My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LINNE
>
1728
>
2800 - Aboveground Petroleum Storage Program
>
PR0540694
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2021 9:40:13 AM
Creation date
1/11/2021 9:25:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0540694
PE
2832
FACILITY_ID
FA0009536
FACILITY_NAME
CONCRETE INC
STREET_NUMBER
1728
STREET_NAME
LINNE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25311027
CURRENT_STATUS
01
SITE_LOCATION
1728 LINNE RD
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.3 Containment and/or Diversionary Structures or Equipment <br /> — 40 CFR 112.7(c) <br /> Secondary containment for the fuel and oil storage tanks is described in Section 15.2. To <br /> provide containment of a spill outside the tank containment features, ONSITE <br /> PERSONNEL will implement the oil spill contingency plan (refer to Section 7.0). <br /> Spill response equipment staged at the KRC TRACY PLANT consists of the following: <br /> • Spill sorbent cloth (inside shop) <br /> • Hand shovel <br /> • Front end loader and bulk sand <br /> • Absorbent <br /> • Fire extinguishers <br /> 7.0 Oil Spill Contingency Plan — 40 CFR 112.7(d) <br /> The procedures outlined in Appendices: <br /> C. INCIDENT REPORT <br /> D. SPILL RESPONSE DUTY CARD —OIL HANDLING EMPLOYEES <br /> E. SPILL RESPONSE DUTY CARD — INCIDENT COMMANDER <br /> will be implemented in the event of an oil spill at the KRC TRACY PLANT. They are part of this <br /> Spill Plan; they address KNIFE RIVER CORPORATION'S organizational structure for spill <br /> response, the response steps to be taken in responding to an oil or hazardous substance <br /> release, and spill notification and reporting procedures. <br /> One copy of this SPCC Plan is maintained at the KRC TRACY PLANT along with other <br /> environmental documents such as the hazardous material business plan, training records, and <br /> Material Safety Data Sheets. A second copy of the SPCC Plan is maintained by the California <br /> Environmental Manager, KNIFE RIVER CORPORATION office at 655 W Clay Street, Stockton, <br /> CA 95206. <br /> 8.0 Inspections and Records — 40 CFR 112.7(e) <br /> The condition of each tank, including its pipes, fittings, and secondary containment, is inspected <br /> regularly by the General Manager or this designee. Appendix B. MONTHLY FACILITY <br /> INSPECTION REPORT AND CHECKLIST identifies monthly and annual inspection items. The <br /> inspection is documented on a log sheet maintained in the facility office. <br /> In general, inspections are conducted according to the guidelines set forth in the Steel Tank <br /> Institute's SP001 Standard for the Inspection of Aboveground Storage Tanks, 6t" Edition, issued <br /> January 2018. <br /> When any accumulation of precipitation is drained from secondary containment, the person <br /> conducting the drainage will document the event on the log sheet, as described in Section 14.2. <br /> SPCC 263-KRC-TRACY PLANT 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.