Laserfiche WebLink
B. Operation and liaintenance Costs <br /> Operation and maintenance costs include , but. are not <br /> necessarily '1'imited to, all expenses for labor , . materials , con =:f <br /> ract services , special services , chemicals, energy , supplies , ':;'i?,'• <br /> ,.:!equipment , . machinery, inspection, monitoring , supervision, <br /> •.administration , fiscal and technical assistance., .and insurance, <br /> 1. Treatment -- It is assumed that the quality and <br /> Quantity of wastewater, from land uses in unincorporated <br /> :, County, areas are similar to or like the .tvastelvater generated <br /> _ .T;�'�:: ): • . _. .. ;,;::•:,Vit' <br /> -..by 'comparable uses in City, Allocation of costs to users_ .z.y . <br /> for treatment of: wastewater shall ' be'.based upon • the class <br /> =�`j of -user and the same arameters. used b Cit. to establish <br /> City rates <br /> 2. Transport Costs for transport of user's waste <br /> water shall be allocated to user as a percentage of City-'s <br /> costs for the 0 & Al for interceptors and pumping facilities <br /> used by County. The percentage for cost .allocation• is <br /> represented by the ratio of the capacity used by County to <br /> the total capacity of City facility used by County. „ <br /> 3. Infiltration and inflow characteristics -for County <br /> collection systems are assumed to be similar or like City [il` <br /> collection. systems for the purpose of allocating- 'such <br /> operational costs. <br /> SECTION 15. PAYMENT OF COSTS <br /> A. Connection Pees <br /> 1. Connection fees for new users shall be the same <br /> in* County as in City , and according to the schedule <br /> prevailing at the time of application . <br /> 16 <br />