Laserfiche WebLink
Potentially Signess T with Less Than Analyzed <br /> Significant Mitigation Significant No In The <br /> Impact. Incorporated Impact. Impact Prior EIR <br /> X. -HYDROLOGY AND WATER QUALITY. <br /> Would the project: <br /> a) Violate any water quality standards or waste <br /> discharge requirements or otherwise substantially <br /> degrade surface .or ground water quality? ' <br /> b) Substantially decrease groundwater supplies or = <br /> interfere substantially with groundwater recharge <br /> such that the project may impede sustainable a <br /> groundwater management of the basin ? <br /> c) Substantially alter the existing drainage pattern of <br /> the site or area, including through the alteration of <br /> the course of a stream or river or through .the <br /> addition of impervious surfaces , in a manner which <br /> would: <br /> i) result in substantial erosion or siltation on- or off- <br /> site ; <br /> ii) substantially increase the rate or amount of <br /> surface runoff in a manner which would result .in <br /> flooding on- or off-site ; <br /> iii) create or contribute runoff water which would <br /> exceed the capacity of existing or planned <br /> stormwater drainage systems or provide <br /> substantial additional sources of polluted runoff; L <br /> or <br /> iv) impede or redirect flood flows? <br /> n <br /> u X 2 El <br /> d)- In :flood hazard , tsunami, or seiche zones , risk <br /> release of pollutants due to project inundation ? <br /> e) Conflict with. or obstruct implementation of a water <br /> quality control plan, or sustainable groundwater � � X�_ <br /> management plan ? <br /> Impact Discussion : <br /> a-b) The proposed project consists of a Zone Reclassification and a Minor Subdivision. For any future development of the <br /> project site, water and sewage disposal will be developed under the approval of the Environmental Health Department <br /> and will have to meet the County's standards . Therefore, the project is expected to have a less than significant impact <br /> on hydrology and water quality and supplies . <br /> c) The proposed project consists of a Zone Reclassification and- a Minor Subdivision . For any future development of the <br /> project site , any necessary drainage improvements will be required as conditions of the construction and grading will <br /> be performed under permit from the Building Department. Therefore , the project is expected to have a less than <br /> significant impact on drainage . <br /> d) According to the FEMA Flood Risk Map , the Project site is located within Zone X, which is defined by the Federal <br /> Emergency Management Agency as located outside of the 100-year and 500-year flood plains . Therefore , no impacts <br /> associated with flooding , tsunamis , or seiches would occur. <br /> PA-20001 .07 (ZR) and PA-2000109 ( MS_)— Initial Study 17 <br />