My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013872
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
4010
>
2600 - Land Use Program
>
PA-1900284
>
SU0013872
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2021 8:42:05 AM
Creation date
1/8/2021 11:43:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013872
PE
2631
FACILITY_NAME
PA-1900284
STREET_NUMBER
4010
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95215-
APN
14333029
ENTERED_DATE
1/7/2021 12:00:00 AM
SITE_LOCATION
4010 E FREMONT ST
RECEIVED_DATE
1/7/2021 12:00:00 AM
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />PA-1900284 – Informational Letters 17 <br />Pacific Gas and <br />Electric Company <br />Attachment 1 -Gas Facilities <br />There could be gas transmission pipelines in this area 'M'lich would be considered crttical <br />facilities for PG&E and a high priority subsurface installation under Calrtornia law. Care must be <br />taken to ensure safety a nd accessibility. So, p lease ensure that if PG&E approves work nea r <br />gas transmission pipelines it is done in adherence ~h t he below stipulations . Additiona ll y, the <br />following link pro vides addftional information regarding legal requi rements under Calrtornia <br />excavation laws : https://www.usanorth811 .org/imaqes/pdfs/CA-LAW-2018.pdf <br />1 . Standby Inspection: A PG&E Gas Transmission Standby Inspector must be present <br />during any demolition or construction activtty that comes with in 10 feet of the gas pipeline. This <br />includes all grading, trenching, substructure depth verifications (potholes), asphalt or concrete <br />demolition/removal, removal of trees, signs, light pole s, etc. This inspection can be coordinated <br />through the Underground Service Alert (USA) service at 811. A minimum notice of 48 hours is <br />required. Ensure the USA markings and notifications are maintained th ro ughout the duration of <br />your work. <br />2. Access: At any time, PG&E may need to access. excavate, and perform mrk on the gas <br />pipeline. Any construction equipment. materials, or spoils may need to be remov ed upon notice . <br />Any temporary construction fencing installed ~hin PG&E's easement muld also need to be <br />capable of being removed at any time upon notice . Any plans to cut tempora ry slopes <br />exceeding a 1 :4 grade v.ithin 10 feet of a gas transmission pipe line need to be approved by <br />PG&E Pipeline Services in writing PRIOR to performing the work. <br />3. Wheel Loads: To prevent damage to the buried gas pipeline, there are weight limits that <br />must be enforced whenever any equipment gets wtth in 10 f eet of traversing the pipe. <br />Ensure a list of the axle weights of all equipment being used is available for PG&E 's Standby <br />Inspector. To confirm the depth of cover, the pipeline may need to be potholed by hand in a few <br />areas. <br />Due to the complex va riabilfty of tracked equipment, vibratory compaction e quipment, and <br />cranes, PG&E must evaluate those ftems on a case-by-case basis prior to use over the gas <br />pipeline (provide a list of any proposed equipment of this type noting model numbers and <br />specific attachments). <br />No equipment may be set up over the gas pipeline while operating. Ensure crane outriggers are <br />at least 10 feet from the centerline of the gas pipeline. T ransport trucks must not be parked over <br />the gas pipeline 'M'lile being loaded or unloaded. <br />4 . Grading: PG&E requires a minimum of 36 inches of cover over gas pipelines (or existing <br />grade if less) and a maximum of 7 feet of cover at all location s. The graded surface cannot <br />exceed a cross slope of 1 :4. <br />5. Excavating: Any digging within 2 feet of a gas pipeline must be dug by hand. Note that <br />while the min imum cl earance is only 12 inches, any excavation mrk within 24 inches of the <br />edge of a pipeline must be done v.ith hand tools. So to avoid having to dig a trench entire ly with <br />hand tools, the edge of the trench must be over 24 inches away. (Doing t he math for a 24 inch <br />PG&E Gas a n d Electric Facilities Page 2
The URL can be used to link to this page
Your browser does not support the video tag.