My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
88 (STATE ROUTE 88)
>
13975
>
2300 - Underground Storage Tank Program
>
PR0231622
>
INSTALL_2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:21:41 AM
Creation date
12/23/2020 9:14:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2012
RECORD_ID
PR0231622
PE
2351
FACILITY_ID
FA0000055
FACILITY_NAME
TESORO (SPEEDWAY) #68150
STREET_NUMBER
13975
Direction
E
STREET_NAME
STATE ROUTE 88
City
LOCKEFORD
Zip
95237
APN
01908014
CURRENT_STATUS
01
SITE_LOCATION
13975 E HWY 88
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TesorWUSA#68150 13975 E. Hwy 88 Lockeford, CA 95237 SR0064416 <br /> sump liquid sensor. Per the cut sheet supplied, Mag Sump Sensors Veeder Root <br /> 857080-111 can be used frx gasoline or diesel. <br /> SEE REVISED PAGE 8 OF THE APPLICATION LISTS <br /> 6. Page 8 section I of the application lists Manufacturer VR Model 330160-064 as the <br /> automatic line leak detector. VR Model 330160-064 is an Information Systems <br /> Diagnostics Software Enhancement Module. The site plan sheet TK2-1 specifies <br /> equipment list hem #83 PLLD Controller w/No Switch Check Valve Veeder Root 848480- <br /> 001. The site plan sheet TK3-2 section A and B, TK3-3 section A and B specify <br /> equipment list item #83 as Ute automatic line leak detector. Resubmit page 8 of the <br /> install application with the correct automatic line leak detector listed. <br /> SEE REVISED PAGE 8 OF THE APPLICATION LISTS <br /> 7, The site plan sheet TK1-D lists the San Joaquin Canty Fire Department in the first <br /> sentence and in #2, S. 7, 8, and 10 of the closure permit section, in the last sentence of <br /> the special notice to underground tank removal contractors section, and on the site plan <br /> sheet TK2-3 in the last sentence in #28 of the general notes. Resubmit the plan sheet <br /> TK1-D and TK2-3, remove the San Joaquin County Fire Department, and replace h with <br /> the San Joaquin County Environmental Health DepartmonL <br /> SEE REVISED SHEETS TK1-D do TK2-3 <br /> 8. The site plan sheet TK1-D In #8 of the closure permit section has rrdWng information in <br /> the second sentence. 'A minimum of two samples shall be taken under each tank -one <br /> at state lift manual). Resubmit the plan sheet TK1-D with the correct version in #8 of the <br /> closure permit section. SEE REVISED SHEET TK1-D <br /> 9, the site plan sheet TKI-D in #14 of the closure permit section and in #4 and 5 of the <br /> special notice to underground tank removal contractors section fists the Ray Area Air <br /> Quality Management District (BAAQMD). Resubmit the plan sheet Tkt-D, remove the <br /> Ray Area Air Quality Management DisVid(BAAQMD), and replace it with the San <br /> Joaquin Valley Air Pollution Control District. SEE REVISED SHEET TK1—D <br /> 10. The site plan sheet TKt-1 in#12 of the technical description & swpe of work section <br /> states 'Existing veeder root system to remaln"-According to the facility monitoring plan <br /> the existing monitoring panel is a Gifbareo EMC. The site plan sheet TK2-1 in #1 of the <br /> equipment list specifies a TLS 350 Plus Leak Detection Console. Resubmit the site plan <br /> specifying which monitoring panel will be installed. SEE REVISED SHEET TK1-1 <br /> 11. The site plan sheet TK1-1 in#14 of the technical description &scope of work section <br /> indicates that a new ball float valve will be instalBed on the fill riser. A ball float valve <br /> cannot be installed on a fill riser. Resubmit the site plan sheet TK1-1 without Ilse part of <br /> installing ball float valves on the fill riser. SEE REVISED SHEET TK1-1 <br /> 12. The site plan sheet TKi-1 In#4 and 5 of the technical description &sopa of work <br /> section indicates that a five gallon overfill containment box will be installed. This <br /> equipment is not listed on the site plan sheet TK2-1 nor have cut sheets been provided_ <br /> Resubmit the silo plan sheet TK2-1 specifying which five gallon overfill containment <br /> boxes wHl be installed and provide cut sheets with third party certifications and the <br /> manufacturers training certifications of the contractor. SEE REVISED SHEET TK2-1 <br /> 13. The site plan sheet TK2-1 in #54 and 55 of the equipment list section indicate that a <br /> galvanized iron pipe riser will be installed. Galvanized iron pipe is not allowed for diesel <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.