My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
C E DIXON
>
6755
>
2231-2238 – Tiered Permitting Program
>
PR0543482
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2021 10:07:39 AM
Creation date
1/7/2021 8:40:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2231-2238 – Tiered Permitting Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0543482
PE
2232
FACILITY_ID
FA0022432
FACILITY_NAME
HEINZ SEED OPERATIONS
STREET_NUMBER
6755
STREET_NAME
C E DIXON
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17726030
CURRENT_STATUS
01
SITE_LOCATION
6755 C E DIXON ST
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hazardous Waste Tank ��__A <br /> System Integrity Report <br /> ==M= = <br /> For <br /> HMT Inspection <br /> The Kraft Heinz Company <br /> Stockton CA February 1 <br /> � o 34 Page 16 of 34 <br /> 3.2 PIPING ASSESSMENT AND EVALUATION <br /> We have evaluated the tank connecting piping and find the following to be true: <br /> Tank connecting piping has now and will continue to contain in the future process <br /> liquids that may contain hazardous materials. <br /> The following assessment details are known or have been evaluated: <br /> 1. Pursuant to Section §66265.193, the connecting piping is <br /> designed and constructed with single-wall details and is situated <br /> within an area that will drain into the concrete containment area <br /> should any minor leak of stored liquid occur. The hazardous <br /> materials action plan currently in place at the facility provides that <br /> any leakage or spills in this area will be cleaned up as soon as <br /> detected (visual monitoring of this area is performed daily by the <br /> operators responsible for this operations area). <br /> 2. Pursuant to 22 CCR §66265.193; The connecting piping is free of <br /> defects and may temporarily retain these process liquids until such <br /> leaks or spills are detected and cleaned up; <br /> 3. Pursuant to 22 CCR §66265.193; The connecting piping to the <br /> tanks is adequately constructed according to accepted industry <br /> practice; <br /> 4. Pursuant to 22 CCR §66265.193; The connecting piping is <br /> properly designed and of suitable strength and thickness; <br /> 5. Pursuant to 22 CCR §66265.193; The hazardous materials <br /> action plan currently in place at the facility provides that any <br /> leakage or spills from the tank piping will be cleaned as soon as <br /> detected (visual monitoring of this area is performed by the <br /> operators responsible for this operations area); <br /> NDTRPTNE.DOT REV 2 23264941 Hazardous Wast Tank r3(Rev 1).doc 3/16/2021 1:52 PM <br />
The URL can be used to link to this page
Your browser does not support the video tag.