Laserfiche WebLink
Hazardous Waste Tank bib,-� <br /> System Integrity Report <br /> ==M= = <br /> For <br /> HMT Inspection <br /> The Kraft Heinz Company <br /> Stockton CA February 1 <br /> � o 34 Page 15 of 34 <br /> CONTAINMENT ASSESSMENT AND EVALUATION (CONT'D.) <br /> 6. Pursuant to 22 CCR §66265.193(e)(1)(a) and (b); This secondary <br /> containment (secondary tank) is not exposed to the weather with <br /> the flexible cover in place and meets the volume requirements <br /> based on the area contained; <br /> 7. Pursuant to 22 CCR §66265.193(e)(1)(c); This secondary <br /> containment (secondary tank) is free of cracks and gaps; <br /> 7. Pursuant to 22 CCR §66265.193(d); This secondary containment <br /> (secondary tank) is designed and installed to completely surround <br /> the tank and to cover all surrounding earth likely to come into <br /> contact with the waste if released from the tank; <br /> 8. Pursuant to 22 CCR §66265.193(f) (1); The ancillary equipment <br /> is visually inspected for leaks on a daily basis; <br /> NDTRPTNE.DOT REV 2 23264941 Hazardous Wast Tank r3(Rev 1).doc 3/16/2021 1:52 PM <br />