owner Occupancy—JADUs Only. The owner of the property shall occupy either the <br /> existing single-family dwellingoproposed JADU for a period exceedingnty(90) <br /> days per year. <br /> (c) Number of Units. There shall be no more than one (1) ADU and one (1) JADU per lot in <br /> the R-R, R-VL, and R-L Residential zones and in the AG, AL, and AU Agricultural <br /> zones. <br /> 9-832.5 REVIEW PROCEDURE. <br /> ADU applications shall be reviewed ministerially y the Director using the Staff Review <br /> Procedure in Chapter 9-210. <br /> (a) The Director shall act on an ADU Permit application within 60 calendar days from the <br /> date the County receives a complete application provided there is an existing single- <br /> family or multifamily dwelling on the lot. <br /> (b) If the permit application to create an ADU or a JADU is submitted with a permit <br /> application to create a new single-family dwelling on the lot, the County may delay <br /> acting on the permit application for the ADU until it acts on the permit application to <br /> create the new single-family dwelling, but the ADU Permit application shall still be <br /> considered ministerially without discretionary review or a public hearing. <br /> (c) If the applicant requests a delay, the 60-day time period shall be tolled for the period of <br /> the delay. <br /> (d) If the local agency has not acted upon the complete application within 60 days, the <br /> application shall be deemed approved. <br /> 9-832.6 DEVELOPMENT STANDARDS, <br /> All ADU Permits and building permit for ADUs approved under the provisions of this Chapter <br /> are subject to the followingdevelopment standards. <br /> (a) Size of Unit. The ADU shall conform to the following requirements: <br /> (1) Except as provided in Subsection(a)(2),the ADU shall not exceed one thousand two <br /> hundred(1,200) square feet of floor area and have no more than two bedrooms. <br />
The URL can be used to link to this page
Your browser does not support the video tag.