P.q <br /> DUNHAM Mi <br /> DIVISION 15000 - MECHANICAL SECTION 15009 DEMOLITION INSTRUCTIONS. ALL AIR CONDITIONING EQUIPMENT MUST BE TRAPPED IN AUTOMATIC CONTROLS (ROOF TOP HEAT PUMP UNIT HP-1) Dunham Associates of Minnesota, Inc. <br /> 1. THIS CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATION OF THE DIVISION 15400 - PLUMBING ACCORDANCE WITH MANUFACTURERS DATA. 50 South Sixth Street/Suite 1100 <br /> SECTION 15001 - BASIC MECHANICAL REQUIREMENTS DEMOLITION OF EXISTING WORK AND THE DEMOLITION PROVIDED BY THE B. METAL DUCTWORK - NO FIBERGLASS DUCT ALLOWED A. SEQUENCE OF OPERATION: ROOFTOP UNIT HEAT PUMP UNIT: Minneapolis,Minnesota 55402-1540 <br /> A. GENERAL CONDITIONS GENERAL CONTRACTOR. COORDINATE WITH THE GENERAL CONTRACTOR ANY SECTION 15401 - SUMMARY OF WORK 1. EXCEPT AS OTHERWISE INDICATED, FABRICATE AND INSTALL RECTANGULAR 1. COOLING CYCLE - OCCUPIED HOURS: UPON A RISE IN SPACE <br /> 1. DRAWINGS AND GENERAL PROVISIONS OF CONTRACT, INCLUDING GENERAL EXISTING EQUIPMENT REQUIRED TO BE LEFT INTACT. A. THIS CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, EQUIPMENT, ETC. AND ROUND DUCTWORK WITH GALVANIZED STEEL, IN ACCORDANCE WITH PHONE durha 5.7550 FAx 612.465.7551 <br /> AND SUPPLEMENTARY CONDITIONS AND ALL OTHER SPECIFICATION SECTIONS, 2. EACH CONTRACTOR SHALL VERIFY SCOPE OF WORK WITH THE GENERAL NECESSARY FOR, REASONABLY IMPLIED AND INCIDENTAL TO, THE FURNISHING, SMACNA "HVAC DUCT CONSTRUCTION STANDARDS" OF THE LATEST EDITION. TEMPERATURE ABOVE THE OCCUPIED COOLING LCYCSETPOINT A THE wee ducal +eng.eom <br /> THERMOSTAT, THE REFRIGERATION SYSTEM SHALL CYCLE AS <br /> APPLY TO THIS AND THE OTHER SECTIONS OF DIVISION 15000. CONTRACTOR FOR THE REMOVAL OF ALL EXISTING FIRE PROTECTION, INSTALLATION, COMPLETION AND TESTING OF ALL THE WORK FOR THE PLUMBING 2. INSTALL TURNING VANES IN ALL RIGHT ANGLE ELBOWS IN ALL DUCTS. mechanical +electrical consulting engineering <br /> 2. THE CONTRACTOR FOR THIS DIVISION OF WORK IS REQUIRED TO READ THE PLUMBING FIXTURES, PIPING, HVAC UNITS, REFRIGERANT RECAPTURE, SYSTEMS AS CALLED FOR IN THE SPECIFICATIONS, SHOWN ON DRAWINGS AND 3. INSTALL RIGID ROUND AND RECTANGULAR METAL DUCT WITH SUPPORT REQUIRED TO MAINTAIN SPACE TEMPERATURE AT THE THERMOSTAT <br /> SETPOINT. <br /> SPECIFICATIONS AND REVIEW DRAWINGS FOR ALL DIVISIONS OF WORK AND EXHAUST FANS, ETC. AND ASSOCIATED ROOF CURBS NOT BEING REUSED ON AS REQUIRED BY JOB CONDITIONS, TO INCLUDE, BUT NOT BE LIMITED TO THE SYSTEMS INDICATED IN SMACNA STANDARDS. PROVIDE SWAY AND SEISMIC THE SUPPLY FAN SHALL OPERATE CONTINUOUSLY AND PROJECT NO 0421 3-001 <br /> THEOUTDOOR AIR DAMPER SHALL BE OPEN TO THE MINIMUM <br /> IS RESPONSIBLE FOR THE COORDINATION OF THEIR WORK AND THE WORK THIS PROJECT, UNLESS SPECIFICALLY NOTED OTHERWISE. CONTRACTOR MUST FOLLOWING: BRACING AS REQUIRED BY STATE AND LOCAL CODES OR BY LANDLORD. THE <br /> OF THEIR SUBCONTRACTORS WITH ALL DIVISIONS OF WORK. IT IS THIS VERIFY WITH THE LANDLORD ALL PRESUMED ABANDONED EQUIPMENT, PIPES, 1. CONTRACTOR SHALL DETERMINE THE LOCATION OF EXISTING WATER 4. ALL JOINTS AND SEAMS SHALL BE SEALED WITH UNITED MCGILL DUCT POSITION CONTROLLED BY THE DCV SYSTEM. <br /> 2. HEATING CYCLE - OCCUPIED HOURS: UPON A DROP IN SPACE b Ll�, <br /> S <br /> CONTRACTORS RESPONSIBILITY TO PROVIDE THEIR SUBCONTRACTORS WITH A DUCTWORK AND EQUIPMENT PRIOR TO REMOVAL. ROOF CURBS SHALL BE SUPPLY AND DRAIN LINES AND MAKE PROPER CONNECTIONS THERETO <br /> I <br /> Q SEALER OR EQUAL. TEMPERATURE BELOW THE OCCUPIED HEATING SETPOINT OF THE PO� ON <br /> COMPLETE SET OF BID DOCUMENTS. REMOVED AND THE ROOF PATCHED. ALL EXTRANEOUS ITEMS IN THE SPACE INCLUDING VENTS. 4.A. ALL JOINTS, LONGITUDINAL AND TRANSVERSE SEAMS, AND DI qG, -'o M_t <br /> DN:THERMOSTAT, THE HEAT PUMP UNIT SHALL CYCLE AS REQUIRED TO , U=A01410000000 001168, <br /> 3. THIS CONTRACTOR IS RESPONSIBLE FOR SCHEDULING THE COMPLETION AND OR ON THE ROOF NOT APPLICABLE TO THE NEW WORK MUST BE REMOVED 2. ALL MATERIALS SHALL BE NEW AND SHALL FIT THE SPACE AVAILABLE. CONNECTIONS IN DUCTWORK MUST BE SECURELY SEALED USING s <br /> MAINTAIN SPACE TEMPERATURE AT THE THERMOSTAT SETPOINT. z Wna111llated,C=us 2 2 <br /> INSPECTION OF THEIR WORK AND THE WORK OF THEIR SUBCONTRACTORS AND ROOF/WALL/FLOOR PATCHED/REPAIRED TO MATCH EXISTING VERIFY ALL DIMENSIONS AT THE SITE. WELDMENTS; MECHANICAL FASTENERS WITH SEALS, GASKETS, OR t:&0.08.1108:21:20-0e-00- <br /> THE SUPPLY FAN SHALL OPERATE CONTINUOUSLY AND THEevt3348i <br /> TO COMPLY WITH THE SCHEDULE AND THE PROJECT COMPLETION DATE. STRUCTURE. EXISTING ABANDONED PIPES, DUCTS, OR EQUIPMENT IN THE 3. ALL VALVES, CLEANOUTS, ETC. SHALL BE SO LOCATED AND INSTALLED MASTICS; MESH AND MASTIC SEALING SYSTEMS; OR TAPES. TAPES AND Ln L1 m z <br /> 4. THIS CONTRACTOR SHALL VISIT THE SITE PRIOR TO SUBMITTAL OF BID TO FLOOR, EMBEDDED IN CONCRETE, OR OTHERWISE INACCESSIBLE ARE TO BE TO PERMIT ACCESS FOR SERVICE WITHOUT DAMAGE TO BUILDING OR MASTICS MUST BE LISTED AND LABELED IN ACCORDANCE WITH UL OUTDOOR AIR DAMPER SHALL BE OPEN TO THE MINIMUM POSITION 3 x -4 M <br /> DETERMINE CONDITIONS AFFECTING THE WORK. ANY ITEMS WHICH ARE NOT FINISHED MATERIALS. <br /> CONTROLLED BY THE DCV SYSTEM. \D N r7 <br /> CUT OFF AND SEALED BELOW OR WITHIN FLOOR OR WALL LEVEL WHEN 181A OR UL 181 B. ALL LONGITUDINAL AND TRANSVERSE JOINTS, <br /> COVERED IN THE BID DOCUMENTS OR ANY PROPOSED SUBSTITUTIONS SHALL THEY ARE NOT TO BE REUSED IN THIS PROJECT. IF REQUIRED BY SEAMS AND CONNECTIONS OF SUPPLY AND RETURN DUCTS OPERATING 3. COOLING CYCLE - UNOCCUPIED HOURS: UPON A RISE IN SPACE * 2A Qy * <br /> BE LISTED SEPARATELY AND QUALIFIED IN THE CONTRACTORS BID. SECTION 15402 MATERIALS TEMPERATURE ABOVE THE UNOCCUPIED COOLING SETPOINT OF THE s� Fr,.,. <br /> SUBMITTAL OF BID SHALL SERVE AS EVIDENCE OF KNOWLEDGE OF EXISTING REMOVED TOPOINT OF ORIGIN. <br /> CONFIRM THE/EOXTENTCOFODEMOLITION WITH A. REFER TO PLANS FOR SCHEDULES OF EQUIPMENT AND FIXTURES. AMERICAN SECURELY FASTENED ANDSEALED WITH EWELDSTOGASKETS MASTICSBETHERMOSTATc,F CAULf 8/11/2020 <br /> , THE REFRIGERATION SYSTEM SHALL CYCLE AS <br /> CONDITIONS AND ANY MODIFICATIONS WHICH ARE REQUIRED TO MEET THE THE GENERAL CONTRACTOR AND TENANT PRIOR TO BID AND INCLUDE IN BID STANDARD, KOHLER AND CRANE ARE CONSIDERED ACCEPTABLE AS EQUALS. MASTIC-PLUS-EMBEDDED FABRIC SYSTEMS OR TAPES REQUIRED TO MAINTAIN SPACE TEMPERATURE AT THE THERMOSTAT <br /> INTENT OF THE DRAWINGS AND SPECIFICATIONS. FAILURE TO VISIT THE SITE ALL PLUMBING EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH THE (ADHESIVES), SETPOINT. THE SUPPLY FAN SHALL CYCLE AS REQUIRED AND THE <br /> PROPOSAL AS DIRECTED BY THE GENERAL CONTRACTOR AND TENANT. INSTALLED IN ACCORDANCE WITH MANUFACTURER'S INSTALLATION <br /> DOES NOT RELIEVE THE CONTRACTOR OF RESPONSIBILITY IN PERFORMANCE MANUFACTURER'S RECOMMENDATION. INSTRUCTIONS. OUTDOOR AIR DAMPER SHALL BE CLOSED. <br /> OF WORK. B. SANITARY PIPING 4. HEATING CYCLE - UNOCCUPIED HOURS: UPON A DROP IN SPACE <br /> SECTION 15010 - CUTTING AND PATCHING 4.B. MECHANICAL FASTENERS AND SEALS, MASTICS, OR GASKETS MUST BE <br /> 5. REFER TO RESPONSIBILITY SCHEDULE FOR INFORMATION IN REGARD TO 1. THE CONTRACTOR SHALL PERFORM ALL CUTTING AND PATCHING AS 1. CAST IRON PIPE (BELOW GRADE): ASTM A74 SERVICE WEIGHT, FITTINGS: TEMPERATURE BELOW THE UNOCCUPIED HEATING SETPOINT OF THE <br /> REQUIRED FOR THE INSTALLATION OF THE WORK UNDER THIS SPECIFICATION. CAST IRON, JOINTS: HUB-AND-SPIGOT, COMPRESSION TYPE WITH NEOPRENE DISTRIBUTION EQUIPMENT. <br /> RESPONSIBILITY OF WORK OR ITEMS WHICH MAY AFFECT BID. USED WHEN CONNECTING DUCTS TO FANS AND OTHER AIR THERMOSTAT, THE HEAT PUMP UNIT SHALL CYCLE AS REQUIRED TO <br /> NO CUTTING OF THE STRUCTURE SHALL BE PERMITTED WITHOUT WRITTEN GASKETS OR LEAD AND OAKUM. 5. ALL DUCTWORK SHALL BE INSTALLED WITH INSIDE CLEAR DIMENSIONS AS MAINTAIN SPACE TEMPERATURE AT THE THERMOSTAT SETPOINT. <br /> SECTION 15002 - GENERAL REQUIREMENTS APPROVAL OF THE LANDLORD AND ARCHITECT OR ENGINEER. 2. CAST IRON PIPE (ABOVE GRADE): CISPI 301, HUBLESS FITTINGS: CAST NOTED ON DRAWINGS. WHERE DUCTWORK SIZE IN LARGER THAN THE SUPPLY FAN SHALL CYCLE AS REQUIRED AND THE OUTDOOR <br /> 1. THIS CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, EQUIPMENT, 2. PATCHING SHALL BE OF THE SAME WORKMANSHIP, MATERIAL AND FINISH IRON, JOINTS: NEOPRENE GASKET AND STAINLESS STEEL CLAMP AND SHIELD CONNECTED DEVICE SMOOTH DUCT TRANSITIONS SHALL BE INSTALLED JUST AIR DAMPER SHALL BE CLOSED. <br /> SERVICES, TOOLS, TRANSPORTATION, INCIDENTALS AND DETAILS NECESSARY AND SHALL MATCH ACCURATELY ALL SURROUNDING CONSTRUCTION IN A ASSEMBLIES. PRIOR TO DEVICE CONNECTION. 5. ECONOMIZER CYCLE: WHEN, UPON A CALL FOR COOLING, THE <br /> TO PROVIDE A COMPLETE MECHANICAL SYSTEM AS SHOWN ON THE MANNER SATISFACTORY TO THE ARCHITECT AND TENANT'S PROJECT 3. ABS PIPE (BELOW GRADE): ASTM D2661, FITTINGS: ABS, JOINTS: SOLVENT C. FLEXIBLE COLLARS AT EQUIPMENT SHALL BE PROVIDED IN ALL CONNECTIONS OUTDOOR AIR ENTHALPY IS BELOW THE RETURN AIR ENTHALPY, la��� <br /> DRAWINGS, CALLED FOR IN THE SPECIFICATIONS, AND AS REQUIRED BY JOB MANAGER. WELD. BETWEEN VIBRATING EQUIPMENT AND DUCTS OR CASINGS. FLEXIBLE THE REFRIGERATION SYSTEM OPERATION SHALL BE CONTROLLED BY <br /> CONDITIONS. ALL WORK NOT SPECIFICALLY NOTED AS BEING BY THE 3. EXISTING UTILITIES, ETC. THAT ARE DAMAGED DURING THE CONSTRUCTION 4. PVC PIPE (BELOW GRADE): ASTM D2665, FITTINGS: PVC, JOINTS: SOLVENT CONNECTIONS SHALL CONSTRUCTED OF NEOPRENE-COATED FLAMEPROOF FABRIC. THE ECONOMIZER. THE ECONOMIZER SHALL MODULATE THE <br /> LANDLORD OR TENANT SHALL BE PROVIDED BY THE MECHANICAL PERIOD, WHETHER OR NOT DUE TO THE CONTRACTOR'S NEGLIGENCE SHALL OUTDOOR AIR AND RETURN AIR DAMPERS IN ORDER TO INTRODUCE MBA Architects Inc. <br /> WELD WITH SOLVENT CEMENT. PROVIDE ADEQUATE JOINT FLEXIBILITY TO ALLOW FOR MOVEMENT AND PREVENT � <br /> CONTRACTOR. CLOSELY COORDINATE THE ENTIRE INSTALLATION WITH THE BE REPAIRED OR REPLACED BY THE CONTRACTOR AND LEFT IN A5. COPPER TUBE (ABOVE GRADE): ASTM 888 TYPE "L", HARD TEMPER ONLY. THE TRANSMISSION OF VIBRATION. UP TO 100% OUTDOOR AIR TO SATISFY THE COOLING LOAD IN THE N5560 CTH ZM, SUITE 3 <br /> LANDLORD AND THE TENANT PROJECT MANAGER, AS REQUIRED. CONDITION SUITABLE TO THE LANDLORD AND TENANT'S PROJECT MANAGER. D. FLEXIBLE AIR DUCT AT AIR DEVICES SHALL BE MIN. R-5 INSULATED CLASS 1 SPACE. IF THE COOLING EFFECT OF THE OUTDOOR AIR IS NOT <br /> 2. DRAWINGS AND SPECIFICATIONS ARE TO BE CONSIDERED AS SUPPLEMENTING EXCEPT THESE MATERIALS SHALL NOT BE USED TO RECEIVE THE WASTES SUFFICIENT TO COOL THE SPACE, THE REFRIGERATION SYSTEM Onalaska, WI. 54650 <br /> EACH OTHER. WORK SPECIFIED BUT NOT SHOWN ON DRAWINGS, OR SHOWN FROM URINALS NOR WASTES FROM WATER CLOSETS IN BATTERY, FITTINGS: AND RATED FOR THE OPERATING PRESSURE OF THE SYSTEM. DUCT SHALL CYCLE AS REQUIRED TO SUPPLEMENT THE ECONOMIZER. <br /> ON DRAWINGS BUT NOT SPECIFIED, SHALL BE PERFORMED OR FURNISHED SECTION 15011 - SLEEVES CAST BRONZE, OR WROUGHT COPPER, JOINTS: SOLDER, GRADE 50B. CONSTRUCTION MATERIAL MUST ADHERE TO LOCAL CODES AND LANDLORD'S 608-'785-2.760 CELL: 507-458-8034 <br /> 1. THIS CONTRACTOR SHALL PROVIDE SLEEVES TO PROTECT EQUIPMENT OR REQUIREMENTS. 6. DEMAND CONTROL VENTILATION (DCV) CYCLE: DURING OCCUPIED <br /> AS THOUGH MENTIONED IN BOTH SPECIFICATIONS AND DRAWINGS. IF NOT FACILITIES IN THE INSTALLATION. EACH SLEEVE SHALL EXTEND THROUGH IT'S 6. VENT PIPING ABOVE FLOOR 2" OR SMALLER MAY BE GALVANIZED STEEL. E. PROVIDE MANUAL LOCKING QUADRANT VOLUME CONTROL DAMPERS WITH HANDLE HOURS THE OUTSIDE AIR SHALL BE CONTROLLED BY THE DCV E-mail: ("111Japm.t.im0gYnQIl.c01"n <br /> OTHERWISE DIRECTED, INSTALLATION OF ALL SYSTEMS AND EQUIPMENT 7. INSULATE ALL HORIZONTAL RUNS OF PIPING LOCATED IN CEILING SPACES <br /> RESPECTIVE FLOOR, WALL OR PARTITION AND SHALL BE CUT FLUSH WITH OPERATORS IN EACH BRANCH DUCT AND AS SHOWN ON PLANS TO FACILITATE SYSTEM. THE DCV SYSTEM SHALL MODULATE THE OUTSIDE AIR <br /> SHALL BE IN ACCORDANCE WITH APPLICABLE CODES AND IN ACCORDANCE EACH SURFACE EXCEPT SLEEVES THAT PENETRATE THE FLOOR, WHICH OF TENANTS IN SPACES BELOW, WHEN APPLICABLE. INSULATION TO BE AS AIR BALANCING. ALL RECTANGULAR DAMPERS IN OUTSIDE AIR, RELIEF AIR, OR DAMPER BETWEEN THE CLOSED POSITION AND THE MINIMUM <br /> WITH MANUFACTURER'S INSTALLATION INSTRUCTIONS. WHERE WORKSPECIFIED FOR WATER PIPING. <br /> SHALL EXTEND 2" ABOVE THE FLOOR. CONTRACTOR MUST COORDINATE RETURN AIR DUCTS ARE TO BE OF OPPOSED BLADE TYPE. OCCUPIED POSITION. IN THE EVENT THE ECONOMIZER CALLS FOR <br /> DESCRIBED IN THE SPECIFICATIONS IS IN CONFLICT WITH THE WORK SHOWN 8. INTERIOR CONDENSATE PIPING SHALL BE TYPE "L" HARD DRAWN COPPER <br /> THROUGH THE LANDLORD ANY CORE DRILLING OR CUTTING OF OPENINGS IN TUBE WITH 95-5 TIN-ANTIMONY SOLDERED JOINTS AND WROUGHT COPPER F. PROVIDE PRIMARY FIRE DAMPERS WHERE INDICATED OR REQUIRED BY CODES. OUTSIDE AIR IN EXCESS OF THAT BEING PROVIDED BY THE DCV <br /> ON THE DRAWINGS, THE CONTRACTOR SHALL SUPPLY THE GREATER MASONRY FLOORS OR WALLS. FIRE DAMPERS SHALL BE UL LABELED. FIRE DAMPERS SHALL HAVE THE SYSTEM THE ECONOMIZER SHALL OVERRIDE THE DCV SYSTEM. <br /> QUANTITY, QUALITY AND COST VIA THE BID AND CONTACT THE ENGINEER FITTINGS WITH DIELECTRIC SEPARATION BETWEEN DISSIMILAR METALS. <br /> FOR CLARIFICATION ON DIRECTION PRIOR TO INSTALLATION. 2. ALL SLEEVES AND OPENINGS THROUGH FIRE RATED WALLS AND/OR FLOORS EXTERIOR CONDENSATE PIPING MAY BE SCHEDULE 40 PVC PIPING WITH BLADES OUT OF THE AIRSTREAM ANDA 165 F FUSIBLE LINK, TYPE B, AS LOW LIMITING SETTING MUST BE IMPLEMENTED THE DCV SYSTEM <br /> SHALL BE FIRE SEALED WITH CALCIUM SILICATE, SILICONE "RTV' FOAM, "3M" MINIMUM. - DEMAND VENTILATION CONTROLS SHALL MAINTAIN CO2 <br /> 3. WHERE THE DRAWINGS OR SPECIFICATIONS CALL FOR ITEMS WHICH EXCEED SOLVENT WELDED FITTINGS IF APPROVED FOR USE BY THE LANDLORD. G. DUCTWORK INSULATION CONCENTRATIONS LESS THAN OR EQUAL TO 600 PPM PER <br /> CODES OR THE LANDLORD'S TENANT CRITERIA, THE CONTRACTOR IS FIRE RATED SEALANTS OR EQUAL, SO AS TO RETAIN THEIR FIRE RATING. C. POTABLE WATER PIPING 1. INSTALL INSULATION PRODUCTS IN ACCORDANCE WITH MANUFACTURER'S CALIFORNIA BUILDING ENERGY EFFICIENCY STANDARDS (CBEES CLIENT'S <br /> RESPONSIBLE FOR FURNISHING AND INSTALLING THE SYSTEM WITH THE 3. SLEEVES IN BEARING AND MASONRY WALLS, FLOORS, AND PARTITIONS SHALL 1. COPPER TUBING (BELOW GRADE): ASTM B88, TYPE "K" SOFT COPPER, WRITTEN INSTRUCTIONSAND IN ACCORDANCE WITH RECOGNIZED INDUSTRY STORE NUMBER SF-94 <br /> , <br /> MORE STRINGENT REQUIREMENTS AS DESIGNED AND DESCRIBED ON THESE BE STANDARD WEIGHT STEEL PIPE FINISHED WITH SMOOTH EDGES. FOR FITTINGS: CAST COPPER ALLOY OR WROUGHT COPPER AND BRONZE, SECTION 120.1(c)4C). <br /> OTHER THAN MASONRY PARTITIONS, THROUGH SUSPENDED CEILINGS, OR PRACTICES. INSULATION MUST COMPLY WITH NFPA 90A. <br /> DRAWINGS, UNLESS SPECIFICALLY NOTED OTHERWISE. FOR CONCEALED VERTICAL PIPING, SLEEVES SHALL BE NO. 22 U.S.G. JOINTS: BCUP SILVER BRAZE. 2. DUCT SIZES SHOWN ON DRAWINGS ARE INSIDE CLEAR DIMENSIONS. <br /> 4. ALL MECHANICAL WORK SHALL BE INSTALLED SO AS TO BE READILY GALVANIZED STEEL MINIMUM. 2. COPPER TUBING (ABOVE GRADE): ASTM B88, TYPE T' HARD DRAWN WITH 3. ALL JOINTS MUST BE TAPED SO THAT NO INSULATION FIBER IS VISIBLE. <br /> ACCESSIBLE FOR OPERATING, SERVICING, MAINTAINING, AND REPAIRING. SWEAT JOINTS, FITTINGS: CAST COPPER ALLOY OR WROUGHT COPPER AND EXTEND DUCTWORK INSULATION WITHOUT INTERRUPTION THROUGH WALLS, S EES CAN D I ES <br /> THIS CONTRACTOR IS RESPONSIBLE FOR PROVIDING ACCESS PANELS FOR BRONZE, JOINTS: BCUP SILVER BRAZE. FLOORS, AND SIMILAR PENETRATIONS. <br /> SECTION 15012 - HANGERS <br /> SUFFICIENT SERVICE ACCESS TO ALL EQUIPMENT. DPIPING OF DISSIMILAR METALS MUST BE DI-ELECTRICALLY SEPARATED <br /> 1. HANGERS SHALL INCLUDE ALL MISCELLANEOUS STEEL SUCH AS ANGLE IRON, E.D. , .COLD WATER AND INTERIOR CONDENSATE PIPING 4. ALL SUPPLY AND RETURN AIR DUCTWORK IN UNCONDITIONED/INDIRECTLY <br /> 5. ALL WORK SHALL BE PERFORMED IN A NEAT PROFESSIONAL MANNER USING EINSULATE ALL HOT WATER <br /> BANDS, C-CLAMPS WITH RETAINING CLIPS, CHANNELS, HANGER RODS, ETC., CONDITIONED SPACE (INCLUDING CONCEALED DIFFUSER BACKS) SHALL BE <br /> GOOD ENGINEERING AND CONSTRUCTION PRACTICES. WITH 1" THICK (K=0.23 @ 75 F) PIPE INSULATION WITH AN ALL SERVICE <br /> NECESSARY FOR THE INSTALLATION OF WORK. EXTERNALLY INSULATED WITH MINIMUM OF 2" THICK, 1 LB. DENSITY (R=8.0) <br /> 6. UNLESS SPECIFICALLY NOTED OTHERWISE, MATERIALS, PRODUCTS, AND JACKET TO MEET LOCAL CODES AND UL FLAME SPREAD AND SMOKE DEVELOPED <br /> 2. HANGERS SHALL BE FASTENED TO BUILDING STEEL, CONCRETE, OR DUCT WRAP WITH VAPOR BARRIER. VAPOR BARRIER IS TO BE MAINTAINED <br /> EQUIPMENT, INCLUDING ALL COMPONENTS THEREOF, SHALL BE NEW, RATINGS. OWENS-CORNING OR EQUAL. <br /> UNDERWRITERS LABORATORIES LISTED AND LABELED AND SIZED IN MASONRY, BUT NOT TO PIPING. HANGING FROM METAL DECK IS NOT THROUGHOUT DUCT SYSTEM. <br /> PERMITTED. HANGERS MUST BE ATTACHED TO UPPER CHORD OF BAR F. INSULATE THE TRAP, SANITARY AND SUPPLY PIPES UNDER LAVATORY WITH 1/2" 5. ALL SUPPLY AIR DUCTWORK IN DIRECTLY CONDITIONED SPACE: NONE <br /> CONFORMITY WITH REQUIREMENTS OF STATE AND LOCAL CODES, WHICHEVER JOIST. WHERE INTERFERENCES OCCUR, AND IN ORDER TO SUPPORT ARMSTRONG "ARMAFLEX" PIPING INSULATION OR TRUEBRO MODEL 102W WHITE REQUIRED. <br /> IS MORE STRINGENT. DUCTWORK OR PIPING, THE CONTRACTOR MUST INSTALL TRAPEZE TYPE "HANDI LAV GUARD" INSULATION KIT TO COMPLY WITH ADA REQUIREMENTS. f(�'� <br /> HANGERS OR SUPPORTS WHICH SHALL BE LOCATED WHERE THEY DO NOT G. INSTALL AIR CHAMBER SHOCK ABSORBERS IN BOTH HOT AND COLD LINES OF 6. RETURN DUCTS (WITHIN 3' T LINER: 1/2 INCH THICK.FIRST CHANGE IN DUCT DIRECTION) <br /> FLEXIBLE GLASS FIBER DUCT MANTECA CA 95336 <br /> SECTION 15003 - CODES <br /> INTERFERE WITH ACCESS TO FIRE DAMPERS, VALVES, AND OTHER PIPING SYSTEM TO PREVENT NOISE AND DAMAGE DUE TO WATER HAMMER. a <br /> 1. ALL WORK SHALL CONFORM TO THE LANDLORDS' CRITERIA, THE STATE'S, L. TESTING, ADJUSTING, AND BALANCING <br /> EQUIPMENT. HANGER TYPES AND INSTALLATION METHODS ARE ALSO SIOUX CHIEF 650 SERIES ALL STAINLESS STEEL, OR EQUAL. J.R. SMITH <br /> COUNTY'S, CITY'S AND LOCAL CODES AND ORDINANCES, SAFETY AND HEALTH 1. CONTRACTOR SHALL BALANCE, ADJUST & TEST EQUIPMENT TO PROVIDE <br /> SUBJECT TO LANDLORD CRITERIA. "HYDROTROLS", INSTALLED IN AN UPRIGHT POSITION. <br /> CODES, NEPA CODES, ENERGY CODES AND ALL OTHER APPLICABLE CODES DESIGN AIR QUANTITIES AND ASSURE PROPER OPERATION OF SYSTEMS. <br /> 3. HANGERS FOR ALL INSULATED PIPING SHALL BE SIZED AND INSTALLED FOR H. ALL BRANCH PIPING SYSTEM SHALL HAVE ACCESSIBLE SERVICE VALVE. PROVIDE <br /> AND REQUIREMENTS. THIS CONTRACTOR SHALL INQUIRE INTO AND COMPLY CONTRACTOR SHALL SUBMIT COPIES OF BALANCE/TEST REPORT TO OWNER <br /> WITH ALL APPLICABLE CODES, ORDINANCES, AND REGULATIONS. THIS THE OUTER DIAMETER OF INSULATION. INSTALL 6" LONG SPLIT CIRCLE SHUT OFF VALVES IN THE SUPPLY PIPING TO EVERY FIXTURE. PROVIDE ACCESS FOR REVIEW PRIOR TO COMPLETION OF PROJECT. IF A CERTIFIED TEST AND <br /> CONTRACTOR SHALL INCLUDE ANY CHANGES REQUIRED BY CODES IN THE GALVANIZED SADDLE BETWEEN THE HANGER AND THE PIPE INSULATION. DOORS WHERE NECESSARY. BALANCE REPORT IS REQUIRED BY LANDLORD, CONTRACTOR SHALL osso <br /> BID AND IF THESE CHANGES ARE NOT INCLUDED IN THE BID, THEY MUST 4. HANGERS AND PIPING OF DISSIMILAR METALS SHALL BE DI-ELECTRICALLY I. INSTALL ALL NECESSARY PIPE HANGERS, SADDLES, AND CARRIERS TO PROPERLY COORDINATE ALL REQUIREMENTS WITH LANDLORD AND LOCAL AUTHORITY <br /> BE QUALIFIED AS A SEPARATE LINE ITEM IN THE BID. AFTER CONTRACT IS <br /> SEPARATED. SUPPORT ALL PIPING AND FIXTURES. HANGERS SHALL SUIT TYPE OF PIPING HAVING JURISDICTION, CONTRACT DIRECTLY WITH AN APPROVED TESTING ANDINSTALLED AND BE SPACED AT A MAXIMUM SPAN OF 5 FEET. PROVIDE SWAYISSUED, NO ADDITIONAL COST DUE TO CODE ISSUES SHALL BE REIMBURSED BALANCING AGENCY, AND PROVIDE COMPLETE REPORT TO OWNER AND <br /> AND SEISMIC BRACING WHERE REQUIRED BY CODES.NTRACTOR. DIVISION 15300 - FIRE PROTECTION (IF APPLICABLE) LANDLORD. EkHIMHES <br /> J. STERILIZE WATER SYSTEM IN ACCORDANCE WITH LOCAL CODES. 2. IF REQUIRED BY THE LANDLORD OR THE LOCAL AUTHORITY HAVING <br /> SECTION 15004 - LICENSES, PERMITS, INSPECTIONS & FEES SECTION 15301 - SUMMARY OF WORK K. CLEAN-OUTS AND FLOOR DRAINS SHALL BE INSTALLED PER LOCAL CODES. ALL JURISDICTION THE BALANCE REPORT SHALL BE ON THE AABC NATIONAL 3423 S LA. CIENEGA BLVD. <br /> 1. THIS CONTRACTOR SHALL OBTAIN AND PAY FOR ALL LICENSES, PERMITS, A. THIS CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, EQUIPMENT, ETC. FLOOR DRAINS SHALL HAVE DEEP SEAL TRAPS. PROVIDE TRAP PRIMERS FOR STANDARD REPORT FORMS OR THE NEBB CERTIFIED REPORT FORMS AS LOS ANGELES, CA 90016 <br /> INSPECTIONS, AND FEES REQUIRED OR RELATED TO THEIR WORK. NECESSARY FOR, REASONABLY IMPLIED AND INCIDENTAL TO, THE FURNISHING, FLOOR DRAINS. PUBLISHED IN THEIR MOST CURRENT EDITIONS AND SHALL INCLUDE AS A <br /> 2. FURNISH TO TENANT'S PROJECT MANAGER ALL CERTIFICATES OF INSPECTION INSTALLATION, COMPLETION AND TESTING OF ALL THE WORK FOR THE L. ESCUTCHEONS SHALL BE CHROME PLATED, SIZE AS REQUIRED AND PLACED AT FSH: 310/267-4616 <br /> ALL PIPE PENETRATIONS AT WALLS, FLOORS, AND CEILINGS IN FINISHED AREAS. MINIMUM THE FOLLOWING INFORMATION: 842.-4436 <br /> FAX: 310 <br /> AND FINAL INSPECTION APPROVAL AT COMPLETION OF PROJECT. SPRINKLER SYSTEMS AS CALLED FOR IN THE SPECIFICATIONS, AND AS REQUIRED 2.A. AABC OR NEBB CERTIFICATION NUMBER AND SIGNATURE OF BALANCING / <br /> BY JOB CONDITIONS, TO INCLUDE, BUT NOT BE LIMITED TO THE FOLLOWING: M. LEAKAGE TESTS SHALL BE PER LOCAL CODES. CONTRACTOR. <br /> SECTION 15005 - TRADE NAMES, MANUFACTURERS AND SHOP DRAWINGS 1. INSTALLATION OF NEW WET SPRINKLER SYSTEM AS REQUIRED TO PROVIDE N. FLASHING SHALL BE SEALED WATERTIGHT AND PERFORMED IN ACCORDANCE TO 2.B. COPY OF A CERTIFICATE OF CONFORMANCE WITH NATIONAL STANDARDS <br /> 1. WHERE TRADE NAMES AND MANUFACTURERS ARE USED ON THE DRAWINGS COVERAGE IN ACCORDANCE , NFPA-13, LOCAL CODES, AND LANDLORD'S THE LANDLORD'S CRITERIA. USE A LANDLORD APPROVED ROOFING CONTRACTOR SE.E'S CONTACT <br /> WHERE APPLICABLE AND INCLUDE ALL COSTS IN BID. FOR THIS PROJECT. <br /> OR IN THE SPECIFICATIONS, THE EXACT EQUIPMENT SHALL BE USED ASA CRITERIA. 2.C. INSTRUMENTATION LIST WITH LAST CALIBRATION DATES. RICHARD ESCALANTE <br /> MINIMUM FOR THE BASE BID. MANUFACTURERS CONSIDERED AS AN EQUAL 2. TAPS, RISERS, LATERALS, BRANCHES, VALVES, ALARMS, SPRINKLER HEADS 0. PROVIDE WATER METER AND REMOTE READER PER LANDLORD'S CRITERIA OR 2.D. MAKE AND MODEL NUMBERS OF ALL HVAC EQUIPMENT TESTED. AIR 310/ 267-4616 <br /> OR BETTER IN ALL ASPECTS TO THAT SPECIFIED WILL BE SUBJECT TO AND ALL COMPONENTS REQUIRED FOR A COMPLETE SYSTEM. LOCAL UTILITIES REQUIREMENTS IF APPLICABLE. CFM AND STATIC PRESSURE READINGS (DISCHARGE AND SUCTION) AS <br /> APPROVAL IN WRITING BY TENANT'S PROJECT MANAGER THROUGH PRIOR 3. DESIGN DRAWINGS, HYDRAULIC CALCULATIONS, SUBMITTALS AND APPROVALS. P. GAS PIPING MEASURED BY PITOT TUBE DUCT TRAVERSE AT THE UNIT. Tim R. Benson <br /> SHOP DRAWING SUBMITTAL PROCESS, FOR ACCEPTANCE. THE USE OF ANY 4. PERMITS, FEES, INSPECTIONS AND CHARGES. 1. PROVIDE A COMPLETE GAS PIPING SYSTEM IF APPLICABLE. REFER TO 2.E. MOTOR NAMEPLATE DATA WITH ACTUAL FIELD VOLTAGE AND AMPERAGE <br /> UNAUTHORIZED EQUIPMENT SHALL BE SUBJECT TO REMOVAL AND 5. TESTS AND TEST CERTIFICATES. IT IS INTENDED THAT THE CONTRACTOR PLANS TO DETERMINE IF A GAS SYSTEM IS REQUIRED. READINGS FOR EACH LEG. ARCHITEC'T'S PROJECT MANAGER <br /> REPLACEMENT AT THE CONTRACTOR'S EXPENSE. SHALL PROVIDE A COMPLETE AND FUNCTIONAL SYSTEM. 2. GAS LINES SHALL BE BLACK STEEL, SCHEDULE 40, ASTM A-120, WITH 608/ 785-2.760 <br /> " <br /> B. THIS FIRE PROTECTION CONTRACTOR IS RESPONSIBLE FOR SUBMITTING MALLEABLE THREADED FITTINGS FOR 2AND SMALLER, AND WITH WELDED 2.F. MOTOR AND FAN RPMS, SHEAVE SIZES AND BELT SIZES. <br /> 2. MECHANICAL CONTRACTOR SHALL SUBMIT ONLY SUBSTITUTION REQUESTS TO 2.G. OUTSIDE, RETURN, MIXED AND SUPPLY AIR TEMPERATURES AND %_ <br /> TENANT'S PROJECT MANAGER FOR APPROVAL. SUBMISSIONS SHALL BE MADE COORDINATED DRAWINGS, HYDRAULIC CALCULATIONS, HEAD TYPES AND COLORS JOINTS FOR 2-1/2" AND LARGER. VOLUMES SHALL BE MEASURED AT FULL COOLING WITH MINIMUM <br /> EARLY ENOUGH IN PROJECT TO ALLOW FOUR 4 WORKING DAYS FOR TO ALL AUTHORITIES HAVING JURISDICTION FOR APPROVAL. NO WORK SHALL 3. PROVIDE A GAS COCK, PRESSURE REGULATOR (IF REQUIRED) DIRT LEG, +r 0 0 <br /> ( ) OUTSIDE AIR. RETURN/RELIEF/SMOKE EVACUATION AIRFLOW SHALL BE -W 2 •- a o <br /> TENANT'S PROJECT MANAGER'S REVIEW WITHOUT CAUSING DELAYS OR BEGIN UNTIL ALL APPROVALS HAVE BEEN RECEIVED. UNION CONNECTION, TO EACH PIECE OF EQUIPMENT. BALANCED AND MEASUREMENTS RECORDED BY PITOT DUCT TRAVERSE c 'v E •' "a <br /> CONFLICTS TO THE JOB'S PROGRESS. SUBMITTALS SHALL BEAR THE STAMP 4. PITCH PIPING AT A UNIFORM GRADE OF 1/4!' IN 15 FEET UPWARD IN AT FULL ECONOMIZER AND POWER EXHAUST. C 4) p 4) <br /> OF GENERAL CONTRACTOR AND THE SUB-CONTRACTOR SHOWING THAT THEY SECTION 15302 - MATERIALS DIRECTION OF FLOW. SUPPORT PIPING EVERY 5 FEET. SUPPORT AS date ° aAS - .. u > comments <br /> A. SPRINKLER HEADS: 2.H. MAKE AND MODEL NUMBERS OF ALL AIR DISTRIBUTION EQUIPMENT. <br /> HAVE REVIEWED AND CONFIRMED THAT THE SUBMITTALS ARE IN REQUIRED BY LANDLORD CRITERIA, AS DETAILED ON DRAWINGS, OR BY 2.1. FINAL BALANCED AIR VOLUMES AT ALL OUTLETS (INCLUDING RETURNS 07/03/2.0 O <br /> CONFORMANCE WITH THE CONTRACT DRAWINGS AND SPECIFICATIONS OR 1. ALL SPRINKLER HEADS SHALL BE NEW U.L., F.M. LISTED AND APPROVED STANDARD INDUSTRY PRACTICE, WHICHEVER IS MORE STRINGENT. BUILT <br /> AUTOMATIC SPRAY TYPE AS MANUFACTURED BY GRINNELL, RELIABLE, STAR, WHERE DUCTED). <br /> INDICATE WHERE EXCEPTIONS HAVE BEEN TAKEN. 5. GAS PIPING EXPOSED ON ROOF MUST BE PRIMED AND PAINTED WITH 2.J. INDEXED PLAN WITH DIFFUSER AND RETURN LOCATIONS. ALSO PRELIM <br /> OR VIKING. RUST-INHIBITING PAINT. REVIEW p7/31/20 ®O <br /> SECTION 15006 - GUARANTEE 2. ALL SPRINKLER HEADS SHALL HAVE ORDINARY TEMPERATURE RATING 6. GAS PIPING INSTALLED IN RETURN AIR PLENUMS SHALL BE SLEEVED AND INDICATE IF DIFFUSER IS 3-WAY OR 2-WAY. <br /> UNLESS INDICATED OTHERWISE ON DRAWINGS OR REQUIRED BY LOCAL 2.K. FINAL BALANCED GPM AT ALL UNITS FOR CHILLED/HOT/CONDENSER BIDE <br /> 1. THIS CONTRACTOR SHALL GUARANTEE ALL MATERIALS AND WORK PROVIDED VENTED OR WELDED IN ACCORDANCE WITH THE LOCAL GAS COMPANY, WATER WHEN APPLICABLE. 06/11/20 000 O O <br /> UNDER THEIR CONTRACT AND SHALL MAKE GOOD, REPAIR OR REPLACE AT CODES. LOCAL CODE, AND APPLICABLE NFPA 54 CODES. PERMI'T' <br /> THEIR OWN EXPENSE, ANY DEFECTIVE WORK, MATERIAL, OR EQUIPMENT 3. VERIFY HEAD TYPES AND COLORS WITH TENANT AND SUBMIT WITH 7. TESTING AND PURGING OF GAS PIPING SHALL BE DONE PER THE 2.L. CHILLED/HOT/CONDENSER ENTERING AND LEAVING WATER <br /> WHICH MAY BE DISCOVERED WITHIN A PERIOD OF 12 MONTHS FROM THE SPRINKLER DRAWINGS FOR PERMIT. REQUIREMENTS OF THE LOCAL GAS COMPANY, LOCAL CODES, AND TEMPERATURES WHEN APPLICABLE. <br /> DATE OF ACCEPTANCE (IN WRITING) OF THE INSTALLATION BY TENANT'S 4. LOCATIONS OF ALL HEADS SHOULD BE APPROVED BY TENANT AND THE APPLICABLE NFPA 54 CODES. 2.M. PRESSURE DROP THROUGH COILS AND CONTROL VALVES WHEN <br /> PROJECT MANAGER. EXTENDED WARRANTIES ARE AS SPECIFIED WITH LOCAL FIRE PROTECTION OFFICIAL BEFORE INSTALLATION. 8. CONTACT AND COORDINATE GAS SERVICE AND METER REQUIREMENTS WITH APPLICABLE. <br /> INDIVIDUAL EQUIPMENT. B. PIPING: THE LOCAL GAS COMPANY AND THE MALL'S OPERATIONS MANAGER PRIOR 3. IF REQUIRED BY THE LANDLORD OR THE LOCAL AUTHORITY HAVING <br /> 1. SCHEDULE 40, BLACK STEEL PIPE, ASTM A-53 FOR FERROUS PIPING, TO BID. INCLUDE INSTALLATION OF GAS METER AND REGULATOR COSTS IN JURISDICTION THE GENERAL CONTRACTOR SHALL ARRANGE FOR THE TEST <br /> BID <br /> CORD DRAWINGS . <br /> WELDED AND SEAMLESS, ANSI B-36-10-70 FOR WROUGHT STEEL PIPE. AND BALANCE A MINIMUM OF TWO WEEKS PRIOR TO THE REQUIRED DATE <br /> SECTION 15007 - RE <br /> A. THIS CONTRACTOR SHALL MAINTAIN ONE COPY OF DRAWINGS ON THE JOB SITE 2. CAST IRON OR MALLEABLE IRON SCREWED FITTINGS FOR PIPES 2 INCHES AFTER RETURNING TABC'S "START UP CHECK LIST'. ALL WORK SHALL BE <br /> TO RECORD DEVIATIONS FROM CONTRACT DRAWINGS, SUCH AS: AND SMALLER. SCREWED OR CAST IRON FLANGED JOINTS FOR PIPES DIVISION 15500 - HEATING, VENTILATING, AIR CONDITIONING COMPLETED PRIOR TO SCHEDULING AIR BALANCE. IN ADDITION, THE <br /> 1. LOCATION OF CONCEALED PIPING VALVES AND DUCTS. LARGER THAN 2 INCHES. BALANCE CONTRACTOR WILL INSPECT AND PREPARE A FINAL PUNCH LIST. drawn by: checked by: <br /> 2. REVISIONS, ADDENDUMS, AND CHANGE ORDERS. 3. GALVANIZED OR BLACK MALLEABLE IRON WITH BRASS SEAT SCREWED SECTION 15501 - SUMMARY OF WORK THE HVAC CONTRACTOR SHALL REPAIR OR REPLACE ANY DEFECTIVE <br /> 3. SIGNIFICANT DEVIATIONS MADE NECESSARY BY FIELD CONDITIONS, APPROVED UNIONS FOR PIPES 2 INCHES AND SMALLER. A. THIS CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, EQUIPMENT, ETC. MATERIALS, EQUIPMENT OR WORKMANSHIP PRIOR TO TENANT'S FINAL WALK DS GS <br /> 4. VICTAULIC TYPE COUPLINGS ARE ACCEPTABLE, WHERE APPROVED BY CODE THRU AND BEFORE FINAL PAYMENT WILL BE MADE. <br /> EQUIPMENT SUBSTITUTIONS, AND CONTRACTOR'S COORDINATION WITH OTHER NECESSARY FOR, REASONABLY IMPLIED AND INCIDENTAL T0, THE FURNISHING, <br /> TRADES. AND THE LANDLORD. INSTALLATION, COMPLETION AND TESTING OF ALL THE WORK FOR THE HVAC 4. FOUR COPIES OF THE BALANCE REPORT SHALL BE SUBMITTED TO TENANT THIS SHEET CONTAINS: <br /> 5. HANGERS SHALL COMPLY WITH LANDLORD AND CODE REQUIREMENTS. AND FOUR COPIES TO THE LANDLORD FOR APPROVAL. <br /> B. AT COMPLETION OF THE PROJECT AND BEFORE FINAL APPROVAL, THE SYSTEMS AS CALLED FOR IN THE SPECIFICATIONS, SHOWN ON DRAWINGS AND <br /> CONTRACTOR SHALL MAKE ANY FINAL CORRECTIONS TO DRAWINGS AND CERTIFY C. SPRINKLER SPACING SHALL NOT EXCEED 13 5. OPERATION AND MAINTENANCE DOCUMENTATION MUST BE PROVIDED TO THE 0 SQ. FT. IN "SALES" AREAS AND AS REQUIRED BY JOB CONDITIONS, TO INCLUDE, BUT NOT BE LIMITED TO THE MECHANICAL AND PLUMBING <br /> THE ACCURACY OF EACH PRINT BY SIGNATURE THEREON. ONE COPY OF THE 100 SQ. FT. IN "STOCK" AREAS. COMPLY WITH LANDLORD'S DESIGN CRITERIA. FOLLOWING: OWNER THAT INCLUDES AT LEAST THE FOLLOWING INFORMATION: SPECIFICATIONS <br /> MOST RECENT SET OF DRAWINGS WITH TEMPERATURE CONTROL DRAWINGS PIPE SIZING SHALL BE BASED ON NFPA ORDINARY HAZARD. 1. ONE (1) PACKAGED 5 TON HEAT PUMP UNIT WITH ALL ASSOCIATED 5.A. EQUIPMENT CAPACITY (INPUT AND OUTPUT) AND REQUIRED <br /> INCLUDED SHALL BE DELIVERED TO TENANT'S PROJECT MANAGER. D. ALL SPRINKLER LINES SHALL BE INSTALLED CONCEALED, AVOIDING DUCTWORK, DIFFUSERS/GRILLES SPECIFIED ON PLANS. ONE (1) NEW MAINTENANCE ACTIONS. <br /> INTERFERENCE WITH OTHER TRADES. CEILING MOUNTED TOILET EXHAUST FAN WITH ASSOCIATED DUCTWORK. 5.B. EQUIPMENT OPERATION AND MAINTENANCE MANUALS. <br /> SECTION 15008 - DISCREPANCIES IN DOCUMENTS E. WHERE POSSIBLE, REWORK THE EXISTING SPRINKLER SYSTEM TO MEET THE NEW 2. THE AIR DEVICES AS NOTED ON THE PLANS SHALL BE PURCHASED BY THE 5.C. HVAC SYSTEM CONTROL MAINTENANCE AND CALIBRATION INFORMATION, <br /> 1. DRAWINGS AND SPECIFICATIONS ARE TO BE CONSIDERED AS SUPPLEMENTING REQUIREMENTS OF THIS DESIGN AND INCLUDE ALL COSTS TO RAISE OR CONTRACTOR. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SCHEDULING, INCLUDING WIRING DIAGRAMS, SCHEMATICS, AND CONTROL SEQUENCE <br /> EACH OTHER. WORK SPECIFIED BUT NOT SHOWN ON DRAWINGS, OR SHOWN RELOCATE EXISTING PIPING TO OBTAIN CEILING HEIGHTS SHOWN ON DRAWINGS. RECEIVING, VERIFYING QUANTITIES AND INSPECTING FOR DAMAGE AND FILING DESCRIPTIONS; DESIRED OR FIELD-DETERMINED SET POINTS MUST BE <br /> ON DRAWINGS BUT NOT SPECIFIED, SHALL BE PERFORMED OR FURNISHED IN NEW CONSTRUCTION THE LANDLORD MAY PROVIDE ONLY A STUB-IN TO THE OF ANY CLAIM FORMS. REFER TO RESPONSIBILITY SCHEDULE AND AIR PERMANENTLY RECORDED ON CONTROL DRAWINGS, AT CONTROL <br /> AS THOUGH MENTIONED IN BOTH SPECIFICATIONS AND DRAWINGS. IF NOT SPACE. THE CONTRACTOR SHALL CONNECT AND EXTEND NEW PIPING AS DEVICE SCHEDULE ON PLANS. DEVICES, OR, FOR DIGITAL CONTROL SYSTEMS, IN PROGRAMMING <br /> OTHERWISE DIRECTED, INSTALLATION OF ALL SYSTEMS AND EQUIPMENT REQUIRED. VERIFY ALL REQUIREMENTS PRIOR TO BID. 3. ALL MATERIALS SHALL BE NEW AND SHALL FIT THE SPACE AVAILABLE. COMMENTS. <br /> SHALL BE IN ACCORDANCE WITH APPLICABLE CODES AND IN ACCORDANCE F. PROVIDE AND INSTALL A VALVED TEST CONNECTION IN AN ACCESSIBLE LOCATION VERIFY ALL DIMENSIONS AT THE SITE. 5.D. COMPLETE NARRATIVE OF HOW EACH SYSTEM IS INTENDED TO <br /> WITH MANUFACTURER'S INSTALLATION INSTRUCTIONS. WHERE WORK FOR THE SPRINKLER SYSTEM AS REQUIRED OR REQUESTED BY THE MALL, 4. ALL VALVES, DAMPERS, ETC. SHALL BE SO LOCATED AND INSTALLED TO OPERATE. ALL PIPING SHALL WITHSTAND AIR PRESSURE TESTING PER <br /> DESCRIBED IN THE SPECIFICATIONS IS IN CONFLICT WITH THE WORK SHOWN LOCAL INSPECTOR, OR TENANT'S INSURANCE CARRIER. PERMIT ACCESS FOR SERVICE WITHOUT DAMAGE TO BUILDING OR FINISHED GOVERNING PLUMBING CODE. <br /> ON THE DRAWINGS, THE CONTRACTOR SHALL SUPPLY THE GREATER G. THIS CONTRACTOR SHALL BE RESPONSIBLE FOR DAMAGE CAUSED BY LEAKS IN MATERIALS. <br /> QUANTITY, QUALITY AND COST VIA THE BID AND CONTACT THE ENGINEER ANY OF THE EQUIPMENT INSTALLED BY THEM. ALL REPAIRS OR REPLACEMENT <br /> FOR CLARIFICATION ON DIRECTION PRIOR TO INSTALLATION. OF DAMAGES SHALL BE AT THIS CONTRACTOR'S EXPENSE. SECTION 15502 - MATERIALS <br /> H. PROPERLY COMPLETED AND SIGNED "SPRINKLER CONTRACTOR'S MATERIAL AND A. REFER TO PLANS FOR SCHEDULES OF EQUIPMENT. ALL EQUIPMENT SHALL BE <br /> TEST CERTIFICATES" SHALL BE FURNISHED TO THE LANDLORD, AND AUTHORITIES COMPLETE IN EVERY RESPECT WITH ALL DEVICES, APPURTENANCES, AND <br /> HAVING JURISDICTION. ACCESSORIES PROVIDED TO MEET THE DESIGN INTENT AND OPERATION OF THE <br /> SYSTEMS SHOWN ON THE DRAWINGS AND SPECIFIED HEREIN. EQUIPMENT SHALL <br /> BE INSTALLED IN STRICT ACCORDANCE WITH THE MANUFACTURER'S MP1 <br /> ARCHITECT'S COMMISSION NUMBER <br />