My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRESNO
>
1524
>
2300 - Underground Storage Tank Program
>
PR0506545
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2021 2:37:38 PM
Creation date
1/5/2021 8:16:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0506545
PE
2361
FACILITY_ID
FA0007491
FACILITY_NAME
VALLEY PACIFIC FRESNO AVE CARDLOCK
STREET_NUMBER
1524
STREET_NAME
FRESNO
STREET_TYPE
AVE
City
STOCKTON
Zip
95206
APN
16337025
CURRENT_STATUS
01
SITE_LOCATION
1524 FRESNO AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 6. TANK SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ® Manufacturer © Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure © Vacuum ❑ Hydrostatic <br /> Test Equipment Used: 0-30inHg. 4" Vacuum Gauges w/ 0.05 graduations <br /> Tank ID T1:Diesel <br /> Tank Manufacturer Modern Welding <br /> Tank Capacity 20,000 <br /> Test Start Time 8:35am <br /> Initial Reading -10hg <br /> Test End Time 10:35am <br /> Final Reading -10hg <br /> Change in Reading 0 <br /> Pass/Fail Criteria No Loss <br /> Tightness Test Results 1 ® Pass ❑ Fail 1 ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> 7. PIPE SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ® Manufacturer © Industry Standard ❑ Professional Engineer <br /> Test Type © Pressure ❑ Vacuum ❑ Hydrostatic <br /> Test Equipment Used: Dual 0-15psi 4" Pressure Gauges w/ 0.05 graduations <br /> Pipe Run ID DSL Prod Line 1 DSL Prod Line 2 <br /> Pipe Manufacturer OPW Flex Works OPW Flex Works <br /> Test Start Time 9:00am 9:00am <br /> Initial Reading 5 psi 5 psi <br /> Test End Time 10:00am 10:00am <br /> Final Reading 5 psi 5 psi <br /> Change in Reading 0 0 <br /> Pass/Fail Criteria No Loss No Loss <br /> Tightness Test Results ® Pass ❑ Fail ❑x Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Pipe Run ID <br /> Pipe Manufacturer <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results ❑ Pass ❑ Fail ❑ Pass ❑ Fail I ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail'and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 2of5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.