Laserfiche WebLink
<br />PA-1900284 – Informational Letters 16 <br />Pacific Gas and <br />Electric Company <br />December 17, 2019 <br />Teddie Hernandez <br />San Joaquin County <br />1810 E. Hazelton Dr. <br />Stockton CA, 95205 <br />Ref: Gas and Electric Transmission and Distribution <br />Dear Mr. Hernandez <br />Plan Review T tan <br />Lind Managem!'.111: <br />PGEPlaiRevielll@pge.com <br />81 ff BoMng«-Can)On Road 337M <br />San Ramon, CA 94583 <br />Thank you for submitting 4010 East Fremont St -PA-1900284 plans for our review. PG&E will <br />review the submitted plans in re lationship to any existing Gas and Electric facilit ies within the <br />project area. If the proposed project is adjacent/or within PG&E owned property and/or <br />easements , we will be working with you to ensure compatible uses and activities near our <br />facilities. <br />Attached you will find information and requirements as it relat es to Gas facilrties (Attachment 1) <br />and Electric facilities (Attachment 2). Please review these in detail, as it is critica l to ensure <br />your safety and to protect PG&E's facilities and its existing rights. <br />Below is additional information for your review: <br />1. This plan re view process does not replace the application process for PG&E gas or <br />electric service your project may require. For these requests, please continue to work <br />with PG&E Service Planning : https://www.pge.com/en US/business/services/building- <br />and-renovation/overview/overview. page. <br />2. If the project being submitted is part of a larger project , please include the entire scope <br />of your project, and not just a portion of it. PG&E's facilities are to be incorpora ted within <br />any CEQA document. PG&E needs to verify that the CEQA document will identify any <br />required future PG&E services . <br />3 . An engineering deposit may be requ ired to review plans for a project depending on t he <br />size, scope, and location of the project and as it relates to any rearrangement or new <br />installation of PG&E facilrties . <br />Any proposed uses within the PG&E fee strip and/or easement, may include a California Public <br />Utility Commission (CPUC) Section 851 filing. This requires the CPUC to render approval for a <br />conveyance of rights for specific uses on PG&E's fee strip or easement. PG&E will advise if the <br />necessity to incorporate a CPUC Section 851filing is req uired. <br />This letter does not constrtute PG&E's consent to use any portion of its easement for any <br />purpose not previously conveyed. PG&E will provide a project specific response as required. <br />Sincerely, <br />Plan Review Team <br />Land Management <br />PG&E Ga s a nd Electric Facilities Page 1