Laserfiche WebLink
UST SYSTEM REMOVAL AND REPLACEMENT REPORT <br /> Introduction <br /> January 22, 2021 <br /> In January 2009,fuel dispensers and product piping were removed and replaced. One soil sample was collected <br /> during the fuel system upgrade activities. Benzene,TPHg, and MTBE were not detected above laboratory reporting <br /> limits in the soil sample. <br /> In March 2014,the seven groundwater monitoring wells and two remediation wells were destroyed. Case closure was <br /> granted on June 23, 2014. <br /> \\us0385-ppfss01\workgroup\1858\active\185851012\05_report_deliv\deliverable\reports\2021_rpt_20632_ust.docx 1.2 <br />