Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMP/UDC TEST <br /> Test Method Developed by ® Manufacturer © Industry Standard ❑ Professional <br /> Engineer <br /> Test Type ❑ Pressure ❑ Vacuum ® Hydrostatic <br /> Test Equipment Used: F.F.S. Incon TS-STS Sump Tester w/ + or — 0.002" graduations <br /> Sump/UDC ID T1: STP UDC 1-2 SAT 2-3 UDC 3-4 <br /> Sump Manufacturer Western Fiberglass Bravo Bravo Bravo <br /> Sump Depth (inches) 49" 32" 32" 32" <br /> Sump Bottom to Top of 22" 6" 6" 6" <br /> Highest Pipe <br /> Penetration (inches) <br /> Test Start Time 11:40am 10:19am 10:19am 10:19am <br /> Initial Reading 5.2065" 3.2495" 5.3630" 0.7261" <br /> Test End Time 11:55am 10:34am 10:34am 10:34am <br /> Final Reading 5.2066" 3.2491" 5.3628 0.7260" <br /> Change in Reading +0.0001" -0.0004" -0.0002" -0.0001" <br /> Pass Fail Criteria +/- 0.002 +/- 0.002 +/- 0.002 +/- 0.00 <br /> Tightness Test Results ® Pass ❑ Fail ❑x Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail <br /> Sump/UDC ID SAT 1 <br /> Sump Manufacturer Bravo <br /> Sump Depth (inches) 32" <br /> Sump Bottom to Top of 6" <br /> Highest Pipe <br /> Penetration inches <br /> Test Start Time 10:42am <br /> Initial Reading 3.5967" <br /> Test End Time 10:58am <br /> Final Reading 3.5970" <br /> Change in Reading -0.0003" <br /> Pass/Fail Criteria +1- 0.002 <br /> Tightness Test Results ® Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail'and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 3 of 5 <br />